{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/9291"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/9291","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Closing the gap between budget formulation and execution","abstract":"This thesis is a case study analysis of the Resource Management Office of the Bureau of Naval Personnel (PERS-02). Specifically, an analysis of projected versus actual budget figures was conducted. The purpose of the research was to explain anomalies in the budget formulation figures as compared to actual budget execution figures and define ways to improve the protocol between budget activities. Based on model comparisons, document reviews, and semi-structured interviews of PERS-02 leaders and managers, there were indications that PERS-02 had been severely stressed due to personnel reductions, a partial relocation to Millington, TN, and less than anticipated time savings from information technology management changes. Recommendations are offered to assist leaders and managers in making systematic changes to improve the efficiency and effectiveness of PERS-02 with the goal of increasing accuracy during budget formulation. Specific recommendations include: creation of realistic training programs tailored to enhance individual knowledge and skill sets, increased use of automated data systems geared to budget formulation and execution such as budget Builder and FASTDATA, and work schedule changes using shifts for both days and evenings.","abstract_html":"This thesis is a case study analysis of the Resource Management Office of the Bureau of Naval Personnel (PERS-02). Specifically, an analysis of projected versus actual budget figures was conducted. The purpose of the research was to explain anomalies in the budget formulation figures as compared to actual budget execution figures and define ways to improve the protocol between budget activities. Based on model comparisons, document reviews, and semi-structured interviews of PERS-02 leaders and managers, there were indications that PERS-02 had been severely stressed due to personnel reductions, a partial relocation to Millington, TN, and less than anticipated time savings from information technology management changes. Recommendations are offered to assist leaders and managers in making systematic changes to improve the efficiency and effectiveness of PERS-02 with the goal of increasing accuracy during budget formulation. Specific recommendations include: creation of realistic training programs tailored to enhance individual knowledge and skill sets, increased use of automated data systems geared to budget formulation and execution such as budget Builder and FASTDATA, and work schedule changes using shifts for both days and evenings.","abstract_has_math":false,"creators":["Lowery, Erainust"],"institution":"Monterey, California. Naval Postgraduate School","degree_name":"M.S. in Management","degree_level":"Masters","degree_discipline":"Management","degree_department":null,"school":null,"contributors":[],"advisors":["Mutty, John E.","Jones, Lawrence R."],"committee_chairs":[],"committee_members":[],"year":2000,"date_issued":"2000-06","date_published":"2000-06","updated_at":"2026-11-21T22:23:57Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://handle.dtic.mil/100.2/ADA381066"],"render_values":[{"text":"http://handle.dtic.mil/100.2/ADA381066","href":"http://handle.dtic.mil/100.2/ADA381066","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/9291","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/9291","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F9291","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F9291","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Mutty, John E.","Jones, Lawrence R."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Naval Postgraduate School (U.S.)"]},{"key":"dc:creator","label":"Author","values":["Lowery, Erainust"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["June 2000"]},{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:28:25Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:28:25Z"]},{"key":"dc:date.issued","label":"Date","values":["2000-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, California. Naval Postgraduate School"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Management"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["M.S. in Management"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Budget formulation","Budget execution","BUPERS","PERS-02","Resource Management Office"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["http://handle.dtic.mil/100.2/ADA381066","https://hdl.handle.net/10945/9291"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This thesis is a case study analysis of the Resource Management Office of the Bureau of Naval Personnel (PERS-02). Specifically, an analysis of projected versus actual budget figures was conducted. The purpose of the research was to explain anomalies in the budget formulation figures as compared to actual budget execution figures and define ways to improve the protocol between budget activities. Based on model comparisons, document reviews, and semi-structured interviews of PERS-02 leaders and managers, there were indications that PERS-02 had been severely stressed due to personnel reductions, a partial relocation to Millington, TN, and less than anticipated time savings from information technology management changes. Recommendations are offered to assist leaders and managers in making systematic changes to improve the efficiency and effectiveness of PERS-02 with the goal of increasing accuracy during budget formulation. Specific recommendations include: creation of realistic training programs tailored to enhance individual knowledge and skill sets, increased use of automated data systems geared to budget formulation and execution such as budget Builder and FASTDATA, and work schedule changes using shifts for both days and evenings."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/closinggapbetwee109459291"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["v, 81 p."]},{"key":"dc:title","label":"Title","values":["Closing the gap between budget formulation and execution"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Civilian, Naval Postgraduate School"]}]}],"canonical_facts":{"dc:contributor.advisor":["Mutty, John E.","Jones, Lawrence R."],"dc:contributor.other":["Naval Postgraduate School (U.S.)"],"dc:creator":["Lowery, Erainust"],"dc:date":["June 2000"],"dc:date.accessioned":["2012-08-09T19:28:25Z"],"dc:date.available":["2012-08-09T19:28:25Z"],"dc:date.issued":["2000-06"],"dc:description.abstract":["This thesis is a case study analysis of the Resource Management Office of the Bureau of Naval Personnel (PERS-02). Specifically, an analysis of projected versus actual budget figures was conducted. The purpose of the research was to explain anomalies in the budget formulation figures as compared to actual budget execution figures and define ways to improve the protocol between budget activities. Based on model comparisons, document reviews, and semi-structured interviews of PERS-02 leaders and managers, there were indications that PERS-02 had been severely stressed due to personnel reductions, a partial relocation to Millington, TN, and less than anticipated time savings from information technology management changes. Recommendations are offered to assist leaders and managers in making systematic changes to improve the efficiency and effectiveness of PERS-02 with the goal of increasing accuracy during budget formulation. Specific recommendations include: creation of realistic training programs tailored to enhance individual knowledge and skill sets, increased use of automated data systems geared to budget formulation and execution such as budget Builder and FASTDATA, and work schedule changes using shifts for both days and evenings."],"dc:description.uri":["http://archive.org/details/closinggapbetwee109459291"],"dc:format.extent":["v, 81 p."],"dc:identifier.uri":["http://handle.dtic.mil/100.2/ADA381066","https://hdl.handle.net/10945/9291"],"dc:publisher":["Monterey, California. Naval Postgraduate School"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Budget formulation","Budget execution","BUPERS","PERS-02","Resource Management Office"],"dc:title":["Closing the gap between budget formulation and execution"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Civilian, Naval Postgraduate School"],"thesis:degree_discipline":["Management"],"thesis:degree_level":["Masters"],"thesis:degree_name":["M.S. in Management"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-21T22:23:57Z"}