{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/9814"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/9814","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Analysis of churn and excess material at the Pearl Harbor Naval Shipyard","abstract":"For a Naval Shipyard, the amount of material ordered after beginning an availability (churn) and the amount of material ordered but not used (excess) are key performance indicators. Pearl Harbor Naval Shipyard's metrics indicate that an average of 50% of material ordered during an availability is ordered after the start of the availability and that 15% of material is excess. The NAVSEA goal for both metrics is 5%. We investigate the causes of high rates of material churn and excess at Pearl Harbor Naval Shipyard and provide recommendations for reducing them.","abstract_html":"For a Naval Shipyard, the amount of material ordered after beginning an availability (churn) and the amount of material ordered but not used (excess) are key performance indicators. Pearl Harbor Naval Shipyard&#x27;s metrics indicate that an average of 50% of material ordered during an availability is ordered after the start of the availability and that 15% of material is excess. The NAVSEA goal for both metrics is 5%. We investigate the causes of high rates of material churn and excess at Pearl Harbor Naval Shipyard and provide recommendations for reducing them.","abstract_has_math":false,"creators":["Cheshure, Kevin","Hunt, Anthony","Bangert, Lawrence"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Gue, Kevin","Doerr, Kenneth"],"committee_chairs":[],"committee_members":[],"year":2003,"date_issued":"2003-12","date_published":"2003-12","updated_at":"2026-11-19T06:45:16Z","subjects":["Material requirements planning|zUnited States."],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/9814","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/9814","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F9814","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F9814","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Gue, Kevin","Doerr, Kenneth"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Cheshure, Kevin","Hunt, Anthony","Bangert, Lawrence"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:30:14Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:30:14Z"]},{"key":"dc:date.issued","label":"Date","values":["2003-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School (U.S.)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Pearl Harbor Naval Shipyard Churn and Excess Material","PHNSY Churn and Excess Material"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Material requirements planning|zUnited States."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/9814"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["For a Naval Shipyard, the amount of material ordered after beginning an availability (churn) and the amount of material ordered but not used (excess) are key performance indicators. Pearl Harbor Naval Shipyard's metrics indicate that an average of 50% of material ordered during an availability is ordered after the start of the availability and that 15% of material is excess. The NAVSEA goal for both metrics is 5%. We investigate the causes of high rates of material churn and excess at Pearl Harbor Naval Shipyard and provide recommendations for reducing them."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/analysisofchurnn109459814"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xii, 30 p : ill. (some col.) ; 28 cm."]},{"key":"dc:title","label":"Title","values":["Analysis of churn and excess material at the Pearl Harbor Naval Shipyard"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant Commander, United States Navy","Lieutenant, United States Naval Reserve"]}]}],"canonical_facts":{"dc:contributor.advisor":["Gue, Kevin","Doerr, Kenneth"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Cheshure, Kevin","Hunt, Anthony","Bangert, Lawrence"],"dc:date.accessioned":["2012-08-22T15:30:14Z"],"dc:date.available":["2012-08-22T15:30:14Z"],"dc:date.issued":["2003-12"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["For a Naval Shipyard, the amount of material ordered after beginning an availability (churn) and the amount of material ordered but not used (excess) are key performance indicators. Pearl Harbor Naval Shipyard's metrics indicate that an average of 50% of material ordered during an availability is ordered after the start of the availability and that 15% of material is excess. The NAVSEA goal for both metrics is 5%. We investigate the causes of high rates of material churn and excess at Pearl Harbor Naval Shipyard and provide recommendations for reducing them."],"dc:description.uri":["http://archive.org/details/analysisofchurnn109459814"],"dc:format.extent":["xii, 30 p : ill. (some col.) ; 28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/9814"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Pearl Harbor Naval Shipyard Churn and Excess Material","PHNSY Churn and Excess Material"],"dc:subject.lcsh":["Material requirements planning|zUnited States."],"dc:title":["Analysis of churn and excess material at the Pearl Harbor Naval Shipyard"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant Commander, United States Navy","Lieutenant, United States Naval Reserve"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School (U.S.)"]},"updated_at":"2026-11-19T06:45:16Z"}