{"id":{"repo_id":"odu","oai_identifier":"oai:digitalcommons.odu.edu:mae_etds-1000"},"canonical_url":"https://search.ndltd.org/etd/odu/oai:digitalcommons.odu.edu:mae_etds-1000","repository":{"repo_id":"odu","name":"Old Dominion University","base_url":"https://digitalcommons.odu.edu/do/oai/"},"display":{"title":"Dynamic Project Time and Cost Evaluation Under the Combined Influence of Contract, Quality, and Uncontrollable Change","abstract":"This dissertation proposes a method that quantifies the dynamics caused by disruptions due to multiple changes that can occur during the progression of a large scale project. To begin, equations consisting of multiple parallel event sequences are derived that define the relationship between individual process events and the final project completion time. Matrix notation and a precedence matrix concept are used in this derivation to produce equations that are best suited for computer programming applications. This relationship is the foundation upon which the equations are built to calculate the variation impact on each event of a large scale project. Pursuing this further, the Analytical Hierarchy Process is used to rank Contract, Quality and Uncontrollable Variation types to generate two multiplication factors. One factor accounts for the variation type, and the other captures the variation influence relative to each event. These factors are used to define and formulate the equations used to quantify the impact of variation on each project event. Matrix notation, binomial variables, and Hadamard operators are used in the formula to optimize the result’s applicability to large data sets required for large scale projects. In the final analysis, the impact equations are used in a Monte Carlo simulation to produce each impact probability. These impact probability results are helpful tools for managing cost and evaluating design options. The Monte Carlo results are also used to reinforce the proposed process by quantifying the impact of change and providing a measurable metric for performance accountability. Examples and illustrations are used in each derivation to better convey the proposed concepts and application.","abstract_html":"This dissertation proposes a method that quantifies the dynamics caused by disruptions due to multiple changes that can occur during the progression of a large scale project. To begin, equations consisting of multiple parallel event sequences are derived that define the relationship between individual process events and the final project completion time. Matrix notation and a precedence matrix concept are used in this derivation to produce equations that are best suited for computer programming applications. This relationship is the foundation upon which the equations are built to calculate the variation impact on each event of a large scale project. Pursuing this further, the Analytical Hierarchy Process is used to rank Contract, Quality and Uncontrollable Variation types to generate two multiplication factors. One factor accounts for the variation type, and the other captures the variation influence relative to each event. These factors are used to define and formulate the equations used to quantify the impact of variation on each project event. Matrix notation, binomial variables, and Hadamard operators are used in the formula to optimize the result’s applicability to large data sets required for large scale projects. In the final analysis, the impact equations are used in a Monte Carlo simulation to produce each impact probability. These impact probability results are helpful tools for managing cost and evaluating design options. The Monte Carlo results are also used to reinforce the proposed process by quantifying the impact of change and providing a measurable metric for performance accountability. Examples and illustrations are used in each derivation to better convey the proposed concepts and application.","abstract_has_math":false,"creators":["Hammock, Thomas V."],"institution":null,"degree_name":"Doctor of Philosophy (PhD)","degree_level":"Dissertation","degree_discipline":"Mechanical & Aerospace Engineering","degree_department":null,"school":null,"contributors":["Han P. Bao","Gene J. -W. Hou","Duc T. Nguyen"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-27T04:10:24Z","subjects":["Analytical hierarchy process","Change dynamics","Monte Carlo simulation","Project management","Performance accountability","Project metrics","Large data sets","Management Sciences and Quantitative Methods","Mechanical Engineering"],"languages":[],"rights":["<p>In Copyright. URI: <a href=\"http://rightsstatements.org/vocab/InC/1.0/\">http://rightsstatements.org/vocab/InC/1.0/</a> This Item is protected by copyright and/or related rights. You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights-holder(s).</p>"],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["9781339318790"],"render_values":[{"text":"9781339318790","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://digitalcommons.odu.edu/mae_etds/1","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://digitalcommons.odu.edu/mae_etds/1","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aodu%3Aoai%3Adigitalcommons.odu.edu%3Amae_etds-1000","prefix":"oai_dc"},"source_record":{"url":"https://digitalcommons.odu.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Adigitalcommons.odu.edu%3Amae_etds-1000","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Han P. Bao","Gene J. -W. Hou","Duc T. Nguyen"]},{"key":"dc:creator","label":"Author","values":["Hammock, Thomas V."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.available","label":"Dc Date Available","values":["2016-01-11T08:00:00Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2015-10-01T07:00:00Z"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Mechanical & Aerospace Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Dissertation"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Doctor of Philosophy (PhD)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Analytical hierarchy process","Change dynamics","Monte Carlo simulation","Project management","Performance accountability","Project metrics","Large data sets","Management Sciences and Quantitative Methods","Mechanical Engineering"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights","label":"Dc Rights","values":["<p>In Copyright. URI: <a href=\"http://rightsstatements.org/vocab/InC/1.0/\">http://rightsstatements.org/vocab/InC/1.0/</a> This Item is protected by copyright and/or related rights. You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights-holder(s).</p>"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["9781339318790","https://digitalcommons.odu.edu/mae_etds/1"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This dissertation proposes a method that quantifies the dynamics caused by disruptions due to multiple changes that can occur during the progression of a large scale project. To begin, equations consisting of multiple parallel event sequences are derived that define the relationship between individual process events and the final project completion time. Matrix notation and a precedence matrix concept are used in this derivation to produce equations that are best suited for computer programming applications. This relationship is the foundation upon which the equations are built to calculate the variation impact on each event of a large scale project. Pursuing this further, the Analytical Hierarchy Process is used to rank Contract, Quality and Uncontrollable Variation types to generate two multiplication factors. One factor accounts for the variation type, and the other captures the variation influence relative to each event. These factors are used to define and formulate the equations used to quantify the impact of variation on each project event. Matrix notation, binomial variables, and Hadamard operators are used in the formula to optimize the result’s applicability to large data sets required for large scale projects. In the final analysis, the impact equations are used in a Monte Carlo simulation to produce each impact probability. These impact probability results are helpful tools for managing cost and evaluating design options. The Monte Carlo results are also used to reinforce the proposed process by quantifying the impact of change and providing a measurable metric for performance accountability. Examples and illustrations are used in each derivation to better convey the proposed concepts and application."]},{"key":"dc:title","label":"Title","values":["Dynamic Project Time and Cost Evaluation Under the Combined Influence of Contract, Quality, and Uncontrollable Change"]}]}],"canonical_facts":{"dc:contributor":["Han P. Bao","Gene J. -W. Hou","Duc T. Nguyen"],"dc:creator":["Hammock, Thomas V."],"dc:date.available":["2016-01-11T08:00:00Z"],"dc:date.created":["2015-10-01T07:00:00Z"],"dc:description.abstract":["This dissertation proposes a method that quantifies the dynamics caused by disruptions due to multiple changes that can occur during the progression of a large scale project. To begin, equations consisting of multiple parallel event sequences are derived that define the relationship between individual process events and the final project completion time. Matrix notation and a precedence matrix concept are used in this derivation to produce equations that are best suited for computer programming applications. This relationship is the foundation upon which the equations are built to calculate the variation impact on each event of a large scale project. Pursuing this further, the Analytical Hierarchy Process is used to rank Contract, Quality and Uncontrollable Variation types to generate two multiplication factors. One factor accounts for the variation type, and the other captures the variation influence relative to each event. These factors are used to define and formulate the equations used to quantify the impact of variation on each project event. Matrix notation, binomial variables, and Hadamard operators are used in the formula to optimize the result’s applicability to large data sets required for large scale projects. In the final analysis, the impact equations are used in a Monte Carlo simulation to produce each impact probability. These impact probability results are helpful tools for managing cost and evaluating design options. The Monte Carlo results are also used to reinforce the proposed process by quantifying the impact of change and providing a measurable metric for performance accountability. Examples and illustrations are used in each derivation to better convey the proposed concepts and application."],"dc:identifier":["9781339318790","https://digitalcommons.odu.edu/mae_etds/1"],"dc:rights":["<p>In Copyright. URI: <a href=\"http://rightsstatements.org/vocab/InC/1.0/\">http://rightsstatements.org/vocab/InC/1.0/</a> This Item is protected by copyright and/or related rights. You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights-holder(s).</p>"],"dc:subject":["Analytical hierarchy process","Change dynamics","Monte Carlo simulation","Project management","Performance accountability","Project metrics","Large data sets","Management Sciences and Quantitative Methods","Mechanical Engineering"],"dc:title":["Dynamic Project Time and Cost Evaluation Under the Combined Influence of Contract, Quality, and Uncontrollable Change"],"thesis:degree_discipline":["Mechanical & Aerospace Engineering"],"thesis:degree_level":["Dissertation"],"thesis:degree_name":["Doctor of Philosophy (PhD)"]},"updated_at":"2026-11-27T04:10:24Z"}