{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/8521"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/8521","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Incentive measures for Navy working capital fund civilian employees at Naval Air Warfare Center, Aircraft Division, Patuxent River, Maryland","abstract":"This thesis sought to identify an alternative incentive system and determine if it is feasible to implement it at the Naval Air Warfare Center, Aircraft Division, (NAWCAD) Patuxent River, Maryland. The goal for the incentive system would be to help stimulate an increase in productivity. This thesis also sought to determine the structural and accounting barriers to the implementation of such an incentive system. The thesis examined the current pay and incentive structure at the NAWCAD and examined three alternative incentive systems: individual, group, and organizational. Given that public employees may be motivated differently from private sector employees this thesis recommended conducting a survey of the NAWCAD employees to determine motivation factors and then implementing a group incentive system on a trial basis in test work centers","abstract_html":"This thesis sought to identify an alternative incentive system and determine if it is feasible to implement it at the Naval Air Warfare Center, Aircraft Division, (NAWCAD) Patuxent River, Maryland. The goal for the incentive system would be to help stimulate an increase in productivity. This thesis also sought to determine the structural and accounting barriers to the implementation of such an incentive system. The thesis examined the current pay and incentive structure at the NAWCAD and examined three alternative incentive systems: individual, group, and organizational. Given that public employees may be motivated differently from private sector employees this thesis recommended conducting a survey of the NAWCAD employees to determine motivation factors and then implementing a group incentive system on a trial basis in test work centers","abstract_has_math":false,"creators":["Ross, Clifton G."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":null,"school":null,"contributors":[],"advisors":["Euskle, Kenneth J.","Hleba, Theodore A."],"committee_chairs":[],"committee_members":[],"year":1998,"date_issued":"1998-12","date_published":"1998-12","updated_at":"2026-11-20T22:20:15Z","subjects":[],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/8521","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/8521","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F8521","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F8521","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Euskle, Kenneth J.","Hleba, Theodore A."]},{"key":"dc:creator","label":"Author","values":["Ross, Clifton G."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:21:21Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:21:21Z"]},{"key":"dc:date.issued","label":"Date","values":["1998-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Civilian Employees","Incentives","Productivity"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/8521"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis sought to identify an alternative incentive system and determine if it is feasible to implement it at the Naval Air Warfare Center, Aircraft Division, (NAWCAD) Patuxent River, Maryland. The goal for the incentive system would be to help stimulate an increase in productivity. This thesis also sought to determine the structural and accounting barriers to the implementation of such an incentive system. The thesis examined the current pay and incentive structure at the NAWCAD and examined three alternative incentive systems: individual, group, and organizational. Given that public employees may be motivated differently from private sector employees this thesis recommended conducting a survey of the NAWCAD employees to determine motivation factors and then implementing a group incentive system on a trial basis in test work centers"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/incentivemeasure109458521"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xi, 77 p.;28 cm."]},{"key":"dc:title","label":"Title","values":["Incentive measures for Navy working capital fund civilian employees at Naval Air Warfare Center, Aircraft Division, Patuxent River, Maryland"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, Civil Engineer Corps, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Euskle, Kenneth J.","Hleba, Theodore A."],"dc:creator":["Ross, Clifton G."],"dc:date.accessioned":["2012-08-09T19:21:21Z"],"dc:date.available":["2012-08-09T19:21:21Z"],"dc:date.issued":["1998-12"],"dc:description.abstract":["This thesis sought to identify an alternative incentive system and determine if it is feasible to implement it at the Naval Air Warfare Center, Aircraft Division, (NAWCAD) Patuxent River, Maryland. The goal for the incentive system would be to help stimulate an increase in productivity. This thesis also sought to determine the structural and accounting barriers to the implementation of such an incentive system. The thesis examined the current pay and incentive structure at the NAWCAD and examined three alternative incentive systems: individual, group, and organizational. Given that public employees may be motivated differently from private sector employees this thesis recommended conducting a survey of the NAWCAD employees to determine motivation factors and then implementing a group incentive system on a trial basis in test work centers"],"dc:description.uri":["http://archive.org/details/incentivemeasure109458521"],"dc:format.extent":["xi, 77 p.;28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/8521"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Civilian Employees","Incentives","Productivity"],"dc:title":["Incentive measures for Navy working capital fund civilian employees at Naval Air Warfare Center, Aircraft Division, Patuxent River, Maryland"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, Civil Engineer Corps, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-20T22:20:15Z"}