{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/9240"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/9240","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"The impact of turn around time in Brazilian Navy inventories","abstract":"This thesis analyzes how the operation of helicopters produced and supported by manufacturers in various countries affect Brazilian Navy repairable inventories levels and costs. The research is based on a scenario where the Brazilian Navy operates 68 helicopters, manufactured by contractors in USA, France, England and Italy, and the Brazilian Navy relies on these manufacturers for depot-level maintenance. We develop a simulation model representing the repair process of a group of critical helicopter components and measure the turn-around time (TAT). We also develop a readiness based model to find the optimal inventory level of the selected group of helicopter components to achieve a desired operational availability under these TATs. The results were applied to a spreadsheet model to find the differences in spare levels and associated costs necessary to operate the helicopter fleet. Our research concludes that the helicopter's source has a substantial impact on repairable inventories levels and costs. Furthermore, this impact is large enough to influence decisions in the Brazilian Navy acquisition process of equipment and weapons systems.","abstract_html":"This thesis analyzes how the operation of helicopters produced and supported by manufacturers in various countries affect Brazilian Navy repairable inventories levels and costs. The research is based on a scenario where the Brazilian Navy operates 68 helicopters, manufactured by contractors in USA, France, England and Italy, and the Brazilian Navy relies on these manufacturers for depot-level maintenance. We develop a simulation model representing the repair process of a group of critical helicopter components and measure the turn-around time (TAT). We also develop a readiness based model to find the optimal inventory level of the selected group of helicopter components to achieve a desired operational availability under these TATs. The results were applied to a spreadsheet model to find the differences in spare levels and associated costs necessary to operate the helicopter fleet. Our research concludes that the helicopter&#x27;s source has a substantial impact on repairable inventories levels and costs. Furthermore, this impact is large enough to influence decisions in the Brazilian Navy acquisition process of equipment and weapons systems.","abstract_has_math":false,"creators":["Casagrande, Mauricio"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":null,"school":null,"contributors":[],"advisors":["Gue, Kevin R.","Maher, Kevin J."],"committee_chairs":[],"committee_members":[],"year":2000,"date_issued":"2000-12","date_published":"2000-12","updated_at":"2026-11-21T22:42:37Z","subjects":[],"languages":[],"rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://handle.dtic.mil/100.2/ADA386816"],"render_values":[{"text":"http://handle.dtic.mil/100.2/ADA386816","href":"http://handle.dtic.mil/100.2/ADA386816","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/9240","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/9240","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F9240","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F9240","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Gue, Kevin R.","Maher, Kevin J."]},{"key":"dc:creator","label":"Author","values":["Casagrande, Mauricio"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2000-12"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:28:05Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:28:05Z"]},{"key":"dc:date.issued","label":"Date","values":["2000-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://handle.dtic.mil/100.2/ADA386816","https://hdl.handle.net/10945/9240"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis analyzes how the operation of helicopters produced and supported by manufacturers in various countries affect Brazilian Navy repairable inventories levels and costs. The research is based on a scenario where the Brazilian Navy operates 68 helicopters, manufactured by contractors in USA, France, England and Italy, and the Brazilian Navy relies on these manufacturers for depot-level maintenance. We develop a simulation model representing the repair process of a group of critical helicopter components and measure the turn-around time (TAT). We also develop a readiness based model to find the optimal inventory level of the selected group of helicopter components to achieve a desired operational availability under these TATs. The results were applied to a spreadsheet model to find the differences in spare levels and associated costs necessary to operate the helicopter fleet. Our research concludes that the helicopter's source has a substantial impact on repairable inventories levels and costs. Furthermore, this impact is large enough to influence decisions in the Brazilian Navy acquisition process of equipment and weapons systems."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/theimpactofturnr109459240"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xiv, 67 p.;28 cm."]},{"key":"dc:title","label":"Title","values":["The impact of turn around time in Brazilian Navy inventories"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Commander, Brazilian Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Gue, Kevin R.","Maher, Kevin J."],"dc:creator":["Casagrande, Mauricio"],"dc:date":["2000-12"],"dc:date.accessioned":["2012-08-09T19:28:05Z"],"dc:date.available":["2012-08-09T19:28:05Z"],"dc:date.issued":["2000-12"],"dc:description.abstract":["This thesis analyzes how the operation of helicopters produced and supported by manufacturers in various countries affect Brazilian Navy repairable inventories levels and costs. The research is based on a scenario where the Brazilian Navy operates 68 helicopters, manufactured by contractors in USA, France, England and Italy, and the Brazilian Navy relies on these manufacturers for depot-level maintenance. We develop a simulation model representing the repair process of a group of critical helicopter components and measure the turn-around time (TAT). We also develop a readiness based model to find the optimal inventory level of the selected group of helicopter components to achieve a desired operational availability under these TATs. The results were applied to a spreadsheet model to find the differences in spare levels and associated costs necessary to operate the helicopter fleet. Our research concludes that the helicopter's source has a substantial impact on repairable inventories levels and costs. Furthermore, this impact is large enough to influence decisions in the Brazilian Navy acquisition process of equipment and weapons systems."],"dc:description.uri":["http://archive.org/details/theimpactofturnr109459240"],"dc:format.extent":["xiv, 67 p.;28 cm."],"dc:identifier.uri":["http://handle.dtic.mil/100.2/ADA386816","https://hdl.handle.net/10945/9240"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["Copyright is reserved by the copyright owner.","Approved for public release; distribution is unlimited."],"dc:title":["The impact of turn around time in Brazilian Navy inventories"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Commander, Brazilian Navy"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:42:37Z"}