{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/8281"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/8281","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"The dynamics of naval shipbuilding : a systems approach","abstract":"Project management in the shipbuilding industry is a complex and misunderstood field. Ship programs are often delivered behind schedule and over budget. Many external factors can cause a relatively well-run program to experience problems. These include material shortages, labor problems or customer generated design changes. Even harder for a manager to understand are internally generated problems from sources like overtime use, hiring and firing policy, and cost estimating. Project managers do not understand or have the tools to measure many of the dynamic features of a construction process. These features include feedback, time delays and nonlinear cause and effect relationships among project components. In general, people have a hard time dealing with nonlinear relationships in their mental models of the world. When three or four of these relationships are operating at the same time, the resulting complexity becomes very hard to unravel intuitively. Experienced program managers can describe dynamics and understand they are operating on the system. They cannot quantify the strength or impact of these features on their project. The purpose of this paper is to use System Dynamics modeling to examine the Navy Ship Acquisition and Construction process and to increase the knowledge and understanding concerning the management of large Navy shipbuilding projects. System Dynamics captures the many complex facets of ship construction simultaneously and examines their behavior over time. Using simulation, project managers in the Navy and in the private sector can make better, more quantitative decisions.","abstract_html":"Project management in the shipbuilding industry is a complex and misunderstood field. Ship programs are often delivered behind schedule and over budget. Many external factors can cause a relatively well-run program to experience problems. These include material shortages, labor problems or customer generated design changes. Even harder for a manager to understand are internally generated problems from sources like overtime use, hiring and firing policy, and cost estimating. Project managers do not understand or have the tools to measure many of the dynamic features of a construction process. These features include feedback, time delays and nonlinear cause and effect relationships among project components. In general, people have a hard time dealing with nonlinear relationships in their mental models of the world. When three or four of these relationships are operating at the same time, the resulting complexity becomes very hard to unravel intuitively. Experienced program managers can describe dynamics and understand they are operating on the system. They cannot quantify the strength or impact of these features on their project. The purpose of this paper is to use System Dynamics modeling to examine the Navy Ship Acquisition and Construction process and to increase the knowledge and understanding concerning the management of large Navy shipbuilding projects. System Dynamics captures the many complex facets of ship construction simultaneously and examines their behavior over time. Using simulation, project managers in the Navy and in the private sector can make better, more quantitative decisions.","abstract_has_math":false,"creators":["McCue, Timothy P."],"institution":"Massachusetts Institute of Technology","degree_name":"Naval Engineer and Master of Science in Ocean Systems Management","degree_level":"Masters","degree_discipline":"Ocean Systems Management","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1997,"date_issued":"1997-06","date_published":"1997-06","updated_at":"2026-11-19T06:44:14Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/8281","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/8281","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F8281","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["McCue, Timothy P."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:19:52Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:19:52Z"]},{"key":"dc:date.issued","label":"Date","values":["1997-06"]},{"key":"dc:publisher","label":"Institution","values":["Massachusetts Institute of Technology"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Ocean Systems Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Naval Engineer and Master of Science in Ocean Systems Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Massachusetts Institute of Technology"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/8281"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Project management in the shipbuilding industry is a complex and misunderstood field. Ship programs are often delivered behind schedule and over budget. Many external factors can cause a relatively well-run program to experience problems. These include material shortages, labor problems or customer generated design changes. Even harder for a manager to understand are internally generated problems from sources like overtime use, hiring and firing policy, and cost estimating. Project managers do not understand or have the tools to measure many of the dynamic features of a construction process. These features include feedback, time delays and nonlinear cause and effect relationships among project components. In general, people have a hard time dealing with nonlinear relationships in their mental models of the world. When three or four of these relationships are operating at the same time, the resulting complexity becomes very hard to unravel intuitively. Experienced program managers can describe dynamics and understand they are operating on the system. They cannot quantify the strength or impact of these features on their project. The purpose of this paper is to use System Dynamics modeling to examine the Navy Ship Acquisition and Construction process and to increase the knowledge and understanding concerning the management of large Navy shipbuilding projects. System Dynamics captures the many complex facets of ship construction simultaneously and examines their behavior over time. Using simulation, project managers in the Navy and in the private sector can make better, more quantitative decisions."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/thedynamicsofnav109458281"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["311 p."]},{"key":"dc:title","label":"Title","values":["The dynamics of naval shipbuilding : a systems approach"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["McCue, Timothy P."],"dc:date.accessioned":["2012-08-09T19:19:52Z"],"dc:date.available":["2012-08-09T19:19:52Z"],"dc:date.issued":["1997-06"],"dc:description.abstract":["Project management in the shipbuilding industry is a complex and misunderstood field. Ship programs are often delivered behind schedule and over budget. Many external factors can cause a relatively well-run program to experience problems. These include material shortages, labor problems or customer generated design changes. Even harder for a manager to understand are internally generated problems from sources like overtime use, hiring and firing policy, and cost estimating. Project managers do not understand or have the tools to measure many of the dynamic features of a construction process. These features include feedback, time delays and nonlinear cause and effect relationships among project components. In general, people have a hard time dealing with nonlinear relationships in their mental models of the world. When three or four of these relationships are operating at the same time, the resulting complexity becomes very hard to unravel intuitively. Experienced program managers can describe dynamics and understand they are operating on the system. They cannot quantify the strength or impact of these features on their project. The purpose of this paper is to use System Dynamics modeling to examine the Navy Ship Acquisition and Construction process and to increase the knowledge and understanding concerning the management of large Navy shipbuilding projects. System Dynamics captures the many complex facets of ship construction simultaneously and examines their behavior over time. Using simulation, project managers in the Navy and in the private sector can make better, more quantitative decisions."],"dc:description.uri":["http://archive.org/details/thedynamicsofnav109458281"],"dc:format.extent":["311 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/8281"],"dc:publisher":["Massachusetts Institute of Technology"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Distribution Statement A. Approved for public release: Distribution is unlimited."],"dc:title":["The dynamics of naval shipbuilding : a systems approach"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Ocean Systems Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Naval Engineer and Master of Science in Ocean Systems Management"],"thesis:institution_name":["Massachusetts Institute of Technology"]},"updated_at":"2026-11-19T06:44:14Z"}