{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/9007"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/9007","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Static scheduling of conditional branches in parallel programs","abstract":"The problem of scheduling parallel program tasks on multiprocessor systems is known to be NP-complete in its general form. When non-determinism is added to the scheduling problem through loops and conditional branching, an optimal solution is even harder to obtain. The intractability of obtaining an optimal solution for the general scheduling problem has led to the introduction of a large number of scheduling heuristics, These heuristics consider many real world factors, such as communication overhead, target machine topology, and the tradeoff between exploiting the parallelism in a parallel program and the resulting scheduling overhead. We present the probabilistic merge heuristic--in which a unified schedule of all possible execution instances is generated by successively scheduling tasks in order of their execution probabilities. When a conditional task is scheduled, we first attempt to merge the task with the time slot of a previously scheduled task which is a member of a different execution instance. We have found that the merge scheduler produces schedules which are 10% faster than previous techniques. More importantly, however, we show that the probabilistic merge heuristic is significantly more scalable -- being able to schedule branch and precedence graphs which exceed 50 modes.","abstract_html":"The problem of scheduling parallel program tasks on multiprocessor systems is known to be NP-complete in its general form. When non-determinism is added to the scheduling problem through loops and conditional branching, an optimal solution is even harder to obtain. The intractability of obtaining an optimal solution for the general scheduling problem has led to the introduction of a large number of scheduling heuristics, These heuristics consider many real world factors, such as communication overhead, target machine topology, and the tradeoff between exploiting the parallelism in a parallel program and the resulting scheduling overhead. We present the probabilistic merge heuristic--in which a unified schedule of all possible execution instances is generated by successively scheduling tasks in order of their execution probabilities. When a conditional task is scheduled, we first attempt to merge the task with the time slot of a previously scheduled task which is a member of a different execution instance. We have found that the merge scheduler produces schedules which are 10% faster than previous techniques. More importantly, however, we show that the probabilistic merge heuristic is significantly more scalable -- being able to schedule branch and precedence graphs which exceed 50 modes.","abstract_has_math":false,"creators":["George, Robert Tyler"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Computer Science","degree_level":"Masters","degree_discipline":"Computer Science","degree_department":"Department of Computer Science","school":null,"contributors":[],"advisors":["Lewis, Theodore"],"committee_chairs":[],"committee_members":["Pratt, Dave"],"year":1996,"date_issued":"1996-12","date_published":"1996-12","updated_at":"2026-11-20T22:01:37Z","subjects":["Parallel processing"],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/9007","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/9007","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F9007","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Lewis, Theodore"]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Pratt, Dave"]},{"key":"dc:contributor.department","label":"Department","values":["Department of Computer Science"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School"]},{"key":"dc:creator","label":"Author","values":["George, Robert Tyler"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["December 1996"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:23:53Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:23:53Z"]},{"key":"dc:date.issued","label":"Date","values":["1996-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Computer Science"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Computer Science"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Parallel processing","Scheduling"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Parallel processing"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/9007"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The problem of scheduling parallel program tasks on multiprocessor systems is known to be NP-complete in its general form. When non-determinism is added to the scheduling problem through loops and conditional branching, an optimal solution is even harder to obtain. The intractability of obtaining an optimal solution for the general scheduling problem has led to the introduction of a large number of scheduling heuristics, These heuristics consider many real world factors, such as communication overhead, target machine topology, and the tradeoff between exploiting the parallelism in a parallel program and the resulting scheduling overhead. We present the probabilistic merge heuristic--in which a unified schedule of all possible execution instances is generated by successively scheduling tasks in order of their execution probabilities. When a conditional task is scheduled, we first attempt to merge the task with the time slot of a previously scheduled task which is a member of a different execution instance. We have found that the merge scheduler produces schedules which are 10% faster than previous techniques. More importantly, however, we show that the probabilistic merge heuristic is significantly more scalable -- being able to schedule branch and precedence graphs which exceed 50 modes."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/staticscheduling109459007"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["viii, 55 p."]},{"key":"dc:title","label":"Title","values":["Static scheduling of conditional branches in parallel programs"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Army Research Laboratory"]}]}],"canonical_facts":{"dc:contributor.advisor":["Lewis, Theodore"],"dc:contributor.committeemember":["Pratt, Dave"],"dc:contributor.department":["Department of Computer Science"],"dc:contributor.other":["Naval Postgraduate School"],"dc:creator":["George, Robert Tyler"],"dc:date":["December 1996"],"dc:date.accessioned":["2012-08-09T19:23:53Z"],"dc:date.available":["2012-08-09T19:23:53Z"],"dc:date.issued":["1996-12"],"dc:description.abstract":["The problem of scheduling parallel program tasks on multiprocessor systems is known to be NP-complete in its general form. When non-determinism is added to the scheduling problem through loops and conditional branching, an optimal solution is even harder to obtain. The intractability of obtaining an optimal solution for the general scheduling problem has led to the introduction of a large number of scheduling heuristics, These heuristics consider many real world factors, such as communication overhead, target machine topology, and the tradeoff between exploiting the parallelism in a parallel program and the resulting scheduling overhead. We present the probabilistic merge heuristic--in which a unified schedule of all possible execution instances is generated by successively scheduling tasks in order of their execution probabilities. When a conditional task is scheduled, we first attempt to merge the task with the time slot of a previously scheduled task which is a member of a different execution instance. We have found that the merge scheduler produces schedules which are 10% faster than previous techniques. More importantly, however, we show that the probabilistic merge heuristic is significantly more scalable -- being able to schedule branch and precedence graphs which exceed 50 modes."],"dc:description.uri":["http://archive.org/details/staticscheduling109459007"],"dc:format.extent":["viii, 55 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/9007"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Parallel processing","Scheduling"],"dc:subject.lcsh":["Parallel processing"],"dc:title":["Static scheduling of conditional branches in parallel programs"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Army Research Laboratory"],"thesis:degree_discipline":["Computer Science"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Computer Science"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-20T22:01:37Z"}