{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/9991"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/9991","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"An evaluation of contingency contracting: past, present, and future","abstract":"The purpose of this study is to identify problems that contingency contracting officers have faced in past contingencies, what problems they are facing in current contingencies, and what problems they are likely to face in the future as the nature of warfare changes in order to increase their efficiency and effectiveness. This effort was accomplished by conducting a historical analysis of contingency contracting from 1775 up to today's Operation Iraqi Freedom, with special emphasis placed on contingencies between 1990 and 2005. An evaluation of the generations of war was conducted to determine what challenges contingency contracting officers may face in the future. The results of this study revealed four main problem areas that hinder a contingency contracting officer's efficiency and effectiveness. These four areas are (1) Policy, (2) Planning, (3) Organization, and (4) Training. This study then analyzed each area to identify how it was hindering the contingency contracting officer. Recommendations ranged from developing a Joint Contingency Contracting Operations Manual to adopting a new contingency contracting structure based on the Yoder Three-Tier Model.","abstract_html":"The purpose of this study is to identify problems that contingency contracting officers have faced in past contingencies, what problems they are facing in current contingencies, and what problems they are likely to face in the future as the nature of warfare changes in order to increase their efficiency and effectiveness. This effort was accomplished by conducting a historical analysis of contingency contracting from 1775 up to today&#x27;s Operation Iraqi Freedom, with special emphasis placed on contingencies between 1990 and 2005. An evaluation of the generations of war was conducted to determine what challenges contingency contracting officers may face in the future. The results of this study revealed four main problem areas that hinder a contingency contracting officer&#x27;s efficiency and effectiveness. These four areas are (1) Policy, (2) Planning, (3) Organization, and (4) Training. This study then analyzed each area to identify how it was hindering the contingency contracting officer. Recommendations ranged from developing a Joint Contingency Contracting Operations Manual to adopting a new contingency contracting structure based on the Yoder Three-Tier Model.","abstract_has_math":false,"creators":["Starr, Stephen","Luse, Carey","Madeline, Christopher","Smith, Landon"],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Business Administration","degree_level":"Masters","degree_discipline":"Business Administration","degree_department":null,"school":null,"contributors":[],"advisors":["Yoder, E. Cory","Tudor, Ron"],"committee_chairs":[],"committee_members":[],"year":2005,"date_issued":"2005-12","date_published":"2005-12","updated_at":"2026-11-19T06:45:28Z","subjects":["History."],"languages":[],"rights":["Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/9991","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/9991","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Anps%3Aoai%3Acalhoun.nps.edu%3A10945%2F9991","prefix":"oai_dc"},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F9991","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Yoder, E. Cory","Tudor, Ron"]},{"key":"dc:contributor.other","label":"Dc Contributor Other","values":["Graduate School of Business & Public Policy (GSBPP)"]},{"key":"dc:creator","label":"Author","values":["Starr, Stephen","Luse, Carey","Madeline, Christopher","Smith, Landon"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-08-22T15:30:51Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-08-22T15:30:51Z"]},{"key":"dc:date.issued","label":"Date","values":["2005-12"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.ispartofseries","label":"Dc Relation Ispartofseries","values":["Master of Business Administration (MBA) Professional Reports"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"]},{"key":"dc:relation.seriesentity","label":"Dc Relation Seriesentity","values":["e0c365f0-ed04-4d27-bded-11759168d050"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Business Administration"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Business Administration"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School (U.S.)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Contingency Contracting","Fourth Generation War","Contingency Contracting Support Plan","CCSP","Yoder Three-Tier Model","Deliberate Action Planning","Crisis Action Planning","Contracting Structure","Defense Acquisition University","DAU","Defense Acquisition Workforce Improvement Act","DAWIA"]},{"key":"dc:subject.lcsh","label":"Dc Subject Lcsh","values":["History."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/9991"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["MBA Professional Report"]},{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this study is to identify problems that contingency contracting officers have faced in past contingencies, what problems they are facing in current contingencies, and what problems they are likely to face in the future as the nature of warfare changes in order to increase their efficiency and effectiveness. This effort was accomplished by conducting a historical analysis of contingency contracting from 1775 up to today's Operation Iraqi Freedom, with special emphasis placed on contingencies between 1990 and 2005. An evaluation of the generations of war was conducted to determine what challenges contingency contracting officers may face in the future. The results of this study revealed four main problem areas that hinder a contingency contracting officer's efficiency and effectiveness. These four areas are (1) Policy, (2) Planning, (3) Organization, and (4) Training. This study then analyzed each area to identify how it was hindering the contingency contracting officer. Recommendations ranged from developing a Joint Contingency Contracting Operations Manual to adopting a new contingency contracting structure based on the Yoder Three-Tier Model."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/anevaluationofco109459991"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["79 p. : ill. ; 28 cm."]},{"key":"dc:title","label":"Title","values":["An evaluation of contingency contracting: past, present, and future"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["US Army (USA) author"]}]}],"canonical_facts":{"dc:contributor.advisor":["Yoder, E. Cory","Tudor, Ron"],"dc:contributor.other":["Graduate School of Business & Public Policy (GSBPP)"],"dc:creator":["Starr, Stephen","Luse, Carey","Madeline, Christopher","Smith, Landon"],"dc:date.accessioned":["2012-08-22T15:30:51Z"],"dc:date.available":["2012-08-22T15:30:51Z"],"dc:date.issued":["2005-12"],"dc:description":["MBA Professional Report"],"dc:description.abstract":["The purpose of this study is to identify problems that contingency contracting officers have faced in past contingencies, what problems they are facing in current contingencies, and what problems they are likely to face in the future as the nature of warfare changes in order to increase their efficiency and effectiveness. This effort was accomplished by conducting a historical analysis of contingency contracting from 1775 up to today's Operation Iraqi Freedom, with special emphasis placed on contingencies between 1990 and 2005. An evaluation of the generations of war was conducted to determine what challenges contingency contracting officers may face in the future. The results of this study revealed four main problem areas that hinder a contingency contracting officer's efficiency and effectiveness. These four areas are (1) Policy, (2) Planning, (3) Organization, and (4) Training. This study then analyzed each area to identify how it was hindering the contingency contracting officer. Recommendations ranged from developing a Joint Contingency Contracting Operations Manual to adopting a new contingency contracting structure based on the Yoder Three-Tier Model."],"dc:description.uri":["http://archive.org/details/anevaluationofco109459991"],"dc:format.extent":["79 p. : ill. ; 28 cm."],"dc:identifier.uri":["https://hdl.handle.net/10945/9991"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.ispartofseries":["Master of Business Administration (MBA) Professional Reports"],"dc:relation.orgunit":["689b9e9a-8dae-40b6-b61b-bc2662e12411","b8b0094c-45b5-4a6a-8813-f61a5dec4f2a"],"dc:relation.seriesentity":["e0c365f0-ed04-4d27-bded-11759168d050"],"dc:rights":["Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Contingency Contracting","Fourth Generation War","Contingency Contracting Support Plan","CCSP","Yoder Three-Tier Model","Deliberate Action Planning","Crisis Action Planning","Contracting Structure","Defense Acquisition University","DAU","Defense Acquisition Workforce Improvement Act","DAWIA"],"dc:subject.lcsh":["History."],"dc:title":["An evaluation of contingency contracting: past, present, and future"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["US Army (USA) author"],"thesis:degree_discipline":["Business Administration"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Business Administration"],"thesis:institution_name":["Naval Postgraduate School (U.S.)"]},"updated_at":"2026-11-19T06:45:28Z"}