{"id":{"repo_id":"ohiolink","oai_identifier":"oai:etd.ohiolink.edu:ohiou1182876167"},"canonical_url":"https://search.ndltd.org/etd/ohiolink/oai:etd.ohiolink.edu:ohiou1182876167","repository":{"repo_id":"ohiolink","name":"OhioLINK","base_url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai"},"display":{"title":"Structured analysis for the job shop promise date","abstract":"<p>This research is concerned with the problem of assigning due dates in a job shop. In particular, the objective is to evaluate various combinations of due date assignment rules including Reiter's method.</p> <p>The due date assignment rules are derivations or extensions of due date assignment rules found in job shop scheduling literature. The performance of the due date rules are measured in terms of mean makespan and six lateness and tardiness criteria where the expected capacity utilization was eighty nine percent.</p> <p>To implement this experiment, a simulation model based on sequence programming, a heuristic scheduling technique, was developed by using DESIGNAID, a structured analysis tool.</p>","abstract_html":"&lt;p&gt;This research is concerned with the problem of assigning due dates in a job shop. In particular, the objective is to evaluate various combinations of due date assignment rules including Reiter&#x27;s method.&lt;/p&gt; &lt;p&gt;The due date assignment rules are derivations or extensions of due date assignment rules found in job shop scheduling literature. The performance of the due date rules are measured in terms of mean makespan and six lateness and tardiness criteria where the expected capacity utilization was eighty nine percent.&lt;/p&gt; &lt;p&gt;To implement this experiment, a simulation model based on sequence programming, a heuristic scheduling technique, was developed by using DESIGNAID, a structured analysis tool.&lt;/p&gt;","abstract_has_math":false,"creators":["Yao, Jea-Sheng"],"institution":"Ohio University","degree_name":"Master of Science (MS)","degree_level":"masters","degree_discipline":"Industrial and Manufacturing Systems Engineering (Engineering)","degree_department":null,"school":null,"contributors":[],"advisors":["Scheck, Donald"],"committee_chairs":[],"committee_members":[],"year":1988,"date_issued":"1988","date_published":"1988","updated_at":"2026-11-27T04:18:31Z","subjects":["Engineering, Industrial","Reiter's Method","Due Date Assignment Rules","Job Shop Promise Date"],"languages":["English"],"rights":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1182876167","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1182876167","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aohiolink%3Aoai%3Aetd.ohiolink.edu%3Aohiou1182876167","prefix":"oai_dc"},"source_record":{"url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aetd.ohiolink.edu%3Aohiou1182876167","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Scheck, Donald"]},{"key":"dc:creator","label":"Author","values":["Yao, Jea-Sheng"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1988"]},{"key":"dc:publisher","label":"Institution","values":["Ohio University / OhioLINK"]},{"key":"dc:type","label":"Dc Type","values":["Electronic Thesis or Dissertation"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Industrial and Manufacturing Systems Engineering (Engineering)"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science (MS)"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["Ohio University"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Engineering, Industrial","Reiter's Method","Due Date Assignment Rules","Job Shop Promise Date"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:rights","label":"Dc Rights","values":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1182876167"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["<p>This research is concerned with the problem of assigning due dates in a job shop. In particular, the objective is to evaluate various combinations of due date assignment rules including Reiter's method.</p> <p>The due date assignment rules are derivations or extensions of due date assignment rules found in job shop scheduling literature. The performance of the due date rules are measured in terms of mean makespan and six lateness and tardiness criteria where the expected capacity utilization was eighty nine percent.</p> <p>To implement this experiment, a simulation model based on sequence programming, a heuristic scheduling technique, was developed by using DESIGNAID, a structured analysis tool.</p>"]},{"key":"dc:format","label":"Dc Format","values":["application/pdf","p.183","4.65 MB"]},{"key":"dc:title","label":"Title","values":["Structured analysis for the job shop promise date"]}]}],"canonical_facts":{"dc:contributor.advisor":["Scheck, Donald"],"dc:creator":["Yao, Jea-Sheng"],"dc:date":["1988"],"dc:description":["<p>This research is concerned with the problem of assigning due dates in a job shop. In particular, the objective is to evaluate various combinations of due date assignment rules including Reiter's method.</p> <p>The due date assignment rules are derivations or extensions of due date assignment rules found in job shop scheduling literature. The performance of the due date rules are measured in terms of mean makespan and six lateness and tardiness criteria where the expected capacity utilization was eighty nine percent.</p> <p>To implement this experiment, a simulation model based on sequence programming, a heuristic scheduling technique, was developed by using DESIGNAID, a structured analysis tool.</p>"],"dc:format":["application/pdf","p.183","4.65 MB"],"dc:identifier":["http://rave.ohiolink.edu/etdc/view?acc_num=ohiou1182876167"],"dc:language":["English"],"dc:publisher":["Ohio University / OhioLINK"],"dc:rights":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"dc:subject":["Engineering, Industrial","Reiter's Method","Due Date Assignment Rules","Job Shop Promise Date"],"dc:title":["Structured analysis for the job shop promise date"],"dc:type":["Electronic Thesis or Dissertation"],"thesis:degree_discipline":["Industrial and Manufacturing Systems Engineering (Engineering)"],"thesis:degree_level":["masters"],"thesis:degree_name":["Master of Science (MS)"],"thesis:institution_name":["Ohio University"]},"updated_at":"2026-11-27T04:18:31Z"}