{"id":{"repo_id":"ohiolink","oai_identifier":"oai:etd.ohiolink.edu:case1055881325"},"canonical_url":"https://search.ndltd.org/etd/ohiolink/oai:etd.ohiolink.edu:case1055881325","repository":{"repo_id":"ohiolink","name":"OhioLINK","base_url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai"},"display":{"title":"Hierarchical workforce scheduling with limited substitution as well as full-time and part-time workforce mix","abstract":"We study single-shift workforce scheduling problems in which the operation requires seven days a week with m types of workers. Type-1 worker is the most qualified, type-2 worker the second most qualified, and so on. A higher qualified worker can only substitute for a less qualified worker in certain limited levels. The principal requirements in the research problem are: (1) at least δ ki workers of type k must be on duty on day i; (2) each worker must have two days off each week, and A weekends off in the B-week schedule horizon. The secondary requirements are: (1) a worker should get consecutive days off if this worker is on duty for two weekends in a row; (2) the workstretch should be kept between two and five. We consider alternative workforce policies. First, we introduce limited substitution to full-time workforce scheduling. Afterwards, we introduce two types of part-time workers called limited and unlimited part-timers. The workforce is made up of full-timers combined with either or both types of part-timers. The objective is to find the most economical workforce mix to satisfy requirements.","abstract_html":"We study single-shift workforce scheduling problems in which the operation requires seven days a week with m types of workers. Type-1 worker is the most qualified, type-2 worker the second most qualified, and so on. A higher qualified worker can only substitute for a less qualified worker in certain limited levels. The principal requirements in the research problem are: (1) at least δ ki workers of type k must be on duty on day i; (2) each worker must have two days off each week, and A weekends off in the B-week schedule horizon. The secondary requirements are: (1) a worker should get consecutive days off if this worker is on duty for two weekends in a row; (2) the workstretch should be kept between two and five. We consider alternative workforce policies. First, we introduce limited substitution to full-time workforce scheduling. Afterwards, we introduce two types of part-time workers called limited and unlimited part-timers. The workforce is made up of full-timers combined with either or both types of part-timers. The objective is to find the most economical workforce mix to satisfy requirements.","abstract_has_math":false,"creators":["Fuh, Du-Shean"],"institution":"Case Western Reserve University School of Graduate Studies","degree_name":"Doctor of Philosophy","degree_level":"doctoral","degree_discipline":"Operations Research","degree_department":null,"school":null,"contributors":[],"advisors":["Emmons, Hamilton"],"committee_chairs":[],"committee_members":[],"year":1991,"date_issued":"1991","date_published":"1991","updated_at":"2026-11-27T04:14:08Z","subjects":["Operations Research","hierarchical workforce scheduling limited substitution full-time part-time workforce mix"],"languages":["English"],"rights":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://rave.ohiolink.edu/etdc/view?acc_num=case1055881325","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"http://rave.ohiolink.edu/etdc/view?acc_num=case1055881325","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aohiolink%3Aoai%3Aetd.ohiolink.edu%3Acase1055881325","prefix":"oai_dc"},"source_record":{"url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aetd.ohiolink.edu%3Acase1055881325","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Emmons, Hamilton"]},{"key":"dc:creator","label":"Author","values":["Fuh, Du-Shean"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1991"]},{"key":"dc:publisher","label":"Institution","values":["Case Western Reserve University School of Graduate Studies / OhioLINK"]},{"key":"dc:type","label":"Dc Type","values":["Electronic Thesis or Dissertation"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["doctoral"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Doctor of Philosophy"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Case Western Reserve University School of Graduate Studies"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Operations Research","hierarchical workforce scheduling limited substitution full-time part-time workforce mix"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:rights","label":"Dc Rights","values":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://rave.ohiolink.edu/etdc/view?acc_num=case1055881325"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["We study single-shift workforce scheduling problems in which the operation requires seven days a week with m types of workers. Type-1 worker is the most qualified, type-2 worker the second most qualified, and so on. A higher qualified worker can only substitute for a less qualified worker in certain limited levels. The principal requirements in the research problem are: (1) at least δ ki workers of type k must be on duty on day i; (2) each worker must have two days off each week, and A weekends off in the B-week schedule horizon. The secondary requirements are: (1) a worker should get consecutive days off if this worker is on duty for two weekends in a row; (2) the workstretch should be kept between two and five. We consider alternative workforce policies. First, we introduce limited substitution to full-time workforce scheduling. Afterwards, we introduce two types of part-time workers called limited and unlimited part-timers. The workforce is made up of full-timers combined with either or both types of part-timers. The objective is to find the most economical workforce mix to satisfy requirements."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf","p.282","5.2 MB"]},{"key":"dc:title","label":"Title","values":["Hierarchical workforce scheduling with limited substitution as well as full-time and part-time workforce mix"]}]}],"canonical_facts":{"dc:contributor.advisor":["Emmons, Hamilton"],"dc:creator":["Fuh, Du-Shean"],"dc:date":["1991"],"dc:description":["We study single-shift workforce scheduling problems in which the operation requires seven days a week with m types of workers. Type-1 worker is the most qualified, type-2 worker the second most qualified, and so on. A higher qualified worker can only substitute for a less qualified worker in certain limited levels. The principal requirements in the research problem are: (1) at least δ ki workers of type k must be on duty on day i; (2) each worker must have two days off each week, and A weekends off in the B-week schedule horizon. The secondary requirements are: (1) a worker should get consecutive days off if this worker is on duty for two weekends in a row; (2) the workstretch should be kept between two and five. We consider alternative workforce policies. First, we introduce limited substitution to full-time workforce scheduling. Afterwards, we introduce two types of part-time workers called limited and unlimited part-timers. The workforce is made up of full-timers combined with either or both types of part-timers. The objective is to find the most economical workforce mix to satisfy requirements."],"dc:format":["application/pdf","p.282","5.2 MB"],"dc:identifier":["http://rave.ohiolink.edu/etdc/view?acc_num=case1055881325"],"dc:language":["English"],"dc:publisher":["Case Western Reserve University School of Graduate Studies / OhioLINK"],"dc:rights":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"dc:subject":["Operations Research","hierarchical workforce scheduling limited substitution full-time part-time workforce mix"],"dc:title":["Hierarchical workforce scheduling with limited substitution as well as full-time and part-time workforce mix"],"dc:type":["Electronic Thesis or Dissertation"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["doctoral"],"thesis:degree_name":["Doctor of Philosophy"],"thesis:institution_name":["Case Western Reserve University School of Graduate Studies"]},"updated_at":"2026-11-27T04:14:08Z"}