{"id":{"repo_id":"ohiolink","oai_identifier":"oai:etd.ohiolink.edu:ucin1060893659"},"canonical_url":"https://search.ndltd.org/etd/ohiolink/oai:etd.ohiolink.edu:ucin1060893659","repository":{"repo_id":"ohiolink","name":"OhioLINK","base_url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai"},"display":{"title":"DYNAMIC RESOURCE BALANCING BETWEEN TWO COUPLED SIMULATIONS","abstract":"Coupled simulations form an important class of simulations that involve the concurrent execution of two (or more) different simulations. A bottleneck is created at synchronization points when one simulation has to wait idle for the other simulation. This scenario appears when the processors are statically distributed between the coupled simulations, not taking into consideration the dynamic change of the workload of each coupled simulations. As the difference between the workloads of the coupled simulation increases, the idle time also increases because the simulation with the larger workload spends more time in computation while the other simulation is waiting for synchronization. Dynamic resource balancing is the solution that we developed to overcome the problem of wasted idle time. We use the dynamic creation and deletion of processes provided by MPI-2 to rebalance the coupled simulation. Our results showed a reduction in waiting time and an improvement in the overall system performance.","abstract_html":"Coupled simulations form an important class of simulations that involve the concurrent execution of two (or more) different simulations. A bottleneck is created at synchronization points when one simulation has to wait idle for the other simulation. This scenario appears when the processors are statically distributed between the coupled simulations, not taking into consideration the dynamic change of the workload of each coupled simulations. As the difference between the workloads of the coupled simulation increases, the idle time also increases because the simulation with the larger workload spends more time in computation while the other simulation is waiting for synchronization. Dynamic resource balancing is the solution that we developed to overcome the problem of wasted idle time. We use the dynamic creation and deletion of processes provided by MPI-2 to rebalance the coupled simulation. Our results showed a reduction in waiting time and an improvement in the overall system performance.","abstract_has_math":false,"creators":["ABDEL-MOMEN, SHERIF SAMIR"],"institution":"University of Cincinnati","degree_name":"MS","degree_level":"masters","degree_discipline":"Engineering : Computer Engineering","degree_department":null,"school":null,"contributors":[],"advisors":["Tomko, Dr. Karen"],"committee_chairs":[],"committee_members":[],"year":2003,"date_issued":"2003-09-02","date_published":"2003-09-02","updated_at":"2026-11-27T04:36:52Z","subjects":["Computer Science","coupled simulation","load balancing","network of workstations","parallel simulations","process creation"],"languages":["English"],"rights":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://rave.ohiolink.edu/etdc/view?acc_num=ucin1060893659","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"http://rave.ohiolink.edu/etdc/view?acc_num=ucin1060893659","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aohiolink%3Aoai%3Aetd.ohiolink.edu%3Aucin1060893659","prefix":"oai_dc"},"source_record":{"url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aetd.ohiolink.edu%3Aucin1060893659","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Tomko, Dr. Karen"]},{"key":"dc:creator","label":"Author","values":["ABDEL-MOMEN, SHERIF SAMIR"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2003-09-02"]},{"key":"dc:publisher","label":"Institution","values":["University of Cincinnati / OhioLINK"]},{"key":"dc:type","label":"Dc Type","values":["Electronic Thesis or Dissertation"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Engineering : Computer Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["MS"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Cincinnati"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Computer Science","coupled simulation","load balancing","network of workstations","parallel simulations","process creation"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:rights","label":"Dc Rights","values":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://rave.ohiolink.edu/etdc/view?acc_num=ucin1060893659"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Coupled simulations form an important class of simulations that involve the concurrent execution of two (or more) different simulations. A bottleneck is created at synchronization points when one simulation has to wait idle for the other simulation. This scenario appears when the processors are statically distributed between the coupled simulations, not taking into consideration the dynamic change of the workload of each coupled simulations. As the difference between the workloads of the coupled simulation increases, the idle time also increases because the simulation with the larger workload spends more time in computation while the other simulation is waiting for synchronization. Dynamic resource balancing is the solution that we developed to overcome the problem of wasted idle time. We use the dynamic creation and deletion of processes provided by MPI-2 to rebalance the coupled simulation. Our results showed a reduction in waiting time and an improvement in the overall system performance."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf","p.44","173. KB"]},{"key":"dc:title","label":"Title","values":["DYNAMIC RESOURCE BALANCING BETWEEN TWO COUPLED SIMULATIONS"]}]}],"canonical_facts":{"dc:contributor.advisor":["Tomko, Dr. Karen"],"dc:creator":["ABDEL-MOMEN, SHERIF SAMIR"],"dc:date":["2003-09-02"],"dc:description":["Coupled simulations form an important class of simulations that involve the concurrent execution of two (or more) different simulations. A bottleneck is created at synchronization points when one simulation has to wait idle for the other simulation. This scenario appears when the processors are statically distributed between the coupled simulations, not taking into consideration the dynamic change of the workload of each coupled simulations. As the difference between the workloads of the coupled simulation increases, the idle time also increases because the simulation with the larger workload spends more time in computation while the other simulation is waiting for synchronization. Dynamic resource balancing is the solution that we developed to overcome the problem of wasted idle time. We use the dynamic creation and deletion of processes provided by MPI-2 to rebalance the coupled simulation. Our results showed a reduction in waiting time and an improvement in the overall system performance."],"dc:format":["application/pdf","p.44","173. KB"],"dc:identifier":["http://rave.ohiolink.edu/etdc/view?acc_num=ucin1060893659"],"dc:language":["English"],"dc:publisher":["University of Cincinnati / OhioLINK"],"dc:rights":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"dc:subject":["Computer Science","coupled simulation","load balancing","network of workstations","parallel simulations","process creation"],"dc:title":["DYNAMIC RESOURCE BALANCING BETWEEN TWO COUPLED SIMULATIONS"],"dc:type":["Electronic Thesis or Dissertation"],"thesis:degree_discipline":["Engineering : Computer Engineering"],"thesis:degree_level":["masters"],"thesis:degree_name":["MS"],"thesis:institution_name":["University of Cincinnati"]},"updated_at":"2026-11-27T04:36:52Z"}