{"id":{"repo_id":"ohiolink","oai_identifier":"oai:etd.ohiolink.edu:ucin1250191069"},"canonical_url":"https://search.ndltd.org/etd/ohiolink/oai:etd.ohiolink.edu:ucin1250191069","repository":{"repo_id":"ohiolink","name":"OhioLINK","base_url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai"},"display":{"title":"Public Participation: A Crucial Component in Solving Ohio’s Combined Sewer Overflow Problem","abstract":"<p>Despite the vast amount of research completed on combined sewer overflows, little research has been completed about the role of public participation in the CSO abatement process. Many books and articles have been completed discussing the proper engineering techniques to resolve CSO’s and the environmental effects of CSO’s but few discuss the relationship of CSO’s and public participation. The abatement of CSO’s spends taxpayer dollars, requires construction of public areas, and ultimately affects the waterways citizens of a city use. Therefore, shouldn’t public participation play a primary role in the CSO management process?</p><p>The United States Environmental Association requires all cities with a CSO to complete a long term control plan. This plan outlines nine minimum elements that must be met in order to comply with regulations. One of these nine minimum elements is public participation requiring all cities to implement civic engagement in CSO management. </p><p>The purpose of this study is to examine the role of public participation in resolving CSO’s in Ohio. This study examined two sets of information in order to analyze CSO’s in Ohio. First, this study analyzed the long term control plans of 54 cities in Ohio with CSO’s. The level of public participation for each city is determined allowing for an idea of the type of civic engagement being implemented by Ohio CSO cities. Second, overflow occurrence data for 26 cities was examined. This data displays the number of overflows for a period of time and its relationship to other variables such as level of public participation and city size. The study concludes by stating the level of public participation varies by city and, based on necessity, a city will implement a certain level of public participation. The study also emphasizes the importance of public participation in all cities despite the need of that city.</p>","abstract_html":"&lt;p&gt;Despite the vast amount of research completed on combined sewer overflows, little research has been completed about the role of public participation in the CSO abatement process. Many books and articles have been completed discussing the proper engineering techniques to resolve CSO’s and the environmental effects of CSO’s but few discuss the relationship of CSO’s and public participation. The abatement of CSO’s spends taxpayer dollars, requires construction of public areas, and ultimately affects the waterways citizens of a city use. Therefore, shouldn’t public participation play a primary role in the CSO management process?&lt;/p&gt;&lt;p&gt;The United States Environmental Association requires all cities with a CSO to complete a long term control plan. This plan outlines nine minimum elements that must be met in order to comply with regulations. One of these nine minimum elements is public participation requiring all cities to implement civic engagement in CSO management. &lt;/p&gt;&lt;p&gt;The purpose of this study is to examine the role of public participation in resolving CSO’s in Ohio. This study examined two sets of information in order to analyze CSO’s in Ohio. First, this study analyzed the long term control plans of 54 cities in Ohio with CSO’s. The level of public participation for each city is determined allowing for an idea of the type of civic engagement being implemented by Ohio CSO cities. Second, overflow occurrence data for 26 cities was examined. This data displays the number of overflows for a period of time and its relationship to other variables such as level of public participation and city size. The study concludes by stating the level of public participation varies by city and, based on necessity, a city will implement a certain level of public participation. The study also emphasizes the importance of public participation in all cities despite the need of that city.&lt;/p&gt;","abstract_has_math":false,"creators":["Schneider, Christopher"],"institution":"University of Cincinnati","degree_name":"MCP","degree_level":"masters","degree_discipline":"Design, Architecture, Art and Planning : Community Planning","degree_department":null,"school":null,"contributors":["Wang, Xinhao"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2009,"date_issued":"2009","date_published":"2009","updated_at":"2026-11-26T04:28:49Z","subjects":["Environmental Science","Public Health","Sanitation","Urban Planning","combined sewer overflow","public participation","CSO","long term control plan","LTCP"],"languages":["English"],"rights":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://rave.ohiolink.edu/etdc/view?acc_num=ucin1250191069","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"http://rave.ohiolink.edu/etdc/view?acc_num=ucin1250191069","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aohiolink%3Aoai%3Aetd.ohiolink.edu%3Aucin1250191069","prefix":"oai_dc"},"source_record":{"url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aetd.ohiolink.edu%3Aucin1250191069","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Wang, Xinhao"]},{"key":"dc:creator","label":"Author","values":["Schneider, Christopher"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2009"]},{"key":"dc:publisher","label":"Institution","values":["University of Cincinnati / OhioLINK"]},{"key":"dc:type","label":"Dc Type","values":["Electronic Thesis or Dissertation"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Design, Architecture, Art and Planning : Community Planning"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["MCP"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Cincinnati"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Environmental Science","Public Health","Sanitation","Urban Planning","combined sewer overflow","public participation","CSO","long term control plan","LTCP"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:rights","label":"Dc Rights","values":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://rave.ohiolink.edu/etdc/view?acc_num=ucin1250191069"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["<p>Despite the vast amount of research completed on combined sewer overflows, little research has been completed about the role of public participation in the CSO abatement process. Many books and articles have been completed discussing the proper engineering techniques to resolve CSO’s and the environmental effects of CSO’s but few discuss the relationship of CSO’s and public participation. The abatement of CSO’s spends taxpayer dollars, requires construction of public areas, and ultimately affects the waterways citizens of a city use. Therefore, shouldn’t public participation play a primary role in the CSO management process?</p><p>The United States Environmental Association requires all cities with a CSO to complete a long term control plan. This plan outlines nine minimum elements that must be met in order to comply with regulations. One of these nine minimum elements is public participation requiring all cities to implement civic engagement in CSO management. </p><p>The purpose of this study is to examine the role of public participation in resolving CSO’s in Ohio. This study examined two sets of information in order to analyze CSO’s in Ohio. First, this study analyzed the long term control plans of 54 cities in Ohio with CSO’s. The level of public participation for each city is determined allowing for an idea of the type of civic engagement being implemented by Ohio CSO cities. Second, overflow occurrence data for 26 cities was examined. This data displays the number of overflows for a period of time and its relationship to other variables such as level of public participation and city size. The study concludes by stating the level of public participation varies by city and, based on necessity, a city will implement a certain level of public participation. The study also emphasizes the importance of public participation in all cities despite the need of that city.</p>"]},{"key":"dc:format","label":"Dc Format","values":["application/pdf","p.111","2.29 MB"]},{"key":"dc:title","label":"Title","values":["Public Participation: A Crucial Component in Solving Ohio’s Combined Sewer Overflow Problem"]}]}],"canonical_facts":{"dc:contributor":["Wang, Xinhao"],"dc:creator":["Schneider, Christopher"],"dc:date":["2009"],"dc:description":["<p>Despite the vast amount of research completed on combined sewer overflows, little research has been completed about the role of public participation in the CSO abatement process. Many books and articles have been completed discussing the proper engineering techniques to resolve CSO’s and the environmental effects of CSO’s but few discuss the relationship of CSO’s and public participation. The abatement of CSO’s spends taxpayer dollars, requires construction of public areas, and ultimately affects the waterways citizens of a city use. Therefore, shouldn’t public participation play a primary role in the CSO management process?</p><p>The United States Environmental Association requires all cities with a CSO to complete a long term control plan. This plan outlines nine minimum elements that must be met in order to comply with regulations. One of these nine minimum elements is public participation requiring all cities to implement civic engagement in CSO management. </p><p>The purpose of this study is to examine the role of public participation in resolving CSO’s in Ohio. This study examined two sets of information in order to analyze CSO’s in Ohio. First, this study analyzed the long term control plans of 54 cities in Ohio with CSO’s. The level of public participation for each city is determined allowing for an idea of the type of civic engagement being implemented by Ohio CSO cities. Second, overflow occurrence data for 26 cities was examined. This data displays the number of overflows for a period of time and its relationship to other variables such as level of public participation and city size. The study concludes by stating the level of public participation varies by city and, based on necessity, a city will implement a certain level of public participation. The study also emphasizes the importance of public participation in all cities despite the need of that city.</p>"],"dc:format":["application/pdf","p.111","2.29 MB"],"dc:identifier":["http://rave.ohiolink.edu/etdc/view?acc_num=ucin1250191069"],"dc:language":["English"],"dc:publisher":["University of Cincinnati / OhioLINK"],"dc:rights":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"dc:subject":["Environmental Science","Public Health","Sanitation","Urban Planning","combined sewer overflow","public participation","CSO","long term control plan","LTCP"],"dc:title":["Public Participation: A Crucial Component in Solving Ohio’s Combined Sewer Overflow Problem"],"dc:type":["Electronic Thesis or Dissertation"],"thesis:degree_discipline":["Design, Architecture, Art and Planning : Community Planning"],"thesis:degree_level":["masters"],"thesis:degree_name":["MCP"],"thesis:institution_name":["University of Cincinnati"]},"updated_at":"2026-11-26T04:28:49Z"}