{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/8815"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/8815","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Performance bonds under the Federal Acquisition Streamling Act (1994)","abstract":"With the passage of the Federal Acquisition Streamlining Act (FASA) of 1994, the U.S. Federal Government set in motion a process which is intended to reform the federal acquisition process with the aim of achieving greater efficiency and value. Although numerous initiatives have been adopted in pursuit of this goal, one area which has been neglected is performance bonds. In keeping with the Total Quality Management (TQM) objective of reaping benefits from the 'low hanging fruit' first, this paper examines the potential savings available as a result of relatively minor changes to the way requirements for performance bonds on Navy construction contracts are determined. The result is savings which appear to be 'hanging low' indeed. By shifting to a risk-based system of requiring performance bonds only on those contract with an appreciable default risk, savings of 0.5% to 1.0% of the gross cost of construction appear to be available with very little loss potential.","abstract_html":"With the passage of the Federal Acquisition Streamlining Act (FASA) of 1994, the U.S. Federal Government set in motion a process which is intended to reform the federal acquisition process with the aim of achieving greater efficiency and value. Although numerous initiatives have been adopted in pursuit of this goal, one area which has been neglected is performance bonds. In keeping with the Total Quality Management (TQM) objective of reaping benefits from the &#x27;low hanging fruit&#x27; first, this paper examines the potential savings available as a result of relatively minor changes to the way requirements for performance bonds on Navy construction contracts are determined. The result is savings which appear to be &#x27;hanging low&#x27; indeed. By shifting to a risk-based system of requiring performance bonds only on those contract with an appreciable default risk, savings of 0.5% to 1.0% of the gross cost of construction appear to be available with very little loss potential.","abstract_has_math":false,"creators":["Tave, Gary A."],"institution":"University of Maryland, College Park","degree_name":"Master of Science in Civil Engineering","degree_level":"Masters","degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1997,"date_issued":"1997","date_published":"1997","updated_at":"2026-11-19T06:44:33Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/8815","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/8815","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F8815","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F8815","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Tave, Gary A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:22:55Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:22:55Z"]},{"key":"dc:date.issued","label":"Date","values":["1997"]},{"key":"dc:publisher","label":"Institution","values":["University of Maryland, College Park"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Civil Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Maryland, College Park"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/8815"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["With the passage of the Federal Acquisition Streamlining Act (FASA) of 1994, the U.S. Federal Government set in motion a process which is intended to reform the federal acquisition process with the aim of achieving greater efficiency and value. Although numerous initiatives have been adopted in pursuit of this goal, one area which has been neglected is performance bonds. In keeping with the Total Quality Management (TQM) objective of reaping benefits from the 'low hanging fruit' first, this paper examines the potential savings available as a result of relatively minor changes to the way requirements for performance bonds on Navy construction contracts are determined. The result is savings which appear to be 'hanging low' indeed. By shifting to a risk-based system of requiring performance bonds only on those contract with an appreciable default risk, savings of 0.5% to 1.0% of the gross cost of construction appear to be available with very little loss potential."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/performancebonds109458815"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["27 p."]},{"key":"dc:title","label":"Title","values":["Performance bonds under the Federal Acquisition Streamling Act (1994)"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Tave, Gary A."],"dc:date.accessioned":["2012-08-09T19:22:55Z"],"dc:date.available":["2012-08-09T19:22:55Z"],"dc:date.issued":["1997"],"dc:description.abstract":["With the passage of the Federal Acquisition Streamlining Act (FASA) of 1994, the U.S. Federal Government set in motion a process which is intended to reform the federal acquisition process with the aim of achieving greater efficiency and value. Although numerous initiatives have been adopted in pursuit of this goal, one area which has been neglected is performance bonds. In keeping with the Total Quality Management (TQM) objective of reaping benefits from the 'low hanging fruit' first, this paper examines the potential savings available as a result of relatively minor changes to the way requirements for performance bonds on Navy construction contracts are determined. The result is savings which appear to be 'hanging low' indeed. By shifting to a risk-based system of requiring performance bonds only on those contract with an appreciable default risk, savings of 0.5% to 1.0% of the gross cost of construction appear to be available with very little loss potential."],"dc:description.uri":["http://archive.org/details/performancebonds109458815"],"dc:format.extent":["27 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/8815"],"dc:publisher":["University of Maryland, College Park"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["Performance bonds under the Federal Acquisition Streamling Act (1994)"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Civil Engineering"],"thesis:institution_name":["University of Maryland, College Park"]},"updated_at":"2026-11-19T06:44:33Z"}