{"id":{"repo_id":"ohiolink","oai_identifier":"oai:etd.ohiolink.edu:case1057678953"},"canonical_url":"https://search.ndltd.org/etd/ohiolink/oai:etd.ohiolink.edu:case1057678953","repository":{"repo_id":"ohiolink","name":"OhioLINK","base_url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai"},"display":{"title":"On interval scheduling problems: A contribution","abstract":"In the theory of Scheduling we often encounter the situation where independent tasks have fixed start and end times. This variation of the general theme is called the Interval Scheduling Problem and we consider it in the parallel resource environment. However, we do admit the possibility that a resource is not able to process certain tasks because of their size or other special characteristic. Furthermore, we analyze situations where a resource may not be available at all times or where a bound is imposed on its total operating time. The two optimization criteria we focus on are the maximization of the number of completed tasks; and, when weights are associated with tasks, the schedule of a subset of tasks with maximum total weight. Our study of IS problems is threefold. We start with the analysis of the situation where all machines are assumed identical. In this case, we develop polynomial time algorithms when no machines' availability constraints are imposed. Next, we study the complexity of the problem where each machine has a fixed interval of operation (a shift), and solve the problem efficiently when job preemption is authorized. Also, when a bound is required on the operating time of any machine, we prove the problem intractable in general and provide polynomial solutions for some preemptive versions. The second part of this study addresses the situation where machines are no longer identical but where a special structure, namely a hierarchical assignment of machines to jobs, is investigated. For this case, computational complexity issues are examined and polynomial solutions are offered when jobs preemption is allowed. The final phase of this thesis is devoted to the study of IS problems when any job-machine mapping is considered. We show that even for restricted instances, this type of IS problems remains intractable. However, heuristics and/or integer programming formulations are proposed.","abstract_html":"In the theory of Scheduling we often encounter the situation where independent tasks have fixed start and end times. This variation of the general theme is called the Interval Scheduling Problem and we consider it in the parallel resource environment. However, we do admit the possibility that a resource is not able to process certain tasks because of their size or other special characteristic. Furthermore, we analyze situations where a resource may not be available at all times or where a bound is imposed on its total operating time. The two optimization criteria we focus on are the maximization of the number of completed tasks; and, when weights are associated with tasks, the schedule of a subset of tasks with maximum total weight. Our study of IS problems is threefold. We start with the analysis of the situation where all machines are assumed identical. In this case, we develop polynomial time algorithms when no machines&#x27; availability constraints are imposed. Next, we study the complexity of the problem where each machine has a fixed interval of operation (a shift), and solve the problem efficiently when job preemption is authorized. Also, when a bound is required on the operating time of any machine, we prove the problem intractable in general and provide polynomial solutions for some preemptive versions. The second part of this study addresses the situation where machines are no longer identical but where a special structure, namely a hierarchical assignment of machines to jobs, is investigated. For this case, computational complexity issues are examined and polynomial solutions are offered when jobs preemption is allowed. The final phase of this thesis is devoted to the study of IS problems when any job-machine mapping is considered. We show that even for restricted instances, this type of IS problems remains intractable. However, heuristics and/or integer programming formulations are proposed.","abstract_has_math":false,"creators":["Bouzina, Khalid Ibn El Walid"],"institution":"Case Western Reserve University School of Graduate Studies","degree_name":"Doctor of Philosophy","degree_level":"doctoral","degree_discipline":"Operations Research","degree_department":null,"school":null,"contributors":[],"advisors":["Emmons, Hamilton"],"committee_chairs":[],"committee_members":[],"year":1994,"date_issued":"1994","date_published":"1994","updated_at":"2026-11-27T04:14:13Z","subjects":["Operations Research","interval scheduling problems"],"languages":["English"],"rights":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://rave.ohiolink.edu/etdc/view?acc_num=case1057678953","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"http://rave.ohiolink.edu/etdc/view?acc_num=case1057678953","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aohiolink%3Aoai%3Aetd.ohiolink.edu%3Acase1057678953","prefix":"oai_dc"},"source_record":{"url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aetd.ohiolink.edu%3Acase1057678953","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Emmons, Hamilton"]},{"key":"dc:creator","label":"Author","values":["Bouzina, Khalid Ibn El Walid"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1994"]},{"key":"dc:publisher","label":"Institution","values":["Case Western Reserve University School of Graduate Studies / OhioLINK"]},{"key":"dc:type","label":"Dc Type","values":["Electronic Thesis or Dissertation"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Operations Research"]},{"key":"thesis:degree_level","label":"Degree Level","values":["doctoral"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Doctor of Philosophy"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Case Western Reserve University School of Graduate Studies"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Operations Research","interval scheduling problems"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:rights","label":"Dc Rights","values":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://rave.ohiolink.edu/etdc/view?acc_num=case1057678953"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["In the theory of Scheduling we often encounter the situation where independent tasks have fixed start and end times. This variation of the general theme is called the Interval Scheduling Problem and we consider it in the parallel resource environment. However, we do admit the possibility that a resource is not able to process certain tasks because of their size or other special characteristic. Furthermore, we analyze situations where a resource may not be available at all times or where a bound is imposed on its total operating time. The two optimization criteria we focus on are the maximization of the number of completed tasks; and, when weights are associated with tasks, the schedule of a subset of tasks with maximum total weight. Our study of IS problems is threefold. We start with the analysis of the situation where all machines are assumed identical. In this case, we develop polynomial time algorithms when no machines' availability constraints are imposed. Next, we study the complexity of the problem where each machine has a fixed interval of operation (a shift), and solve the problem efficiently when job preemption is authorized. Also, when a bound is required on the operating time of any machine, we prove the problem intractable in general and provide polynomial solutions for some preemptive versions. The second part of this study addresses the situation where machines are no longer identical but where a special structure, namely a hierarchical assignment of machines to jobs, is investigated. For this case, computational complexity issues are examined and polynomial solutions are offered when jobs preemption is allowed. The final phase of this thesis is devoted to the study of IS problems when any job-machine mapping is considered. We show that even for restricted instances, this type of IS problems remains intractable. However, heuristics and/or integer programming formulations are proposed."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf","p.261","6.38 MB"]},{"key":"dc:title","label":"Title","values":["On interval scheduling problems: A contribution"]}]}],"canonical_facts":{"dc:contributor.advisor":["Emmons, Hamilton"],"dc:creator":["Bouzina, Khalid Ibn El Walid"],"dc:date":["1994"],"dc:description":["In the theory of Scheduling we often encounter the situation where independent tasks have fixed start and end times. This variation of the general theme is called the Interval Scheduling Problem and we consider it in the parallel resource environment. However, we do admit the possibility that a resource is not able to process certain tasks because of their size or other special characteristic. Furthermore, we analyze situations where a resource may not be available at all times or where a bound is imposed on its total operating time. The two optimization criteria we focus on are the maximization of the number of completed tasks; and, when weights are associated with tasks, the schedule of a subset of tasks with maximum total weight. Our study of IS problems is threefold. We start with the analysis of the situation where all machines are assumed identical. In this case, we develop polynomial time algorithms when no machines' availability constraints are imposed. Next, we study the complexity of the problem where each machine has a fixed interval of operation (a shift), and solve the problem efficiently when job preemption is authorized. Also, when a bound is required on the operating time of any machine, we prove the problem intractable in general and provide polynomial solutions for some preemptive versions. The second part of this study addresses the situation where machines are no longer identical but where a special structure, namely a hierarchical assignment of machines to jobs, is investigated. For this case, computational complexity issues are examined and polynomial solutions are offered when jobs preemption is allowed. The final phase of this thesis is devoted to the study of IS problems when any job-machine mapping is considered. We show that even for restricted instances, this type of IS problems remains intractable. However, heuristics and/or integer programming formulations are proposed."],"dc:format":["application/pdf","p.261","6.38 MB"],"dc:identifier":["http://rave.ohiolink.edu/etdc/view?acc_num=case1057678953"],"dc:language":["English"],"dc:publisher":["Case Western Reserve University School of Graduate Studies / OhioLINK"],"dc:rights":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"dc:subject":["Operations Research","interval scheduling problems"],"dc:title":["On interval scheduling problems: A contribution"],"dc:type":["Electronic Thesis or Dissertation"],"thesis:degree_discipline":["Operations Research"],"thesis:degree_level":["doctoral"],"thesis:degree_name":["Doctor of Philosophy"],"thesis:institution_name":["Case Western Reserve University School of Graduate Studies"]},"updated_at":"2026-11-27T04:14:13Z"}