{"id":{"repo_id":"nps","oai_identifier":"oai:calhoun.nps.edu:10945/999"},"canonical_url":"https://search.ndltd.org/etd/nps/oai:calhoun.nps.edu:10945/999","repository":{"repo_id":"nps","name":"Naval Postgraduate School","base_url":"https://calhoun.nps.edu/server/oai/request"},"display":{"title":"Enhancing persistence when optimally scheduling depot-level repair activity for the United States Marine Corps","abstract":"The United States Marine Corps' ability to wage war and its warfighting effectiveness rely heavily on the availability of its tactical ground equipment. The Marine Corps optimizes the warfighting availability of its tactical ground equipment in its depot-level repair plan, which commits $450 million over a six-year horizon. Currently, small changes (for example, budget) to the input to this model produce non-intuitive revisions that are needlessly disruptive. The Marine Corps Materiel Command (MATCOM) recognizes this problem and has asked for enhancement of their current model to include persistent features. We show that turbulence can be reduced at little cost in warfighting availability. We also investigate an approximate, but very fast heuristic in lieu of mathematical optimization to solve this problem. A simple greedy myopic heuristic quickly produces nearly-optimal advice to the depot-level planning problem.","abstract_html":"The United States Marine Corps&#x27; ability to wage war and its warfighting effectiveness rely heavily on the availability of its tactical ground equipment. The Marine Corps optimizes the warfighting availability of its tactical ground equipment in its depot-level repair plan, which commits $450 million over a six-year horizon. Currently, small changes (for example, budget) to the input to this model produce non-intuitive revisions that are needlessly disruptive. The Marine Corps Materiel Command (MATCOM) recognizes this problem and has asked for enhancement of their current model to include persistent features. We show that turbulence can be reduced at little cost in warfighting availability. We also investigate an approximate, but very fast heuristic in lieu of mathematical optimization to solve this problem. A simple greedy myopic heuristic quickly produces nearly-optimal advice to the depot-level planning problem.","abstract_has_math":false,"creators":["Drexler, Jonathan A."],"institution":"Monterey, CA; Naval Postgraduate School","degree_name":"Master of Science in Operations Research","degree_level":"Masters","degree_discipline":"Operations Research","degree_department":"Operations Research (OR)","school":null,"contributors":[],"advisors":["Brown, Gerald G."],"committee_chairs":[],"committee_members":["Washburn, Alan R."],"year":2003,"date_issued":"2003-06","date_published":"2003-06","updated_at":"2026-11-19T06:45:28Z","subjects":[],"languages":[],"rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10945/999","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10945/999","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://calhoun.nps.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Acalhoun.nps.edu%3A10945%2F999","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Brown, Gerald G."]},{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Washburn, Alan R."]},{"key":"dc:contributor.department","label":"Department","values":["Operations Research (OR)"]},{"key":"dc:creator","label":"Author","values":["Drexler, Jonathan A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2012-03-14T17:30:12Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2012-03-14T17:30:12Z"]},{"key":"dc:date.issued","label":"Date","values":["2003-06"]},{"key":"dc:publisher","label":"Institution","values":["Monterey, CA; Naval Postgraduate School"]},{"key":"dc:relation.orgunit","label":"Dc Relation Orgunit","values":["58745961-c46a-45ad-ae9c-d139d1ba1041"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science in Operations Research"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Naval Postgraduate School"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject.keyword","label":"Dc Subject Keyword","values":["Optimization","Persistence","Heuristic","Maintenance Planning","Depot Repair","Hamming distance"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10945/999"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The United States Marine Corps' ability to wage war and its warfighting effectiveness rely heavily on the availability of its tactical ground equipment. The Marine Corps optimizes the warfighting availability of its tactical ground equipment in its depot-level repair plan, which commits $450 million over a six-year horizon. Currently, small changes (for example, budget) to the input to this model produce non-intuitive revisions that are needlessly disruptive. The Marine Corps Materiel Command (MATCOM) recognizes this problem and has asked for enhancement of their current model to include persistent features. We show that turbulence can be reduced at little cost in warfighting availability. We also investigate an approximate, but very fast heuristic in lieu of mathematical optimization to solve this problem. A simple greedy myopic heuristic quickly produces nearly-optimal advice to the depot-level planning problem."]},{"key":"dc:description.uri","label":"Dc Description URI","values":["http://archive.org/details/enhancingpersist10945999"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["xx, 62 p. : ill. (some col.) ;"]},{"key":"dc:title","label":"Title","values":["Enhancing persistence when optimally scheduling depot-level repair activity for the United States Marine Corps"]},{"key":"dspace:entity.type","label":"Dspace Entity Type","values":["Publication"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Captain, United States Marine Corps"]}]}],"canonical_facts":{"dc:contributor.advisor":["Brown, Gerald G."],"dc:contributor.committeemember":["Washburn, Alan R."],"dc:contributor.department":["Operations Research (OR)"],"dc:creator":["Drexler, Jonathan A."],"dc:date.accessioned":["2012-03-14T17:30:12Z"],"dc:date.available":["2012-03-14T17:30:12Z"],"dc:date.issued":["2003-06"],"dc:description.abstract":["The United States Marine Corps' ability to wage war and its warfighting effectiveness rely heavily on the availability of its tactical ground equipment. The Marine Corps optimizes the warfighting availability of its tactical ground equipment in its depot-level repair plan, which commits $450 million over a six-year horizon. Currently, small changes (for example, budget) to the input to this model produce non-intuitive revisions that are needlessly disruptive. The Marine Corps Materiel Command (MATCOM) recognizes this problem and has asked for enhancement of their current model to include persistent features. We show that turbulence can be reduced at little cost in warfighting availability. We also investigate an approximate, but very fast heuristic in lieu of mathematical optimization to solve this problem. A simple greedy myopic heuristic quickly produces nearly-optimal advice to the depot-level planning problem."],"dc:description.uri":["http://archive.org/details/enhancingpersist10945999"],"dc:format.extent":["xx, 62 p. : ill. (some col.) ;"],"dc:identifier.uri":["https://hdl.handle.net/10945/999"],"dc:publisher":["Monterey, CA; Naval Postgraduate School"],"dc:relation.orgunit":["58745961-c46a-45ad-ae9c-d139d1ba1041"],"dc:rights":["This publication is a work of the U.S. Government as defined in Title 17, United States Code, Section 101. Copyright protection is not available for this work in the United States.","Approved for public release; distribution is unlimited."],"dc:subject.keyword":["Optimization","Persistence","Heuristic","Maintenance Planning","Depot Repair","Hamming distance"],"dc:title":["Enhancing persistence when optimally scheduling depot-level repair activity for the United States Marine Corps"],"dc:type":["Thesis"],"dspace:entity.type":["Publication"],"local:contributor.affiliation":["Captain, United States Marine Corps"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science in Operations Research"],"thesis:institution_name":["Naval Postgraduate School"]},"updated_at":"2026-11-19T06:45:28Z"}