{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/9828"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/9828","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Navy/Marine Corps TACAIR integration: impact on operational and supporting activities","abstract":"The purpose of this MBA Project was to investigate and provide a comprehensive overview regarding the current issues regarding Tactical Aircraft Integration within the Department of the Navy. This project was conducted with the sponsorship and assistance of the Comptroller, Commander Naval Air Forces Pacific. The goal of this project was to identify issues and provide an analysis of the ongoing efforts between the Navy and Marine Corps. Four criteria were set aside for deliverables: 1) Produce key documentation, most notably the Memorandum of Understanding and the Memorandum of Agreement; 2) Produce any milestones or timetables required for integration; 3) Discuss issues regarding funding and resource allocation as applied to the integration process; 4) Provide information on requirements for integrating operational and supporting activities. This project delineates a brief history of the operational requirements of the F/A-18 and what necessitated changes within the TACAIR community. The topics covered will explain how the plan was developed based on key assumptions and challenges, the implementation of the transformational plan to date, current funding issues, an analysis with recommendations of the transformational process, and an overview of the cultural change that will inevitably come with the transformation.","abstract_html":"The purpose of this MBA Project was to investigate and provide a comprehensive overview regarding the current issues regarding Tactical Aircraft Integration within the Department of the Navy. This project was conducted with the sponsorship and assistance of the Comptroller, Commander Naval Air Forces Pacific. The goal of this project was to identify issues and provide an analysis of the ongoing efforts between the Navy and Marine Corps. Four criteria were set aside for deliverables: 1) Produce key documentation, most notably the Memorandum of Understanding and the Memorandum of Agreement; 2) Produce any milestones or timetables required for integration; 3) Discuss issues regarding funding and resource allocation as applied to the integration process; 4) Provide information on requirements for integrating operational and supporting activities. This project delineates a brief history of the operational requirements of the F/A-18 and what necessitated changes within the TACAIR community. The topics covered will explain how the plan was developed based on key assumptions and challenges, the implementation of the transformational plan to date, current funding issues, an analysis with recommendations of the transformational process, and an overview of the cultural change that will inevitably come with the transformation.","abstract_has_math":false,"creators":["Martinez Diaz, Alberto","Forrero, Juan F.","Lamoureux, Gerard P.","Martin, Richard C."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Jones, Lawrence R.","McCaffery, Jerry L."],"committee_chairs":[],"committee_members":[],"year":2003,"date_issued":"2003-12","date_published":"2003-12","updated_at":"2026-11-19T06:45:16Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/9828","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/9828","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F9828","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Jones, Lawrence R.","McCaffery, Jerry L."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Martinez Diaz, Alberto","Forrero, Juan F.","Lamoureux, Gerard P.","Martin, Richard C."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:30:17Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:30:17Z"]},{"key":"dc:date.issued","label":"Date","values":["2003-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Tactical Aircraft Integration","TACAIR Integration","TAI","Navy/Marine Corps Aviation Integration"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/9828"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this MBA Project was to investigate and provide a comprehensive overview regarding the current issues regarding Tactical Aircraft Integration within the Department of the Navy. This project was conducted with the sponsorship and assistance of the Comptroller, Commander Naval Air Forces Pacific. The goal of this project was to identify issues and provide an analysis of the ongoing efforts between the Navy and Marine Corps. Four criteria were set aside for deliverables: 1) Produce key documentation, most notably the Memorandum of Understanding and the Memorandum of Agreement; 2) Produce any milestones or timetables required for integration; 3) Discuss issues regarding funding and resource allocation as applied to the integration process; 4) Provide information on requirements for integrating operational and supporting activities. This project delineates a brief history of the operational requirements of the F/A-18 and what necessitated changes within the TACAIR community. The topics covered will explain how the plan was developed based on key assumptions and challenges, the implementation of the transformational plan to date, current funding issues, an analysis with recommendations of the transformational process, and an overview of the cultural change that will inevitably come with the transformation."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/navymarinecorpst109459828"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["viii, 49 p. : col. ill., 28 cm."]},{"key":"dc:title","label":"Title","values":["Navy/Marine Corps TACAIR integration: impact on operational and supporting activities"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Captain, United States Marine Corps","Lieutenant Commander, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Jones, Lawrence R.","McCaffery, Jerry L."],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Martinez Diaz, Alberto","Forrero, Juan F.","Lamoureux, Gerard P.","Martin, Richard C."],"dc:date.accessioned":["2012-08-22T15:30:17Z"],"dc:date.available":["2012-08-22T15:30:17Z"],"dc:date.issued":["2003-12"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["The purpose of this MBA Project was to investigate and provide a comprehensive overview regarding the current issues regarding Tactical Aircraft Integration within the Department of the Navy. This project was conducted with the sponsorship and assistance of the Comptroller, Commander Naval Air Forces Pacific. The goal of this project was to identify issues and provide an analysis of the ongoing efforts between the Navy and Marine Corps. Four criteria were set aside for deliverables: 1) Produce key documentation, most notably the Memorandum of Understanding and the Memorandum of Agreement; 2) Produce any milestones or timetables required for integration; 3) Discuss issues regarding funding and resource allocation as applied to the integration process; 4) Provide information on requirements for integrating operational and supporting activities. This project delineates a brief history of the operational requirements of the F/A-18 and what necessitated changes within the TACAIR community. The topics covered will explain how the plan was developed based on key assumptions and challenges, the implementation of the transformational plan to date, current funding issues, an analysis with recommendations of the transformational process, and an overview of the cultural change that will inevitably come with the transformation."],"dc:description.uri":["http://archive.org/details/navymarinecorpst109459828"],"dc:format.extent":["viii, 49 p. : col. ill., 28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/9828"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Tactical Aircraft Integration","TACAIR Integration","TAI","Navy/Marine Corps Aviation Integration"],"dc:title":["Navy/Marine Corps TACAIR integration: impact on operational and supporting activities"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Captain, United States Marine Corps","Lieutenant Commander, United States Navy"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:45:16Z"}