{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/8913"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/8913","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Repair cycle time reduction at Naval Aviation Depots via reduced Logistics Delay Time","abstract":"This thesis is a study of an alternative acquisition program for piece parts that support readiness degrader aviation components. Components with outstanding piece parts with an acquisition lead times of greater than 45 days migrate to an awaiting parts status termed a supply condition code G. The U.S. Navy currently has more than 500 million dollars worth of components in C condition with more than 76 million dollars worth of piece parts outstanding. The current average time components at the Naval Aviation Depot North Island (NADEP-M), California spends in C condition is 190 days. The major focus of the thesis is the development of an alternative acquisition system to investigate the effect of reduced acquisition lead times on repair cycle times and component inventory levels. The alternative acquisition system would reduce the acquisition lead time on all piece parts that are directly attributable to more than 20% of the applicable C condition components from an average of 199 days to only 60 days. This proposed change would reduce Logistics Delay Time (LDT) for the steady state components an average 32.4%, the average Repair Turnaround Time (RTAT) would be reduced an average 14.5% and the inventory levels would be reduced by 53 units or 4.42 million dollars. The comparison of the costs of the priority purchase system to the benefits indicates that for every one dollar invested in priority purchasing would result in 28 dollars in savings through reduced inventory levels.","abstract_html":"This thesis is a study of an alternative acquisition program for piece parts that support readiness degrader aviation components. Components with outstanding piece parts with an acquisition lead times of greater than 45 days migrate to an awaiting parts status termed a supply condition code G. The U.S. Navy currently has more than 500 million dollars worth of components in C condition with more than 76 million dollars worth of piece parts outstanding. The current average time components at the Naval Aviation Depot North Island (NADEP-M), California spends in C condition is 190 days. The major focus of the thesis is the development of an alternative acquisition system to investigate the effect of reduced acquisition lead times on repair cycle times and component inventory levels. The alternative acquisition system would reduce the acquisition lead time on all piece parts that are directly attributable to more than 20% of the applicable C condition components from an average of 199 days to only 60 days. This proposed change would reduce Logistics Delay Time (LDT) for the steady state components an average 32.4%, the average Repair Turnaround Time (RTAT) would be reduced an average 14.5% and the inventory levels would be reduced by 53 units or 4.42 million dollars. The comparison of the costs of the priority purchase system to the benefits indicates that for every one dollar invested in priority purchasing would result in 28 dollars in savings through reduced inventory levels.","abstract_has_math":false,"creators":["Cruz, David F."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":"Department of Systems Management","school":null,"contributors":[],"advisors":["Kang, Keebom","Eaton, Donald"],"committee_chairs":[],"committee_members":[],"year":1997,"date_issued":"1997-12","date_published":"1997-12","updated_at":"2026-11-20T22:12:02Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/8913","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/8913","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F8913","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Kang, Keebom","Eaton, Donald"]},{"key":"dc:contributor.department","label":"Department","values":["Department of Systems Management"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School"]},{"key":"dc:creator","label":"Author","values":["Cruz, David F."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1997"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:23:25Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:23:25Z"]},{"key":"dc:date.issued","label":"Date","values":["1997-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/8913"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis is a study of an alternative acquisition program for piece parts that support readiness degrader aviation components. Components with outstanding piece parts with an acquisition lead times of greater than 45 days migrate to an awaiting parts status termed a supply condition code G. The U.S. Navy currently has more than 500 million dollars worth of components in C condition with more than 76 million dollars worth of piece parts outstanding. The current average time components at the Naval Aviation Depot North Island (NADEP-M), California spends in C condition is 190 days. The major focus of the thesis is the development of an alternative acquisition system to investigate the effect of reduced acquisition lead times on repair cycle times and component inventory levels. The alternative acquisition system would reduce the acquisition lead time on all piece parts that are directly attributable to more than 20% of the applicable C condition components from an average of 199 days to only 60 days. This proposed change would reduce Logistics Delay Time (LDT) for the steady state components an average 32.4%, the average Repair Turnaround Time (RTAT) would be reduced an average 14.5% and the inventory levels would be reduced by 53 units or 4.42 million dollars. The comparison of the costs of the priority purchase system to the benefits indicates that for every one dollar invested in priority purchasing would result in 28 dollars in savings through reduced inventory levels."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/repaircycletimer109458913"]},{"key":"dc:title","label":"Title","values":["Repair cycle time reduction at Naval Aviation Depots via reduced Logistics Delay Time"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Kang, Keebom","Eaton, Donald"],"dc:contributor.department":["Department of Systems Management"],"dc:contributor.other":["Naval Postgraduate School"],"dc:creator":["Cruz, David F."],"dc:date":["December 1997"],"dc:date.accessioned":["2012-08-09T19:23:25Z"],"dc:date.available":["2012-08-09T19:23:25Z"],"dc:date.issued":["1997-12"],"dc:description.abstract":["This thesis is a study of an alternative acquisition program for piece parts that support readiness degrader aviation components. Components with outstanding piece parts with an acquisition lead times of greater than 45 days migrate to an awaiting parts status termed a supply condition code G. The U.S. Navy currently has more than 500 million dollars worth of components in C condition with more than 76 million dollars worth of piece parts outstanding. The current average time components at the Naval Aviation Depot North Island (NADEP-M), California spends in C condition is 190 days. The major focus of the thesis is the development of an alternative acquisition system to investigate the effect of reduced acquisition lead times on repair cycle times and component inventory levels. The alternative acquisition system would reduce the acquisition lead time on all piece parts that are directly attributable to more than 20% of the applicable C condition components from an average of 199 days to only 60 days. This proposed change would reduce Logistics Delay Time (LDT) for the steady state components an average 32.4%, the average Repair Turnaround Time (RTAT) would be reduced an average 14.5% and the inventory levels would be reduced by 53 units or 4.42 million dollars. The comparison of the costs of the priority purchase system to the benefits indicates that for every one dollar invested in priority purchasing would result in 28 dollars in savings through reduced inventory levels."],"dc:description.uri":["http://archive.org/details/repaircycletimer109458913"],"dc:identifier.uri":["https://hdl.handle.net/10945/8913"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:title":["Repair cycle time reduction at Naval Aviation Depots via reduced Logistics Delay Time"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-20T22:12:02Z"}