Multi-Mode Resource Constrained Project Scheduling Using Differential Evolution Algorithm

Abstract

dc:description.abstract

Project scheduling is a tool that manages the work and resources associated with delivering a project on time. Project scheduling is important to organize, keep track of the finished and in-progress tasks and manage the quality of work delivered. However, many problems arise during project scheduling. Minimizing project duration is the primary objective. Project cost is also a critical matter, but there will always be a trade off between project time and cost (Ghoddousiet et al., 2013), so scheduling activities can be challenging due to precedence activities, resources, and execution modes. Schedule reduction is heavily dependent on the availability of resources (Zhuo et al., 2013). There have been several methods used to solve the project scheduling problem. This dissertation will focus on finding the optimal solution with minimum makespan at lowest possible cost. Schedules should help manage the project and not give a general estimate of the project duration. It is important to have realistic time estimates and resources to give accurate schedules. Generally, project scheduling problems are challenging from a computational point of view (Brucker et al., 1999). This dissertation applies the differential evolution algorithm (DEA) to multi mode, multi resource constrained project scheduling problems. DEA was applied to a common 14- task network through different scenarios, which includes Multi Mode Single Non Renewable Resource Constrained Project Scheduling Problem (MMSNR) and Multi Mode Multiple Non Renewable Resource Constrained Project Scheduling Problem (MMMNR). DEA was also applied when each scenario was faced with a weekly constraint and when cost and time contingencies such as budget drops or change in expected project completion times interfere with the initial project scheduling plan. A benchmark problem was also presented to compare the DEA results with other optimization techniques such as a genetic algorithm (GA), a particle swarm optimization (PSO) and ant colony optimization (ACO). The results indicated that our DEA performs at least as good as these techniques as far as the project time is concerned and outperforms them in computational times and success rates. Finally, a pareto frontier was investigated, resulting in optimal solutions for a multi objective problem focusing on the tradeoff of the constrained set of parameters.

Degree

thesis:*
Name thesis:degree_name
Doctor of Philosophy (PhD)
Level thesis:degree_level
Dissertation
Discipline thesis:degree_discipline
Mechanical & Aerospace Engineering

Author and committee

dc:creator, dc:contributor.*
Author dc:creator
  • Altarazi, Faisal Manour
Contributors dc:contributor
  • Han Bo
  • Rafael Landaeta
  • Xiaoyu Zhang

Subjects

dc:subject × 1

Rights

dc:rights
Statement dc:rights
  • <p>In Copyright. URI: <a href="http://rightsstatements.org/vocab/InC/1.0/">http://rightsstatements.org/vocab/InC/1.0/</a> This Item is protected by copyright and/or related rights. You are free to use this Item in any way that is permitted by the copyright and related rights legislation that applies to your use. For other uses you need to obtain permission from the rights-holder(s).</p>

Identifiers

dc:identifier.*
Identifier
9780355082333

Chain of custody

source
Harvested from
Old Dominion University
Base URL
digitalcommons.odu.edu/do/oai/
Last updated
2026-11-19
Source record
OAI-PMH GetRecord
citation

Altarazi, Faisal Manour. Multi-Mode Resource Constrained Project Scheduling Using Differential Evolution Algorithm. Dissertation thesis, https://digitalcommons.odu.edu/mae_etds/23