{"id":{"repo_id":"ohiolink","oai_identifier":"oai:etd.ohiolink.edu:case1059670483"},"canonical_url":"https://search.ndltd.org/etd/ohiolink/oai:etd.ohiolink.edu:case1059670483","repository":{"repo_id":"ohiolink","name":"OhioLINK","base_url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai"},"display":{"title":"A multiattribute approach to general flowshop problems","abstract":"This dissertation is concerned with a new modeling and solution for the general flowshop problems. This class of problems covers 20 percent of the scheduling problems in industry, and is considered as a subclass of job shop problems. The problems are combinatorial in nature and NP-complete. The new modeling is applied to a special type of general flowshop problem, whose objective function is makespan. The main contribution of the method is going to be develop a new formulation by use of multiattribute alternative ranking. The essence of the new approach is to consider the priority of the jobs in a permutation schedule as the order of a set of ranked alternatives. The jobs are distinguished by their individual characteristics such as processing times. The most preferred job is assigned the highest rank as determined by the corresponding multiattribute value (MAV) function. The other jobs are, then, ranked according to their descending MAV function values. To articulate the decision making process, it is supposed that the decision maker (DM), who is knowledgeable in scheduling theory, seeks for a desired ranking of the jobs so as to obtain the optimal solution with respect to a certain objective. The scheduling theory ma y thus be considered as a decision aid tool to help the DM to approach the desired goal. In fact the DM's desire is expressed in terms of some mathematically based decision rules. The rules helps to define and derive some unidimensional value functions for the machines, thus yielding a MAV function for the problem at hand. The new approach has made it necessary to develop a proper scheduling theory. The theoretical requirements for the general makespan flowshop problem have been provided. The transitivity property of multiattribute alternative ranking and the relations existing between machine idle times and the processing times help to reduce the dimensionality of the problem. Finally, a heuristic method has been developed, and compared to five well-known existing efficient algorithms. The performance of the respective algorithms has been studied for small, medium and large problems under different generalities and unbalanced load. The results indicate that the new procedure is generally superior to the algorithms, especially for medium and large problems","abstract_html":"This dissertation is concerned with a new modeling and solution for the general flowshop problems. This class of problems covers 20 percent of the scheduling problems in industry, and is considered as a subclass of job shop problems. The problems are combinatorial in nature and NP-complete. The new modeling is applied to a special type of general flowshop problem, whose objective function is makespan. The main contribution of the method is going to be develop a new formulation by use of multiattribute alternative ranking. The essence of the new approach is to consider the priority of the jobs in a permutation schedule as the order of a set of ranked alternatives. The jobs are distinguished by their individual characteristics such as processing times. The most preferred job is assigned the highest rank as determined by the corresponding multiattribute value (MAV) function. The other jobs are, then, ranked according to their descending MAV function values. To articulate the decision making process, it is supposed that the decision maker (DM), who is knowledgeable in scheduling theory, seeks for a desired ranking of the jobs so as to obtain the optimal solution with respect to a certain objective. The scheduling theory ma y thus be considered as a decision aid tool to help the DM to approach the desired goal. In fact the DM&#x27;s desire is expressed in terms of some mathematically based decision rules. The rules helps to define and derive some unidimensional value functions for the machines, thus yielding a MAV function for the problem at hand. The new approach has made it necessary to develop a proper scheduling theory. The theoretical requirements for the general makespan flowshop problem have been provided. The transitivity property of multiattribute alternative ranking and the relations existing between machine idle times and the processing times help to reduce the dimensionality of the problem. Finally, a heuristic method has been developed, and compared to five well-known existing efficient algorithms. The performance of the respective algorithms has been studied for small, medium and large problems under different generalities and unbalanced load. The results indicate that the new procedure is generally superior to the algorithms, especially for medium and large problems","abstract_has_math":false,"creators":["Ramazani Khorshid-Doust, Reza"],"institution":"Case Western Reserve University School of Graduate Studies","degree_name":"Doctor of Philosophy","degree_level":"doctoral","degree_discipline":"Systems and Control Engineering","degree_department":null,"school":null,"contributors":[],"advisors":["Duckstein, Lucien"],"committee_chairs":[],"committee_members":[],"year":1991,"date_issued":"1991","date_published":"1991","updated_at":"2026-11-27T04:14:19Z","subjects":["Operations Research","Flowshop, industry","Multiattribute approach"],"languages":["English"],"rights":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://rave.ohiolink.edu/etdc/view?acc_num=case1059670483","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"http://rave.ohiolink.edu/etdc/view?acc_num=case1059670483","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aohiolink%3Aoai%3Aetd.ohiolink.edu%3Acase1059670483","prefix":"oai_dc"},"source_record":{"url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aetd.ohiolink.edu%3Acase1059670483","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Duckstein, Lucien"]},{"key":"dc:creator","label":"Author","values":["Ramazani Khorshid-Doust, Reza"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1991"]},{"key":"dc:publisher","label":"Institution","values":["Case Western Reserve University School of Graduate Studies / OhioLINK"]},{"key":"dc:type","label":"Dc Type","values":["Electronic Thesis or Dissertation"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Systems and Control Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["doctoral"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Doctor of Philosophy"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Case Western Reserve University School of Graduate Studies"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Operations Research","Flowshop, industry","Multiattribute approach"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:rights","label":"Dc Rights","values":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://rave.ohiolink.edu/etdc/view?acc_num=case1059670483"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["This dissertation is concerned with a new modeling and solution for the general flowshop problems. This class of problems covers 20 percent of the scheduling problems in industry, and is considered as a subclass of job shop problems. The problems are combinatorial in nature and NP-complete. The new modeling is applied to a special type of general flowshop problem, whose objective function is makespan. The main contribution of the method is going to be develop a new formulation by use of multiattribute alternative ranking. The essence of the new approach is to consider the priority of the jobs in a permutation schedule as the order of a set of ranked alternatives. The jobs are distinguished by their individual characteristics such as processing times. The most preferred job is assigned the highest rank as determined by the corresponding multiattribute value (MAV) function. The other jobs are, then, ranked according to their descending MAV function values. To articulate the decision making process, it is supposed that the decision maker (DM), who is knowledgeable in scheduling theory, seeks for a desired ranking of the jobs so as to obtain the optimal solution with respect to a certain objective. The scheduling theory ma y thus be considered as a decision aid tool to help the DM to approach the desired goal. In fact the DM's desire is expressed in terms of some mathematically based decision rules. The rules helps to define and derive some unidimensional value functions for the machines, thus yielding a MAV function for the problem at hand. The new approach has made it necessary to develop a proper scheduling theory. The theoretical requirements for the general makespan flowshop problem have been provided. The transitivity property of multiattribute alternative ranking and the relations existing between machine idle times and the processing times help to reduce the dimensionality of the problem. Finally, a heuristic method has been developed, and compared to five well-known existing efficient algorithms. The performance of the respective algorithms has been studied for small, medium and large problems under different generalities and unbalanced load. The results indicate that the new procedure is generally superior to the algorithms, especially for medium and large problems"]},{"key":"dc:format","label":"Dc Format","values":["application/pdf","p.183","3.93 MB"]},{"key":"dc:title","label":"Title","values":["A multiattribute approach to general flowshop problems"]}]}],"canonical_facts":{"dc:contributor.advisor":["Duckstein, Lucien"],"dc:creator":["Ramazani Khorshid-Doust, Reza"],"dc:date":["1991"],"dc:description":["This dissertation is concerned with a new modeling and solution for the general flowshop problems. This class of problems covers 20 percent of the scheduling problems in industry, and is considered as a subclass of job shop problems. The problems are combinatorial in nature and NP-complete. The new modeling is applied to a special type of general flowshop problem, whose objective function is makespan. The main contribution of the method is going to be develop a new formulation by use of multiattribute alternative ranking. The essence of the new approach is to consider the priority of the jobs in a permutation schedule as the order of a set of ranked alternatives. The jobs are distinguished by their individual characteristics such as processing times. The most preferred job is assigned the highest rank as determined by the corresponding multiattribute value (MAV) function. The other jobs are, then, ranked according to their descending MAV function values. To articulate the decision making process, it is supposed that the decision maker (DM), who is knowledgeable in scheduling theory, seeks for a desired ranking of the jobs so as to obtain the optimal solution with respect to a certain objective. The scheduling theory ma y thus be considered as a decision aid tool to help the DM to approach the desired goal. In fact the DM's desire is expressed in terms of some mathematically based decision rules. The rules helps to define and derive some unidimensional value functions for the machines, thus yielding a MAV function for the problem at hand. The new approach has made it necessary to develop a proper scheduling theory. The theoretical requirements for the general makespan flowshop problem have been provided. The transitivity property of multiattribute alternative ranking and the relations existing between machine idle times and the processing times help to reduce the dimensionality of the problem. Finally, a heuristic method has been developed, and compared to five well-known existing efficient algorithms. The performance of the respective algorithms has been studied for small, medium and large problems under different generalities and unbalanced load. The results indicate that the new procedure is generally superior to the algorithms, especially for medium and large problems"],"dc:format":["application/pdf","p.183","3.93 MB"],"dc:identifier":["http://rave.ohiolink.edu/etdc/view?acc_num=case1059670483"],"dc:language":["English"],"dc:publisher":["Case Western Reserve University School of Graduate Studies / OhioLINK"],"dc:rights":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"dc:subject":["Operations Research","Flowshop, industry","Multiattribute approach"],"dc:title":["A multiattribute approach to general flowshop problems"],"dc:type":["Electronic Thesis or Dissertation"],"thesis:degree_discipline":["Systems and Control Engineering"],"thesis:degree_level":["doctoral"],"thesis:degree_name":["Doctor of Philosophy"],"thesis:institution_name":["Case Western Reserve University School of Graduate Studies"]},"updated_at":"2026-11-27T04:14:19Z"}