{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/8796"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/8796","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Overview of horizontal directional drilling for utility construction","abstract":"Horizontal directional drilling (HDD) is a versatile form of utility construction and has seen enormous growth in the last decade as it offers a clear alternative to conventional methods. Drilling is conducted in both the vertical and horizontal direction and can be steered within limits, dependent upon subsurface conditions. HDD can install utilities from 1\" to 48\" in diameter and up to 6000 feet in length. The major utilities (gas, electric, telecommunications and water/sewer) can be installed with this technology. The construction process (pilot hole, reaming and pullback) along with the major components (drill rig, drill pipe, slurry, slurry recycling, survey equipment, drill bits, reamers and pipeline materials) will be discussed. The advantages of cost reduction, and environmental, social and time benefits will be examined in the context of numerous case studies. The challenges of proper soils information, subsurface conditions, training and knowledge, drilling fluids and binding of the drill pipe and reamer/bit will be discussed. Through constant innovation, HDD should remain state of the art for some time, and should be a consideration for the construction of any new utility within the size parameters.","abstract_html":"Horizontal directional drilling (HDD) is a versatile form of utility construction and has seen enormous growth in the last decade as it offers a clear alternative to conventional methods. Drilling is conducted in both the vertical and horizontal direction and can be steered within limits, dependent upon subsurface conditions. HDD can install utilities from 1&quot; to 48&quot; in diameter and up to 6000 feet in length. The major utilities (gas, electric, telecommunications and water/sewer) can be installed with this technology. The construction process (pilot hole, reaming and pullback) along with the major components (drill rig, drill pipe, slurry, slurry recycling, survey equipment, drill bits, reamers and pipeline materials) will be discussed. The advantages of cost reduction, and environmental, social and time benefits will be examined in the context of numerous case studies. The challenges of proper soils information, subsurface conditions, training and knowledge, drilling fluids and binding of the drill pipe and reamer/bit will be discussed. Through constant innovation, HDD should remain state of the art for some time, and should be a consideration for the construction of any new utility within the size parameters.","abstract_has_math":false,"creators":["Barlas, Alexander W."],"institution":"University of Florida","degree_name":"Master of Engineering","degree_level":"Masters","degree_discipline":"Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1999,"date_issued":"1999","date_published":"1999","updated_at":"2026-11-19T06:44:33Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["o640936999"],"render_values":[{"text":"o640936999","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/8796","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/8796","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F8796","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Barlas, Alexander W."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:22:50Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:22:50Z"]},{"key":"dc:date.issued","label":"Date","values":["1999"]},{"key":"dc:publisher","label":"Institution","values":["University of Florida"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Florida"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["o640936999"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/8796"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Horizontal directional drilling (HDD) is a versatile form of utility construction and has seen enormous growth in the last decade as it offers a clear alternative to conventional methods. Drilling is conducted in both the vertical and horizontal direction and can be steered within limits, dependent upon subsurface conditions. HDD can install utilities from 1\" to 48\" in diameter and up to 6000 feet in length. The major utilities (gas, electric, telecommunications and water/sewer) can be installed with this technology. The construction process (pilot hole, reaming and pullback) along with the major components (drill rig, drill pipe, slurry, slurry recycling, survey equipment, drill bits, reamers and pipeline materials) will be discussed. The advantages of cost reduction, and environmental, social and time benefits will be examined in the context of numerous case studies. The challenges of proper soils information, subsurface conditions, training and knowledge, drilling fluids and binding of the drill pipe and reamer/bit will be discussed. Through constant innovation, HDD should remain state of the art for some time, and should be a consideration for the construction of any new utility within the size parameters."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/overviewofhorizo109458796"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["167 p."]},{"key":"dc:title","label":"Title","values":["Overview of horizontal directional drilling for utility construction"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Barlas, Alexander W."],"dc:date.accessioned":["2012-08-09T19:22:50Z"],"dc:date.available":["2012-08-09T19:22:50Z"],"dc:date.issued":["1999"],"dc:description.abstract":["Horizontal directional drilling (HDD) is a versatile form of utility construction and has seen enormous growth in the last decade as it offers a clear alternative to conventional methods. Drilling is conducted in both the vertical and horizontal direction and can be steered within limits, dependent upon subsurface conditions. HDD can install utilities from 1\" to 48\" in diameter and up to 6000 feet in length. The major utilities (gas, electric, telecommunications and water/sewer) can be installed with this technology. The construction process (pilot hole, reaming and pullback) along with the major components (drill rig, drill pipe, slurry, slurry recycling, survey equipment, drill bits, reamers and pipeline materials) will be discussed. The advantages of cost reduction, and environmental, social and time benefits will be examined in the context of numerous case studies. The challenges of proper soils information, subsurface conditions, training and knowledge, drilling fluids and binding of the drill pipe and reamer/bit will be discussed. Through constant innovation, HDD should remain state of the art for some time, and should be a consideration for the construction of any new utility within the size parameters."],"dc:description.uri":["http://archive.org/details/overviewofhorizo109458796"],"dc:format.extent":["167 p."],"dc:identifier.oclc":["o640936999"],"dc:identifier.uri":["https://hdl.handle.net/10945/8796"],"dc:publisher":["University of Florida"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["Overview of horizontal directional drilling for utility construction"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Engineering"],"thesis:institution_name":["University of Florida"]},"updated_at":"2026-11-19T06:44:33Z"}