{"id":{"repo_id":"ohiolink","oai_identifier":"oai:etd.ohiolink.edu:ucin1428064925"},"canonical_url":"https://search.ndltd.org/etd/ohiolink/oai:etd.ohiolink.edu:ucin1428064925","repository":{"repo_id":"ohiolink","name":"OhioLINK","base_url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai"},"display":{"title":"Cincinnati Westside Busway","abstract":"The purpose of this thesis was to assess the complexity of a portion of Cincinnati, Ohio that is currently underserved by transit. This study outlines potential mode types that could be used to improve service, and then determines the best mode to be a busway.This study then looked to Pittsburgh, Pennsylvania as a case study. The Port Authority of Allegheny County built out their three busways at different times, experimenting in different ways to build and use a busway. Pittsburgh’s three busways serve as a guide for determining the necessary factors to use in determining a proper alignment.The thesis then used Pittsburgh’s example as a guide for determining the most suitable corridor for development. Population density, station placement, land acquisition and build-out costs were all used as factors in determining the most suitable alignment.The thesis finds the former Chesapeake & Ohio of Indiana corridor to be the most suitable for development due to its relative cost to build per potential ridership.","abstract_html":"The purpose of this thesis was to assess the complexity of a portion of Cincinnati, Ohio that is currently underserved by transit. This study outlines potential mode types that could be used to improve service, and then determines the best mode to be a busway.This study then looked to Pittsburgh, Pennsylvania as a case study. The Port Authority of Allegheny County built out their three busways at different times, experimenting in different ways to build and use a busway. Pittsburgh’s three busways serve as a guide for determining the necessary factors to use in determining a proper alignment.The thesis then used Pittsburgh’s example as a guide for determining the most suitable corridor for development. Population density, station placement, land acquisition and build-out costs were all used as factors in determining the most suitable alignment.The thesis finds the former Chesapeake &amp; Ohio of Indiana corridor to be the most suitable for development due to its relative cost to build per potential ridership.","abstract_has_math":false,"creators":["Knee, Andrew J."],"institution":"University of Cincinnati","degree_name":"MCP","degree_level":"masters","degree_discipline":"Design, Architecture, Art and Planning: Community Planning","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":["Palazzo, Danilo"],"committee_members":[],"year":2015,"date_issued":"2015-06-26","date_published":"2015-06-26","updated_at":"2026-11-27T04:40:14Z","subjects":["Urban Planning","Busway","Transit","Cincinnati","Pittsburgh","Westside","Mode"],"languages":["English"],"rights":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://rave.ohiolink.edu/etdc/view?acc_num=ucin1428064925","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"http://rave.ohiolink.edu/etdc/view?acc_num=ucin1428064925","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aohiolink%3Aoai%3Aetd.ohiolink.edu%3Aucin1428064925","prefix":"oai_dc"},"source_record":{"url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aetd.ohiolink.edu%3Aucin1428064925","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeechair","label":"Committee Chair","values":["Palazzo, Danilo"]},{"key":"dc:creator","label":"Author","values":["Knee, Andrew J."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2015-06-26"]},{"key":"dc:publisher","label":"Institution","values":["University of Cincinnati / OhioLINK"]},{"key":"dc:type","label":"Dc Type","values":["Electronic Thesis or Dissertation"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Design, Architecture, Art and Planning: Community Planning"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["MCP"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Cincinnati"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Urban Planning","Busway","Transit","Cincinnati","Pittsburgh","Westside","Mode"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:rights","label":"Dc Rights","values":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://rave.ohiolink.edu/etdc/view?acc_num=ucin1428064925"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["The purpose of this thesis was to assess the complexity of a portion of Cincinnati, Ohio that is currently underserved by transit. This study outlines potential mode types that could be used to improve service, and then determines the best mode to be a busway.This study then looked to Pittsburgh, Pennsylvania as a case study. The Port Authority of Allegheny County built out their three busways at different times, experimenting in different ways to build and use a busway. Pittsburgh’s three busways serve as a guide for determining the necessary factors to use in determining a proper alignment.The thesis then used Pittsburgh’s example as a guide for determining the most suitable corridor for development. Population density, station placement, land acquisition and build-out costs were all used as factors in determining the most suitable alignment.The thesis finds the former Chesapeake & Ohio of Indiana corridor to be the most suitable for development due to its relative cost to build per potential ridership."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf","p.56","26.77 MB"]},{"key":"dc:title","label":"Title","values":["Cincinnati Westside Busway"]}]}],"canonical_facts":{"dc:contributor.committeechair":["Palazzo, Danilo"],"dc:creator":["Knee, Andrew J."],"dc:date":["2015-06-26"],"dc:description":["The purpose of this thesis was to assess the complexity of a portion of Cincinnati, Ohio that is currently underserved by transit. This study outlines potential mode types that could be used to improve service, and then determines the best mode to be a busway.This study then looked to Pittsburgh, Pennsylvania as a case study. The Port Authority of Allegheny County built out their three busways at different times, experimenting in different ways to build and use a busway. Pittsburgh’s three busways serve as a guide for determining the necessary factors to use in determining a proper alignment.The thesis then used Pittsburgh’s example as a guide for determining the most suitable corridor for development. Population density, station placement, land acquisition and build-out costs were all used as factors in determining the most suitable alignment.The thesis finds the former Chesapeake & Ohio of Indiana corridor to be the most suitable for development due to its relative cost to build per potential ridership."],"dc:format":["application/pdf","p.56","26.77 MB"],"dc:identifier":["http://rave.ohiolink.edu/etdc/view?acc_num=ucin1428064925"],"dc:language":["English"],"dc:publisher":["University of Cincinnati / OhioLINK"],"dc:rights":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"dc:subject":["Urban Planning","Busway","Transit","Cincinnati","Pittsburgh","Westside","Mode"],"dc:title":["Cincinnati Westside Busway"],"dc:type":["Electronic Thesis or Dissertation"],"thesis:degree_discipline":["Design, Architecture, Art and Planning: Community Planning"],"thesis:degree_level":["masters"],"thesis:degree_name":["MCP"],"thesis:institution_name":["University of Cincinnati"]},"updated_at":"2026-11-27T04:40:14Z"}