{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/8295"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/8295","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"The effects of the Single Process Initiative on aerospace subcontractors","abstract":"The purpose of this study was to identify and discuss the difficulties aerospace subcontractors have faced since the implementation of the Single Process initiative (SPI). In addition, the thesis provided recommendations to address these difficulties and promote greater industry participation in the SPI. The research determined that aerospace subcontractors have experienced increased costs and/or administrative burdens due to prime contractors utilizing the block change process. The methodology used to identify the apparent inequities faced by the subcontractors was a review of current literature and 40 telephone interviews with representatives of aerospace prime contractors and subcontractors. The interview questions either complimented the information garnered from the literature or asked the respondents to provide personal opinions about the SPI. The questionnaires were compared to one another, analyzed and recommendations were generated. Specifically, the recommendations included; continue to promote the use of the SPI, open lines of communications between prime contractors and subcontractors through teaming, the Management Council should identify the best possible practices in each proposal, more realism needed with Rough Order of Magnitude estimates, and the Government should better categorize SPI proposals and ensure more timely recommendations from key stakeholders during the proposal approval process.","abstract_html":"The purpose of this study was to identify and discuss the difficulties aerospace subcontractors have faced since the implementation of the Single Process initiative (SPI). In addition, the thesis provided recommendations to address these difficulties and promote greater industry participation in the SPI. The research determined that aerospace subcontractors have experienced increased costs and/or administrative burdens due to prime contractors utilizing the block change process. The methodology used to identify the apparent inequities faced by the subcontractors was a review of current literature and 40 telephone interviews with representatives of aerospace prime contractors and subcontractors. The interview questions either complimented the information garnered from the literature or asked the respondents to provide personal opinions about the SPI. The questionnaires were compared to one another, analyzed and recommendations were generated. Specifically, the recommendations included; continue to promote the use of the SPI, open lines of communications between prime contractors and subcontractors through teaming, the Management Council should identify the best possible practices in each proposal, more realism needed with Rough Order of Magnitude estimates, and the Government should better categorize SPI proposals and ensure more timely recommendations from key stakeholders during the proposal approval process.","abstract_has_math":false,"creators":["Winicki, Anthony A."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Department of Systems Management","school":null,"contributors":[],"advisors":["Cuskey, Jeffrey R.","Stone, Mark W."],"committee_chairs":[],"committee_members":[],"year":1998,"date_issued":"1998-06-01","date_published":"1998-06-01","updated_at":"2026-11-21T22:49:31Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/8295","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/8295","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F8295","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Cuskey, Jeffrey R.","Stone, Mark W."]},{"key":"dc:contributor.department","label":"Department","values":["Department of Systems Management"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School"]},{"key":"dc:creator","label":"Author","values":["Winicki, Anthony A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June 1998"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:19:56Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:19:56Z"]},{"key":"dc:date.issued","label":"Date","values":["1998-06-01"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Single Project Initiative","Contracting","Acquisitions","Aerospace subcontractors"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/8295"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this study was to identify and discuss the difficulties aerospace subcontractors have faced since the implementation of the Single Process initiative (SPI). In addition, the thesis provided recommendations to address these difficulties and promote greater industry participation in the SPI. The research determined that aerospace subcontractors have experienced increased costs and/or administrative burdens due to prime contractors utilizing the block change process. The methodology used to identify the apparent inequities faced by the subcontractors was a review of current literature and 40 telephone interviews with representatives of aerospace prime contractors and subcontractors. The interview questions either complimented the information garnered from the literature or asked the respondents to provide personal opinions about the SPI. The questionnaires were compared to one another, analyzed and recommendations were generated. Specifically, the recommendations included; continue to promote the use of the SPI, open lines of communications between prime contractors and subcontractors through teaming, the Management Council should identify the best possible practices in each proposal, more realism needed with Rough Order of Magnitude estimates, and the Government should better categorize SPI proposals and ensure more timely recommendations from key stakeholders during the proposal approval process."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/theeffectsofsing109458295"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["x, 118 p."]},{"key":"dc:title","label":"Title","values":["The effects of the Single Process Initiative on aerospace subcontractors"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Captain, United States Marine Corps"]}]}],"canonical_facts":{"dc:contributor.advisor":["Cuskey, Jeffrey R.","Stone, Mark W."],"dc:contributor.department":["Department of Systems Management"],"dc:contributor.other":["Naval Postgraduate School"],"dc:creator":["Winicki, Anthony A."],"dc:date":["June 1998"],"dc:date.accessioned":["2012-08-09T19:19:56Z"],"dc:date.available":["2012-08-09T19:19:56Z"],"dc:date.issued":["1998-06-01"],"dc:description.abstract":["The purpose of this study was to identify and discuss the difficulties aerospace subcontractors have faced since the implementation of the Single Process initiative (SPI). In addition, the thesis provided recommendations to address these difficulties and promote greater industry participation in the SPI. The research determined that aerospace subcontractors have experienced increased costs and/or administrative burdens due to prime contractors utilizing the block change process. The methodology used to identify the apparent inequities faced by the subcontractors was a review of current literature and 40 telephone interviews with representatives of aerospace prime contractors and subcontractors. The interview questions either complimented the information garnered from the literature or asked the respondents to provide personal opinions about the SPI. The questionnaires were compared to one another, analyzed and recommendations were generated. Specifically, the recommendations included; continue to promote the use of the SPI, open lines of communications between prime contractors and subcontractors through teaming, the Management Council should identify the best possible practices in each proposal, more realism needed with Rough Order of Magnitude estimates, and the Government should better categorize SPI proposals and ensure more timely recommendations from key stakeholders during the proposal approval process."],"dc:description.uri":["http://archive.org/details/theeffectsofsing109458295"],"dc:format.extent":["x, 118 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/8295"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Single Project Initiative","Contracting","Acquisitions","Aerospace subcontractors"],"dc:title":["The effects of the Single Process Initiative on aerospace subcontractors"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Captain, United States Marine Corps"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:49:31Z"}