{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/8924"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/8924","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Risk in construction subcontracting","abstract":"Risk is inherent in every aspect of the construction industry. This risk is allocated by the contract documents which establish the relationships between the parties in a construction contract. Often, when risk is not appropriately proportioned in a contractual agreement, contractors and subcontractors add significant premiums, or risk allowances, to their bids to reduce the potential negative consequences if the risk event occurs. This paper investigates the risks in construction contract agreements which general contractors and subcontractors indicated most affects their bids as suggested by the frequency with which a contingency for risk is included. It also investigates the contractor's success in gaining a time extension or claim for additional cost for the same conditions. Survey results indicate that both general contractors and subcontractors generally feel that contract provisions are fair; however, they often include an allowance for risk in their bids depending on their level of perceived risk.","abstract_html":"Risk is inherent in every aspect of the construction industry. This risk is allocated by the contract documents which establish the relationships between the parties in a construction contract. Often, when risk is not appropriately proportioned in a contractual agreement, contractors and subcontractors add significant premiums, or risk allowances, to their bids to reduce the potential negative consequences if the risk event occurs. This paper investigates the risks in construction contract agreements which general contractors and subcontractors indicated most affects their bids as suggested by the frequency with which a contingency for risk is included. It also investigates the contractor&#x27;s success in gaining a time extension or claim for additional cost for the same conditions. Survey results indicate that both general contractors and subcontractors generally feel that contract provisions are fair; however, they often include an allowance for risk in their bids depending on their level of perceived risk.","abstract_has_math":false,"creators":["Roe, Deborah E"],"institution":"Texas A&M University","degree_name":"Master of Science Construction Management","degree_level":"Masters","degree_discipline":"Construction Management","degree_department":null,"school":null,"contributors":[],"advisors":["Holland, Nancy L.","Craig, James W.","Rogers, George O."],"committee_chairs":[],"committee_members":[],"year":1997,"date_issued":"1997-08","date_published":"1997-08","updated_at":"2026-11-19T06:44:33Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/8924","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/8924","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F8924","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Holland, Nancy L.","Craig, James W.","Rogers, George O."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Roe, Deborah E"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:23:28Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:23:28Z"]},{"key":"dc:date.issued","label":"Date","values":["1997-08"]},{"key":"dc:publisher","label":"Institution","values":["Texas A&M University"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Construction Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science Construction Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Texas A&M University"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/8924"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Risk is inherent in every aspect of the construction industry. This risk is allocated by the contract documents which establish the relationships between the parties in a construction contract. Often, when risk is not appropriately proportioned in a contractual agreement, contractors and subcontractors add significant premiums, or risk allowances, to their bids to reduce the potential negative consequences if the risk event occurs. This paper investigates the risks in construction contract agreements which general contractors and subcontractors indicated most affects their bids as suggested by the frequency with which a contingency for risk is included. It also investigates the contractor's success in gaining a time extension or claim for additional cost for the same conditions. Survey results indicate that both general contractors and subcontractors generally feel that contract provisions are fair; however, they often include an allowance for risk in their bids depending on their level of perceived risk."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/riskinconstructi109458924"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["40 p."]},{"key":"dc:title","label":"Title","values":["Risk in construction subcontracting"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Holland, Nancy L.","Craig, James W.","Rogers, George O."],"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Roe, Deborah E"],"dc:date.accessioned":["2012-08-09T19:23:28Z"],"dc:date.available":["2012-08-09T19:23:28Z"],"dc:date.issued":["1997-08"],"dc:description.abstract":["Risk is inherent in every aspect of the construction industry. This risk is allocated by the contract documents which establish the relationships between the parties in a construction contract. Often, when risk is not appropriately proportioned in a contractual agreement, contractors and subcontractors add significant premiums, or risk allowances, to their bids to reduce the potential negative consequences if the risk event occurs. This paper investigates the risks in construction contract agreements which general contractors and subcontractors indicated most affects their bids as suggested by the frequency with which a contingency for risk is included. It also investigates the contractor's success in gaining a time extension or claim for additional cost for the same conditions. Survey results indicate that both general contractors and subcontractors generally feel that contract provisions are fair; however, they often include an allowance for risk in their bids depending on their level of perceived risk."],"dc:description.uri":["http://archive.org/details/riskinconstructi109458924"],"dc:format.extent":["40 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/8924"],"dc:publisher":["Texas A&M University"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["Risk in construction subcontracting"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Construction Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science Construction Management"],"thesis:institution_name":["Texas A&M University"]},"updated_at":"2026-11-19T06:44:33Z"}