{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/9129"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/9129","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Utah Department of Transportation I-15 case study (Design-build contracting strategy)","abstract":"Because there is great potential for additional public works agencies using design build (best value) strategies, a need exists to document the salient features of the I-15 project. By studying this enormous project, the successes and lessons learned may be applied to the next negotiated project. In addition, if the contract continues on its successful path additional progressive legislation may be petitioned from state agencies seeking to increase the construction value for tax dollars expended. Towards this end, this report documents the pre-award and construction of Interstate I-15 reconstruction. More specifically, this case study captures the background information used to support the design build contracting strategy decision, challenges, innovations, significant construction methods and factors contributing to the project success","abstract_html":"Because there is great potential for additional public works agencies using design build (best value) strategies, a need exists to document the salient features of the I-15 project. By studying this enormous project, the successes and lessons learned may be applied to the next negotiated project. In addition, if the contract continues on its successful path additional progressive legislation may be petitioned from state agencies seeking to increase the construction value for tax dollars expended. Towards this end, this report documents the pre-award and construction of Interstate I-15 reconstruction. More specifically, this case study captures the background information used to support the design build contracting strategy decision, challenges, innovations, significant construction methods and factors contributing to the project success","abstract_has_math":false,"creators":["Kimball, Donna"],"institution":"Texas A&M University","degree_name":"Masters of Engineering","degree_level":"Masters","degree_discipline":"Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1999,"date_issued":"1999-06-01","date_published":"1999-06-01","updated_at":"2026-11-19T06:44:58Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["o640937135"],"render_values":[{"text":"o640937135","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/9129","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/9129","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F9129","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["CIVINS (Civilian Institutions)"]},{"key":"dc:creator","label":"Author","values":["Kimball, Donna"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:24:33Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:24:33Z"]},{"key":"dc:date.issued","label":"Date","values":["1999-06-01"]},{"key":"dc:publisher","label":"Institution","values":["Texas A&M University"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["CIVINS (Civilian Institutions) Theses and Dissertations"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Masters of Engineering"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Texas A and M"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.oclc","label":"OCLC","values":["o640937135"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/9129"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["CIVINS (Civilian Institutions) Thesis document"]},{"key":"dc:description.abstract","label":"Abstract","values":["Because there is great potential for additional public works agencies using design build (best value) strategies, a need exists to document the salient features of the I-15 project. By studying this enormous project, the successes and lessons learned may be applied to the next negotiated project. In addition, if the contract continues on its successful path additional progressive legislation may be petitioned from state agencies seeking to increase the construction value for tax dollars expended. Towards this end, this report documents the pre-award and construction of Interstate I-15 reconstruction. More specifically, this case study captures the background information used to support the design build contracting strategy decision, challenges, innovations, significant construction methods and factors contributing to the project success"]},{"key":"dc:description.sponsorship","label":"Dc Description Sponsorship","values":["CIVINS"]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/utahdepartmentof109459129"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["308 p."]},{"key":"dc:title","label":"Title","values":["Utah Department of Transportation I-15 case study (Design-build contracting strategy)"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.other":["CIVINS (Civilian Institutions)"],"dc:creator":["Kimball, Donna"],"dc:date.accessioned":["2012-08-09T19:24:33Z"],"dc:date.available":["2012-08-09T19:24:33Z"],"dc:date.issued":["1999-06-01"],"dc:description":["CIVINS (Civilian Institutions) Thesis document"],"dc:description.abstract":["Because there is great potential for additional public works agencies using design build (best value) strategies, a need exists to document the salient features of the I-15 project. By studying this enormous project, the successes and lessons learned may be applied to the next negotiated project. In addition, if the contract continues on its successful path additional progressive legislation may be petitioned from state agencies seeking to increase the construction value for tax dollars expended. Towards this end, this report documents the pre-award and construction of Interstate I-15 reconstruction. More specifically, this case study captures the background information used to support the design build contracting strategy decision, challenges, innovations, significant construction methods and factors contributing to the project success"],"dc:description.sponsorship":["CIVINS"],"dc:description.uri":["http://archive.org/details/utahdepartmentof109459129"],"dc:format.extent":["308 p."],"dc:identifier.oclc":["o640937135"],"dc:identifier.uri":["https://hdl.handle.net/10945/9129"],"dc:publisher":["Texas A&M University"],"dc:relation.ispartofseries":["CIVINS (Civilian Institutions) Theses and Dissertations"],"dc:relation.orgunit":["c6eb8929-c883-4d31-84f5-166ce3ae8c52"],"dc:relation.seriesentity":["0855bc76-cf0d-4c5f-84ba-3b1c54b01904"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States."],"dc:title":["Utah Department of Transportation I-15 case study (Design-build contracting strategy)"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Masters of Engineering"],"thesis:institution_name":["Texas A and M"]},"updated_at":"2026-11-19T06:44:58Z"}