{"id":{"repo_id":"ohiolink","oai_identifier":"oai:etd.ohiolink.edu:ucin974898094"},"canonical_url":"https://search.ndltd.org/etd/ohiolink/oai:etd.ohiolink.edu:ucin974898094","repository":{"repo_id":"ohiolink","name":"OhioLINK","base_url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai"},"display":{"title":"BALANCING OF INJECTOR ASSEMBLY LINE","abstract":"This study considers the problem posed in a continuous production environment when the demand reduced and the engineering team was challenged with the reduction of expense by way of reducing operator headcount. The objectives also state that the headcount need be reduced with minimal or no capital investment and that flexibility be provided for burst capacity in the future. This entails no hard automated solutions can be used for reducing manpower. This calls for studying the balancing principles, Lean Manufacturing techniques and identifying wastes as per a piece flow system. The production environment under consideration is an injector assembly line. The assembly line is a paced, synchronous, flow-line assembly system. The assembly line adopts a First In First Out (FIFO) order sequence with no batch built on the main line. With thorough understanding of the production environment, different forms of waste like overproduction, waiting and processing times and underutilization of machines were identified.This identification of the wastes was possible through understanding and literature reading of ‘what constitutes waste’. The wastes to be reduced once defined, required balancing principles of deciding the launching discipline, sequence, time studies and ergonomics. The production team needed to be reduced to a headcount of 65% of its number. Dependence of material availability, machine downtimes and operator morale are also considerations in the study. Two solutions presented offer to reduce the headcount on the production line with no capital investment and also keeping the flexibility for increased volumes.","abstract_html":"This study considers the problem posed in a continuous production environment when the demand reduced and the engineering team was challenged with the reduction of expense by way of reducing operator headcount. The objectives also state that the headcount need be reduced with minimal or no capital investment and that flexibility be provided for burst capacity in the future. This entails no hard automated solutions can be used for reducing manpower. This calls for studying the balancing principles, Lean Manufacturing techniques and identifying wastes as per a piece flow system. The production environment under consideration is an injector assembly line. The assembly line is a paced, synchronous, flow-line assembly system. The assembly line adopts a First In First Out (FIFO) order sequence with no batch built on the main line. With thorough understanding of the production environment, different forms of waste like overproduction, waiting and processing times and underutilization of machines were identified.This identification of the wastes was possible through understanding and literature reading of ‘what constitutes waste’. The wastes to be reduced once defined, required balancing principles of deciding the launching discipline, sequence, time studies and ergonomics. The production team needed to be reduced to a headcount of 65% of its number. Dependence of material availability, machine downtimes and operator morale are also considerations in the study. Two solutions presented offer to reduce the headcount on the production line with no capital investment and also keeping the flexibility for increased volumes.","abstract_has_math":false,"creators":["SOMAN, AMIT A."],"institution":"University of Cincinnati","degree_name":"MS","degree_level":"masters","degree_discipline":"Engineering : Mechanical Engineering","degree_department":null,"school":null,"contributors":[],"advisors":["Thompson, Dr. David"],"committee_chairs":[],"committee_members":[],"year":2000,"date_issued":"2000","date_published":"2000","updated_at":"2026-11-27T04:38:24Z","subjects":["Engineering, Mechanical","paced line","cost oriented goals","capacity reduction","lean manufacturing"],"languages":["English"],"rights":["restricted--full text not available online","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://rave.ohiolink.edu/etdc/view?acc_num=ucin974898094","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"http://rave.ohiolink.edu/etdc/view?acc_num=ucin974898094","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aohiolink%3Aoai%3Aetd.ohiolink.edu%3Aucin974898094","prefix":"oai_dc"},"source_record":{"url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aetd.ohiolink.edu%3Aucin974898094","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Thompson, Dr. David"]},{"key":"dc:creator","label":"Author","values":["SOMAN, AMIT A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2000"]},{"key":"dc:publisher","label":"Institution","values":["University of Cincinnati / OhioLINK"]},{"key":"dc:type","label":"Dc Type","values":["Electronic Thesis or Dissertation"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Engineering : Mechanical Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["MS"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Cincinnati"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Engineering, Mechanical","paced line","cost oriented goals","capacity reduction","lean manufacturing"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:rights","label":"Dc Rights","values":["restricted--full text not available online","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://rave.ohiolink.edu/etdc/view?acc_num=ucin974898094"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["This study considers the problem posed in a continuous production environment when the demand reduced and the engineering team was challenged with the reduction of expense by way of reducing operator headcount. The objectives also state that the headcount need be reduced with minimal or no capital investment and that flexibility be provided for burst capacity in the future. This entails no hard automated solutions can be used for reducing manpower. This calls for studying the balancing principles, Lean Manufacturing techniques and identifying wastes as per a piece flow system. The production environment under consideration is an injector assembly line. The assembly line is a paced, synchronous, flow-line assembly system. The assembly line adopts a First In First Out (FIFO) order sequence with no batch built on the main line. With thorough understanding of the production environment, different forms of waste like overproduction, waiting and processing times and underutilization of machines were identified.This identification of the wastes was possible through understanding and literature reading of ‘what constitutes waste’. The wastes to be reduced once defined, required balancing principles of deciding the launching discipline, sequence, time studies and ergonomics. The production team needed to be reduced to a headcount of 65% of its number. Dependence of material availability, machine downtimes and operator morale are also considerations in the study. Two solutions presented offer to reduce the headcount on the production line with no capital investment and also keeping the flexibility for increased volumes."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf","p.1"]},{"key":"dc:title","label":"Title","values":["BALANCING OF INJECTOR ASSEMBLY LINE"]}]}],"canonical_facts":{"dc:contributor.advisor":["Thompson, Dr. David"],"dc:creator":["SOMAN, AMIT A."],"dc:date":["2000"],"dc:description":["This study considers the problem posed in a continuous production environment when the demand reduced and the engineering team was challenged with the reduction of expense by way of reducing operator headcount. The objectives also state that the headcount need be reduced with minimal or no capital investment and that flexibility be provided for burst capacity in the future. This entails no hard automated solutions can be used for reducing manpower. This calls for studying the balancing principles, Lean Manufacturing techniques and identifying wastes as per a piece flow system. The production environment under consideration is an injector assembly line. The assembly line is a paced, synchronous, flow-line assembly system. The assembly line adopts a First In First Out (FIFO) order sequence with no batch built on the main line. With thorough understanding of the production environment, different forms of waste like overproduction, waiting and processing times and underutilization of machines were identified.This identification of the wastes was possible through understanding and literature reading of ‘what constitutes waste’. The wastes to be reduced once defined, required balancing principles of deciding the launching discipline, sequence, time studies and ergonomics. The production team needed to be reduced to a headcount of 65% of its number. Dependence of material availability, machine downtimes and operator morale are also considerations in the study. Two solutions presented offer to reduce the headcount on the production line with no capital investment and also keeping the flexibility for increased volumes."],"dc:format":["application/pdf","p.1"],"dc:identifier":["http://rave.ohiolink.edu/etdc/view?acc_num=ucin974898094"],"dc:language":["English"],"dc:publisher":["University of Cincinnati / OhioLINK"],"dc:rights":["restricted--full text not available online","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"dc:subject":["Engineering, Mechanical","paced line","cost oriented goals","capacity reduction","lean manufacturing"],"dc:title":["BALANCING OF INJECTOR ASSEMBLY LINE"],"dc:type":["Electronic Thesis or Dissertation"],"thesis:degree_discipline":["Engineering : Mechanical Engineering"],"thesis:degree_level":["masters"],"thesis:degree_name":["MS"],"thesis:institution_name":["University of Cincinnati"]},"updated_at":"2026-11-27T04:38:24Z"}