{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/9472"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/9472","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Criteria for the selection of designated projects.","abstract":"The purpose o£ this paper is to study the criteria used in establishing designated project management in the United States Navy, then to compare that criteria to organizational theory and industrial practice. It is hoped that this discussion will improve insight into this form of organization, currently being utilized to a greater and greater extent, and that more meaningful and useful criteria for the establishment of project management can be recommended. This paper will attempt to clarify and identify project management and its objectives, present a brief history of this type of organization, examine the requirements which originally led to selecting designated projects, and discuss the planning and dec is ion-making process that precedes the establishment of such a project. It will also discuss the costs and the benefits of project management and demonstrate why sound criteria for establishing designated projects are needed. The specific research question addressed is, what criteria should be utilized in the selection of weapon or support systems to be designated for project management.","abstract_html":"The purpose o£ this paper is to study the criteria used in establishing designated project management in the United States Navy, then to compare that criteria to organizational theory and industrial practice. It is hoped that this discussion will improve insight into this form of organization, currently being utilized to a greater and greater extent, and that more meaningful and useful criteria for the establishment of project management can be recommended. This paper will attempt to clarify and identify project management and its objectives, present a brief history of this type of organization, examine the requirements which originally led to selecting designated projects, and discuss the planning and dec is ion-making process that precedes the establishment of such a project. It will also discuss the costs and the benefits of project management and demonstrate why sound criteria for establishing designated projects are needed. The specific research question addressed is, what criteria should be utilized in the selection of weapon or support systems to be designated for project management.","abstract_has_math":false,"creators":["Smith, Charles E."],"institution":"George Washington University","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Page, Harry R."],"committee_chairs":[],"committee_members":[],"year":1966,"date_issued":"1966-04","date_published":"1966-04","updated_at":"2026-11-20T22:05:06Z","subjects":["Management"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/9472","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/9472","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F9472","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F9472","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Page, Harry R."]},{"key":"dc:creator","label":"Author","values":["Smith, Charles E."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-09T19:31:48Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-09T19:31:48Z"]},{"key":"dc:date.issued","label":"Date","values":["1966-04"]},{"key":"dc:publisher","label":"Institution","values":["George Washington University"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["George Washington University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Management"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/9472"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose o£ this paper is to study the criteria used in establishing designated project management in the United States Navy, then to compare that criteria to organizational theory and industrial practice. It is hoped that this discussion will improve insight into this form of organization, currently being utilized to a greater and greater extent, and that more meaningful and useful criteria for the establishment of project management can be recommended. This paper will attempt to clarify and identify project management and its objectives, present a brief history of this type of organization, examine the requirements which originally led to selecting designated projects, and discuss the planning and dec is ion-making process that precedes the establishment of such a project. It will also discuss the costs and the benefits of project management and demonstrate why sound criteria for establishing designated projects are needed. The specific research question addressed is, what criteria should be utilized in the selection of weapon or support systems to be designated for project management."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/criteriforselect109459472"]},{"key":"dc:title","label":"Title","values":["Criteria for the selection of designated projects."]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]}]}],"canonical_facts":{"dc:contributor.advisor":["Page, Harry R."],"dc:creator":["Smith, Charles E."],"dc:date.accessioned":["2012-08-09T19:31:48Z"],"dc:date.available":["2012-08-09T19:31:48Z"],"dc:date.issued":["1966-04"],"dc:description.abstract":["The purpose o£ this paper is to study the criteria used in establishing designated project management in the United States Navy, then to compare that criteria to organizational theory and industrial practice. It is hoped that this discussion will improve insight into this form of organization, currently being utilized to a greater and greater extent, and that more meaningful and useful criteria for the establishment of project management can be recommended. This paper will attempt to clarify and identify project management and its objectives, present a brief history of this type of organization, examine the requirements which originally led to selecting designated projects, and discuss the planning and dec is ion-making process that precedes the establishment of such a project. It will also discuss the costs and the benefits of project management and demonstrate why sound criteria for establishing designated projects are needed. The specific research question addressed is, what criteria should be utilized in the selection of weapon or support systems to be designated for project management."],"dc:description.uri":["http://archive.org/details/criteriforselect109459472"],"dc:identifier.uri":["https://hdl.handle.net/10945/9472"],"dc:publisher":["George Washington University"],"dc:subject.lcsh":["Management"],"dc:title":["Criteria for the selection of designated projects."],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["George Washington University"]},"updated_at":"2026-11-20T22:05:06Z"}