{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/8343"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/8343","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An evaluation of the time constrained and resource constrained scheduling features of commercially available project management software","abstract":"The major suppliers of commercially available project management software were identified. These suppliers were surveyed to ascertain the nature of the time constrained and resource constrained scheduling effectiveness provided by the software. The survey also identifies the major features of the software as well as the minimum and recommended computer hardware requirements for the software. The software suppliers were all provided with the same sample network for time constrained and resource constrained scheduling. The results of the scheduling calculations are analyzed to evaluate the effectiveness of the software's procedures. No specific recommendations or opinions are given concerning any of the individual software products or suppliers.","abstract_html":"The major suppliers of commercially available project management software were identified. These suppliers were surveyed to ascertain the nature of the time constrained and resource constrained scheduling effectiveness provided by the software. The survey also identifies the major features of the software as well as the minimum and recommended computer hardware requirements for the software. The software suppliers were all provided with the same sample network for time constrained and resource constrained scheduling. The results of the scheduling calculations are analyzed to evaluate the effectiveness of the software&#x27;s procedures. No specific recommendations or opinions are given concerning any of the individual software products or suppliers.","abstract_has_math":false,"creators":["Norwood, John Sheppard"],"institution":"University of Texas at Austin","degree_name":"Master in Science in Engineering","degree_level":"Masters","degree_discipline":"Engineering","degree_department":null,"school":null,"contributors":[],"advisors":["Popescu, Calin M."],"committee_chairs":[],"committee_members":[],"year":1996,"date_issued":"1996-05","date_published":"1996-05","updated_at":"2026-11-19T06:44:14Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn640478875"],"render_values":[{"text":"ocn640478875","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/8343","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/8343","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F8343","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F8343","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Popescu, Calin M."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Norwood, John Sheppard"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:20:15Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:20:15Z"]},{"key":"dc:date.issued","label":"Date","values":["1996-05"]},{"key":"dc:publisher","label":"Institution","values":["University of Texas at Austin"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master in Science in Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Texas at Austin"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["ocn640478875"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/8343"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The major suppliers of commercially available project management software were identified. These suppliers were surveyed to ascertain the nature of the time constrained and resource constrained scheduling effectiveness provided by the software. The survey also identifies the major features of the software as well as the minimum and recommended computer hardware requirements for the software. The software suppliers were all provided with the same sample network for time constrained and resource constrained scheduling. The results of the scheduling calculations are analyzed to evaluate the effectiveness of the software's procedures. No specific recommendations or opinions are given concerning any of the individual software products or suppliers."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/anevaluationofti109458343"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["79 p."]},{"key":"dc:title","label":"Title","values":["An evaluation of the time constrained and resource constrained scheduling features of commercially available project management software"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Popescu, Calin M."],"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Norwood, John Sheppard"],"dc:date.accessioned":["2012-08-09T19:20:15Z"],"dc:date.available":["2012-08-09T19:20:15Z"],"dc:date.issued":["1996-05"],"dc:description.abstract":["The major suppliers of commercially available project management software were identified. These suppliers were surveyed to ascertain the nature of the time constrained and resource constrained scheduling effectiveness provided by the software. The survey also identifies the major features of the software as well as the minimum and recommended computer hardware requirements for the software. The software suppliers were all provided with the same sample network for time constrained and resource constrained scheduling. The results of the scheduling calculations are analyzed to evaluate the effectiveness of the software's procedures. No specific recommendations or opinions are given concerning any of the individual software products or suppliers."],"dc:description.uri":["http://archive.org/details/anevaluationofti109458343"],"dc:format.extent":["79 p."],"dc:identifier.oclc":["ocn640478875"],"dc:identifier.uri":["https://hdl.handle.net/10945/8343"],"dc:publisher":["University of Texas at Austin"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["An evaluation of the time constrained and resource constrained scheduling features of commercially available project management software"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master in Science in Engineering"],"thesis:institution_name":["University of Texas at Austin"]},"updated_at":"2026-11-19T06:44:14Z"}