{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/9040"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/9040","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Suitability of MRP II to material planning for component repair at Naval Aviation Depot, North Island.","abstract":"Manufacturing Resource Planning (MRP II) is being implemented at Naval Aviation Depot, North Island (NADEP NI) to combat chronic material deficiencies. MRP II is a planning tool designed for scheduling manufacturing activities with known demand. NADEP NI is a job shop component repair facility with component forecast error ranging up to 800 percent, making the suitability of MRP II questionable. This research studies material planning at NADEP NI to identify forecast error, probability of part replacement error, and material lead-time variability in order to make recommendations for success in implementing MRP II. Fifteen percent of requisitions for work-in-process components are between one and two years old. If lead-times are reduced to a maximum of one year, the planning horizon can be reduced. Work-in-process inventories can also be reduced by 2.3 million dollars based on 26 components sampled from the top revenue generators. Currently material is ordered five weeks prior to the repair quarter. Ordering material when the forecast is generated can reduce work-in-process inventories by 6.2 million dollars for the sample components","abstract_html":"Manufacturing Resource Planning (MRP II) is being implemented at Naval Aviation Depot, North Island (NADEP NI) to combat chronic material deficiencies. MRP II is a planning tool designed for scheduling manufacturing activities with known demand. NADEP NI is a job shop component repair facility with component forecast error ranging up to 800 percent, making the suitability of MRP II questionable. This research studies material planning at NADEP NI to identify forecast error, probability of part replacement error, and material lead-time variability in order to make recommendations for success in implementing MRP II. Fifteen percent of requisitions for work-in-process components are between one and two years old. If lead-times are reduced to a maximum of one year, the planning horizon can be reduced. Work-in-process inventories can also be reduced by 2.3 million dollars based on 26 components sampled from the top revenue generators. Currently material is ordered five weeks prior to the repair quarter. Ordering material when the forecast is generated can reduce work-in-process inventories by 6.2 million dollars for the sample components","abstract_has_math":false,"creators":["O'Brien, Timothy J."],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":null,"school":null,"contributors":[],"advisors":["Fields, Paul J.","Kang, Keebom"],"committee_chairs":[],"committee_members":[],"year":1998,"date_issued":"1998-06","date_published":"1998-06","updated_at":"2026-11-21T23:36:49Z","subjects":[],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/9040","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/9040","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F9040","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Fields, Paul J.","Kang, Keebom"]},{"key":"dc:creator","label":"Author","values":["O'Brien, Timothy J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:24:03Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:24:03Z"]},{"key":"dc:date.issued","label":"Date","values":["1998-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["MRP II","Component Repair","Forecasting"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/9040"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Manufacturing Resource Planning (MRP II) is being implemented at Naval Aviation Depot, North Island (NADEP NI) to combat chronic material deficiencies. MRP II is a planning tool designed for scheduling manufacturing activities with known demand. NADEP NI is a job shop component repair facility with component forecast error ranging up to 800 percent, making the suitability of MRP II questionable. This research studies material planning at NADEP NI to identify forecast error, probability of part replacement error, and material lead-time variability in order to make recommendations for success in implementing MRP II. Fifteen percent of requisitions for work-in-process components are between one and two years old. If lead-times are reduced to a maximum of one year, the planning horizon can be reduced. Work-in-process inventories can also be reduced by 2.3 million dollars based on 26 components sampled from the top revenue generators. Currently material is ordered five weeks prior to the repair quarter. Ordering material when the forecast is generated can reduce work-in-process inventories by 6.2 million dollars for the sample components"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/suitabilityofmrp109459040"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["x, 115 p.;28 cm."]},{"key":"dc:title","label":"Title","values":["Suitability of MRP II to material planning for component repair at Naval Aviation Depot, North Island."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Fields, Paul J.","Kang, Keebom"],"dc:creator":["O'Brien, Timothy J."],"dc:date.accessioned":["2012-08-09T19:24:03Z"],"dc:date.available":["2012-08-09T19:24:03Z"],"dc:date.issued":["1998-06"],"dc:description.abstract":["Manufacturing Resource Planning (MRP II) is being implemented at Naval Aviation Depot, North Island (NADEP NI) to combat chronic material deficiencies. MRP II is a planning tool designed for scheduling manufacturing activities with known demand. NADEP NI is a job shop component repair facility with component forecast error ranging up to 800 percent, making the suitability of MRP II questionable. This research studies material planning at NADEP NI to identify forecast error, probability of part replacement error, and material lead-time variability in order to make recommendations for success in implementing MRP II. Fifteen percent of requisitions for work-in-process components are between one and two years old. If lead-times are reduced to a maximum of one year, the planning horizon can be reduced. Work-in-process inventories can also be reduced by 2.3 million dollars based on 26 components sampled from the top revenue generators. Currently material is ordered five weeks prior to the repair quarter. Ordering material when the forecast is generated can reduce work-in-process inventories by 6.2 million dollars for the sample components"],"dc:description.uri":["http://archive.org/details/suitabilityofmrp109459040"],"dc:format.extent":["x, 115 p.;28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/9040"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["MRP II","Component Repair","Forecasting"],"dc:title":["Suitability of MRP II to material planning for component repair at Naval Aviation Depot, North Island."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T23:36:49Z"}