{"id":{"repo_id":"ohiolink","oai_identifier":"oai:etd.ohiolink.edu:ucin1155814743"},"canonical_url":"https://search.ndltd.org/etd/ohiolink/oai:etd.ohiolink.edu:ucin1155814743","repository":{"repo_id":"ohiolink","name":"OhioLINK","base_url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai"},"display":{"title":"ACCELERATED CONSTRUCTION DECISION MAKING PROCESS","abstract":"The National Bridge Inventory shows that more than 480,000 bridges that serve the U.S highways are of a median age of more than 42 years and a design life of 50 years; out of which, approximately 14 and 16 percent of the bridge inventory falls into the functional and structural deficient categories, respectively. In a mature infrastructure system, upgrade, repair, or replacement requires either restriction or closure of those parts of the system. Traffic disruption during maintenance and construction activities frequently results in disruptions to local economies and communities; and raises issues of safety and congestion. The use of traditional technologies and techniques for infrastructure rehabilitation are not effective enough to mitigate these disruptive effects of rehabilitation work. A systems approach to accelerating infrastructure construction is required to mitigate the impact of the extensive rehabilitation activities that are likely to take place in immediate future. The decision making system proposed in this report uses Analytical Hierarchy Process and provides the decision maker with a tool to quantify the qualitative trade-offs between various objectives to extract a single set of weights which reflect the level of importance of each of the factors in the overall decision making process. This system will thus provide the decision makers an excellent and transparent tool to make decisions regarding choosing an optimal holistic strategy for decision making.","abstract_html":"The National Bridge Inventory shows that more than 480,000 bridges that serve the U.S highways are of a median age of more than 42 years and a design life of 50 years; out of which, approximately 14 and 16 percent of the bridge inventory falls into the functional and structural deficient categories, respectively. In a mature infrastructure system, upgrade, repair, or replacement requires either restriction or closure of those parts of the system. Traffic disruption during maintenance and construction activities frequently results in disruptions to local economies and communities; and raises issues of safety and congestion. The use of traditional technologies and techniques for infrastructure rehabilitation are not effective enough to mitigate these disruptive effects of rehabilitation work. A systems approach to accelerating infrastructure construction is required to mitigate the impact of the extensive rehabilitation activities that are likely to take place in immediate future. The decision making system proposed in this report uses Analytical Hierarchy Process and provides the decision maker with a tool to quantify the qualitative trade-offs between various objectives to extract a single set of weights which reflect the level of importance of each of the factors in the overall decision making process. This system will thus provide the decision makers an excellent and transparent tool to make decisions regarding choosing an optimal holistic strategy for decision making.","abstract_has_math":false,"creators":["ARURKAR, TEJAS PRAKASH"],"institution":"University of Cincinnati","degree_name":"MS","degree_level":"masters","degree_discipline":"Engineering : Civil Engineering","degree_department":null,"school":null,"contributors":[],"advisors":["SALEM, Dr. OSSAMA"],"committee_chairs":[],"committee_members":[],"year":2006,"date_issued":"2006-10-02","date_published":"2006-10-02","updated_at":"2026-11-27T04:37:07Z","subjects":["Acceleration","Pre-fabrication","Analytical Hierarchy Process"],"languages":["English"],"rights":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://rave.ohiolink.edu/etdc/view?acc_num=ucin1155814743","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"http://rave.ohiolink.edu/etdc/view?acc_num=ucin1155814743","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aohiolink%3Aoai%3Aetd.ohiolink.edu%3Aucin1155814743","prefix":"oai_dc"},"source_record":{"url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aetd.ohiolink.edu%3Aucin1155814743","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["SALEM, Dr. OSSAMA"]},{"key":"dc:creator","label":"Author","values":["ARURKAR, TEJAS PRAKASH"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2006-10-02"]},{"key":"dc:publisher","label":"Institution","values":["University of Cincinnati / OhioLINK"]},{"key":"dc:type","label":"Dc Type","values":["Electronic Thesis or Dissertation"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Engineering : Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["MS"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Cincinnati"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Acceleration","Pre-fabrication","Analytical Hierarchy Process"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:rights","label":"Dc Rights","values":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://rave.ohiolink.edu/etdc/view?acc_num=ucin1155814743"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["The National Bridge Inventory shows that more than 480,000 bridges that serve the U.S highways are of a median age of more than 42 years and a design life of 50 years; out of which, approximately 14 and 16 percent of the bridge inventory falls into the functional and structural deficient categories, respectively. In a mature infrastructure system, upgrade, repair, or replacement requires either restriction or closure of those parts of the system. Traffic disruption during maintenance and construction activities frequently results in disruptions to local economies and communities; and raises issues of safety and congestion. The use of traditional technologies and techniques for infrastructure rehabilitation are not effective enough to mitigate these disruptive effects of rehabilitation work. A systems approach to accelerating infrastructure construction is required to mitigate the impact of the extensive rehabilitation activities that are likely to take place in immediate future. The decision making system proposed in this report uses Analytical Hierarchy Process and provides the decision maker with a tool to quantify the qualitative trade-offs between various objectives to extract a single set of weights which reflect the level of importance of each of the factors in the overall decision making process. This system will thus provide the decision makers an excellent and transparent tool to make decisions regarding choosing an optimal holistic strategy for decision making."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf","p.129","876.6 KB"]},{"key":"dc:title","label":"Title","values":["ACCELERATED CONSTRUCTION DECISION MAKING PROCESS"]}]}],"canonical_facts":{"dc:contributor.advisor":["SALEM, Dr. OSSAMA"],"dc:creator":["ARURKAR, TEJAS PRAKASH"],"dc:date":["2006-10-02"],"dc:description":["The National Bridge Inventory shows that more than 480,000 bridges that serve the U.S highways are of a median age of more than 42 years and a design life of 50 years; out of which, approximately 14 and 16 percent of the bridge inventory falls into the functional and structural deficient categories, respectively. In a mature infrastructure system, upgrade, repair, or replacement requires either restriction or closure of those parts of the system. Traffic disruption during maintenance and construction activities frequently results in disruptions to local economies and communities; and raises issues of safety and congestion. The use of traditional technologies and techniques for infrastructure rehabilitation are not effective enough to mitigate these disruptive effects of rehabilitation work. A systems approach to accelerating infrastructure construction is required to mitigate the impact of the extensive rehabilitation activities that are likely to take place in immediate future. The decision making system proposed in this report uses Analytical Hierarchy Process and provides the decision maker with a tool to quantify the qualitative trade-offs between various objectives to extract a single set of weights which reflect the level of importance of each of the factors in the overall decision making process. This system will thus provide the decision makers an excellent and transparent tool to make decisions regarding choosing an optimal holistic strategy for decision making."],"dc:format":["application/pdf","p.129","876.6 KB"],"dc:identifier":["http://rave.ohiolink.edu/etdc/view?acc_num=ucin1155814743"],"dc:language":["English"],"dc:publisher":["University of Cincinnati / OhioLINK"],"dc:rights":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"dc:subject":["Acceleration","Pre-fabrication","Analytical Hierarchy Process"],"dc:title":["ACCELERATED CONSTRUCTION DECISION MAKING PROCESS"],"dc:type":["Electronic Thesis or Dissertation"],"thesis:degree_discipline":["Engineering : Civil Engineering"],"thesis:degree_level":["masters"],"thesis:degree_name":["MS"],"thesis:institution_name":["University of Cincinnati"]},"updated_at":"2026-11-27T04:37:07Z"}