{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/911"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/911","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An analysis of the prediction accuracy of the U.S. Navy repair turn-around time forecast model","abstract":"This thesis examines the forecast accuracy of repair times for a subset of repairable U.S Navy inventory items. Forecasts are currently calculated using the Uniform Inventory Control Program (UICP) on a quarterly basis. The UICP model use the time of repairs completed in the current quarter to update a \"file\" value in order to forecast the repair times for the following quarter. Forecasts are calculated separately for repairable items grouped into families. This thesis demonstrates that aggregation repairs by their completion dates, as currently done by the UICP model, causes forecast to be affected by the nature of the repair arrival process. The more that this process differs from a Poisson process, the more that the forecast values are affected. Using bootstrap simulations, the effect of the repair process on the forecasting is quantified. This thesis also explores alternatives to the UICP model for forecasting repair times. In particular, an approach that utilizes repairs that have not been completed by the end of the current quarter is developed.","abstract_html":"This thesis examines the forecast accuracy of repair times for a subset of repairable U.S Navy inventory items. Forecasts are currently calculated using the Uniform Inventory Control Program (UICP) on a quarterly basis. The UICP model use the time of repairs completed in the current quarter to update a &quot;file&quot; value in order to forecast the repair times for the following quarter. Forecasts are calculated separately for repairable items grouped into families. This thesis demonstrates that aggregation repairs by their completion dates, as currently done by the UICP model, causes forecast to be affected by the nature of the repair arrival process. The more that this process differs from a Poisson process, the more that the forecast values are affected. Using bootstrap simulations, the effect of the repair process on the forecasting is quantified. This thesis also explores alternatives to the UICP model for forecasting repair times. In particular, an approach that utilizes repairs that have not been completed by the end of the current quarter is developed.","abstract_has_math":false,"creators":["Santos, William O."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"M.S. in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research","school":null,"contributors":[],"advisors":["Koyak, Robert A."],"committee_chairs":[],"committee_members":["Buttrey, Samuel E."],"year":2003,"date_issued":"2003-06","date_published":"2003-06","updated_at":"2026-11-19T06:44:58Z","subjects":["Military supplies","Maintenance and repair"],"languages":[],"rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/911","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/911","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F911","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Koyak, Robert A."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Buttrey, Samuel E."]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research"]},{"key":"dc:creator","label":"Author","values":["Santos, William O."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:29:56Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:29:56Z"]},{"key":"dc:date.issued","label":"Date","values":["2003-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Military supplies","Maintenance and repair"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/911"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis examines the forecast accuracy of repair times for a subset of repairable U.S Navy inventory items. Forecasts are currently calculated using the Uniform Inventory Control Program (UICP) on a quarterly basis. The UICP model use the time of repairs completed in the current quarter to update a \"file\" value in order to forecast the repair times for the following quarter. Forecasts are calculated separately for repairable items grouped into families. This thesis demonstrates that aggregation repairs by their completion dates, as currently done by the UICP model, causes forecast to be affected by the nature of the repair arrival process. The more that this process differs from a Poisson process, the more that the forecast values are affected. Using bootstrap simulations, the effect of the repair process on the forecasting is quantified. This thesis also explores alternatives to the UICP model for forecasting repair times. In particular, an approach that utilizes repairs that have not been completed by the end of the current quarter is developed."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/annalysisofpredi10945911"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xx, 57 p. : ill. (some col.) ;"]},{"key":"dc:title","label":"Title","values":["An analysis of the prediction accuracy of the U.S. Navy repair turn-around time forecast model"]},{"key":"dc:title.alternative","label":"Alternative Title","values":["Analysis of the prediction accuracy of the United States Navy repair turn-around time forecast model"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Captain, Brazilian Army"]},{"key":"local:etd.verified","label":"Local Etd Verified","values":["no"]}]}],"canonical_facts":{"dc:contributor.advisor":["Koyak, Robert A."],"dc:contributor.committeemember":["Buttrey, Samuel E."],"dc:contributor.department":["Operations Research"],"dc:creator":["Santos, William O."],"dc:date.accessioned":["2012-03-14T17:29:56Z"],"dc:date.available":["2012-03-14T17:29:56Z"],"dc:date.issued":["2003-06"],"dc:description.abstract":["This thesis examines the forecast accuracy of repair times for a subset of repairable U.S Navy inventory items. Forecasts are currently calculated using the Uniform Inventory Control Program (UICP) on a quarterly basis. The UICP model use the time of repairs completed in the current quarter to update a \"file\" value in order to forecast the repair times for the following quarter. Forecasts are calculated separately for repairable items grouped into families. This thesis demonstrates that aggregation repairs by their completion dates, as currently done by the UICP model, causes forecast to be affected by the nature of the repair arrival process. The more that this process differs from a Poisson process, the more that the forecast values are affected. Using bootstrap simulations, the effect of the repair process on the forecasting is quantified. This thesis also explores alternatives to the UICP model for forecasting repair times. In particular, an approach that utilizes repairs that have not been completed by the end of the current quarter is developed."],"dc:description.uri":["http://archive.org/details/annalysisofpredi10945911"],"dc:format.extent":["xx, 57 p. : ill. (some col.) ;"],"dc:identifier.uri":["https://hdl.handle.net/10945/911"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"dc:subject.lcsh":["Military supplies","Maintenance and repair"],"dc:title":["An analysis of the prediction accuracy of the U.S. Navy repair turn-around time forecast model"],"dc:title.alternative":["Analysis of the prediction accuracy of the United States Navy repair turn-around time forecast model"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Captain, Brazilian Army"],"local:etd.verified":["no"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:44:58Z"}