{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/9945"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/9945","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Cost analysis for the development and operation of a mobile wireless research facility","abstract":"The Nemesis program's primary objective is to provide a mobile wireless research facility for Federal agencies and other authorized agencies. The report provides estimates of the Nemesis program's original cost, replication cost, scheduled costing for operational requirements, and budgeting guidelines. The report provides future funding request justification for both labor and equipment lifecycle costs. The report also provides the program funding agencies a more precise cost benefit analysis, to project future operating costs, and to provide standardized budget guidelines. The estimate of the original cost includes equipment acquisitions, software and reference material acquisition, inventory validation, billed labor, estimated non-billed labor, estimated nonbilled infrastructure support, billed training and certification, estimated project management, and estimated administrative support. The estimate of the original cost does not include legal support and Governmental administrative requirements. The replicating cost is determined from the original cost with discovery costs removed. The discovery cost includes initial research/evaluation of alternate methods of system implementation, reduced expertise in labor due to documented replicating procedures, and an improved training process for operators. The costing schedule is based on the projected program-operating tempo. The budgeting guidelines provide the budget format, target parameters for inventory, and capital reinvestment to offset depreciation expenses.","abstract_html":"The Nemesis program&#x27;s primary objective is to provide a mobile wireless research facility for Federal agencies and other authorized agencies. The report provides estimates of the Nemesis program&#x27;s original cost, replication cost, scheduled costing for operational requirements, and budgeting guidelines. The report provides future funding request justification for both labor and equipment lifecycle costs. The report also provides the program funding agencies a more precise cost benefit analysis, to project future operating costs, and to provide standardized budget guidelines. The estimate of the original cost includes equipment acquisitions, software and reference material acquisition, inventory validation, billed labor, estimated non-billed labor, estimated nonbilled infrastructure support, billed training and certification, estimated project management, and estimated administrative support. The estimate of the original cost does not include legal support and Governmental administrative requirements. The replicating cost is determined from the original cost with discovery costs removed. The discovery cost includes initial research/evaluation of alternate methods of system implementation, reduced expertise in labor due to documented replicating procedures, and an improved training process for operators. The costing schedule is based on the projected program-operating tempo. The budgeting guidelines provide the budget format, target parameters for inventory, and capital reinvestment to offset depreciation expenses.","abstract_has_math":false,"creators":["Lock, Jeffrey S.","Weber, John B."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Steckler, Brian D.","Thomas, George W.","Webb, Juliette A."],"committee_chairs":[],"committee_members":[],"year":2004,"date_issued":"2004-03","date_published":"2004-03","updated_at":"2026-11-19T06:45:28Z","subjects":["Cost, Analysis."],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/9945","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/9945","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F9945","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F9945","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Steckler, Brian D.","Thomas, George W.","Webb, Juliette A."]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Lock, Jeffrey S.","Weber, John B."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:30:43Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:30:43Z"]},{"key":"dc:date.issued","label":"Date","values":["2004-03"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School (U.S.)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Nemesis project","MNOC","Financial analysis for technical research","Research program budgeting","Operations costing","Mission costing","Estimating research program originating costs","NetWarVan","NPS","replicating","DoD","Cebrowski Institute","GSBPP"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["Cost, Analysis."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/9945"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["The Nemesis program's primary objective is to provide a mobile wireless research facility for Federal agencies and other authorized agencies. The report provides estimates of the Nemesis program's original cost, replication cost, scheduled costing for operational requirements, and budgeting guidelines. The report provides future funding request justification for both labor and equipment lifecycle costs. The report also provides the program funding agencies a more precise cost benefit analysis, to project future operating costs, and to provide standardized budget guidelines. The estimate of the original cost includes equipment acquisitions, software and reference material acquisition, inventory validation, billed labor, estimated non-billed labor, estimated nonbilled infrastructure support, billed training and certification, estimated project management, and estimated administrative support. The estimate of the original cost does not include legal support and Governmental administrative requirements. The replicating cost is determined from the original cost with discovery costs removed. The discovery cost includes initial research/evaluation of alternate methods of system implementation, reduced expertise in labor due to documented replicating procedures, and an improved training process for operators. The costing schedule is based on the projected program-operating tempo. The budgeting guidelines provide the budget format, target parameters for inventory, and capital reinvestment to offset depreciation expenses."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/costnalysisforde109459945"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xvi, 100 p."]},{"key":"dc:title","label":"Title","values":["Cost analysis for the development and operation of a mobile wireless research facility"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Lieutenant, United States Navy"]}]}],"canonical_facts":{"dc:contributor.advisor":["Steckler, Brian D.","Thomas, George W.","Webb, Juliette A."],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Lock, Jeffrey S.","Weber, John B."],"dc:date.accessioned":["2012-08-22T15:30:43Z"],"dc:date.available":["2012-08-22T15:30:43Z"],"dc:date.issued":["2004-03"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["The Nemesis program's primary objective is to provide a mobile wireless research facility for Federal agencies and other authorized agencies. The report provides estimates of the Nemesis program's original cost, replication cost, scheduled costing for operational requirements, and budgeting guidelines. The report provides future funding request justification for both labor and equipment lifecycle costs. The report also provides the program funding agencies a more precise cost benefit analysis, to project future operating costs, and to provide standardized budget guidelines. The estimate of the original cost includes equipment acquisitions, software and reference material acquisition, inventory validation, billed labor, estimated non-billed labor, estimated nonbilled infrastructure support, billed training and certification, estimated project management, and estimated administrative support. The estimate of the original cost does not include legal support and Governmental administrative requirements. The replicating cost is determined from the original cost with discovery costs removed. The discovery cost includes initial research/evaluation of alternate methods of system implementation, reduced expertise in labor due to documented replicating procedures, and an improved training process for operators. The costing schedule is based on the projected program-operating tempo. The budgeting guidelines provide the budget format, target parameters for inventory, and capital reinvestment to offset depreciation expenses."],"dc:description.uri":["http://archive.org/details/costnalysisforde109459945"],"dc:format.extent":["xvi, 100 p."],"dc:identifier.uri":["https://hdl.handle.net/10945/9945"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Nemesis project","MNOC","Financial analysis for technical research","Research program budgeting","Operations costing","Mission costing","Estimating research program originating costs","NetWarVan","NPS","replicating","DoD","Cebrowski Institute","GSBPP"],"dc:subject.lcsh":["Cost, Analysis."],"dc:title":["Cost analysis for the development and operation of a mobile wireless research facility"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Lieutenant, United States Navy"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School (U.S.)"]},"updated_at":"2026-11-19T06:45:28Z"}