{"id":{"repo_id":"ohiolink","oai_identifier":"oai:etd.ohiolink.edu:ucin975507800"},"canonical_url":"https://search.ndltd.org/etd/ohiolink/oai:etd.ohiolink.edu:ucin975507800","repository":{"repo_id":"ohiolink","name":"OhioLINK","base_url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai"},"display":{"title":"A STUDY OF WORKLOAD SCHEDULING AND RESOURCE PLANNING AT AN OVERHAUL FACILITY","abstract":"This study analyzes the C-141 overhaul operations at Warner Robins Air Logistic Center (WR-ALC). The literature review covers overhaul operations,techniques for scheduling in a constrained resource environment, and techniques for simulation optimization. The body of the study compares traditional formula based methods for computing facility requirements and aircraft induction scheduling to integer linear programming and simulation heuristic approaches. The study objectives are twofold. First, a schedule that maximizes the release of excess hangar, ramp, and functional test facilities to WR-ALC for the pursuit other workload (the release schedule) is needed. These facilities must be available as quickly as possible. However, the release schedule must leave sufficient capacity to allow C-141 Production Division to meet its overhaul commitments. The second study must recommend an aircraft induction schedule that will enable the first objective (the induction schedule) to be achieved. At each step, the study analyzes the traditional formula approaches used to solve the problem, a mathematical programming approach, and a simulation approach to the problem. The schedules these three techniques generate are run through a simulation models and the key parameters of resource utilization and makespan are evaluated. Each technique is then evaluated against the trade-off criteria of speed, accuracy, and level of detail. The study finds that direct manipulation of the simulation model, i.e., the simulation approach, yields the most desirable results.","abstract_html":"This study analyzes the C-141 overhaul operations at Warner Robins Air Logistic Center (WR-ALC). The literature review covers overhaul operations,techniques for scheduling in a constrained resource environment, and techniques for simulation optimization. The body of the study compares traditional formula based methods for computing facility requirements and aircraft induction scheduling to integer linear programming and simulation heuristic approaches. The study objectives are twofold. First, a schedule that maximizes the release of excess hangar, ramp, and functional test facilities to WR-ALC for the pursuit other workload (the release schedule) is needed. These facilities must be available as quickly as possible. However, the release schedule must leave sufficient capacity to allow C-141 Production Division to meet its overhaul commitments. The second study must recommend an aircraft induction schedule that will enable the first objective (the induction schedule) to be achieved. At each step, the study analyzes the traditional formula approaches used to solve the problem, a mathematical programming approach, and a simulation approach to the problem. The schedules these three techniques generate are run through a simulation models and the key parameters of resource utilization and makespan are evaluated. Each technique is then evaluated against the trade-off criteria of speed, accuracy, and level of detail. The study finds that direct manipulation of the simulation model, i.e., the simulation approach, yields the most desirable results.","abstract_has_math":false,"creators":["BELL, RUBEN LIONEL"],"institution":"University of Cincinnati","degree_name":"MS","degree_level":"masters","degree_discipline":"Engineering : Industrial Engineering","degree_department":null,"school":null,"contributors":[],"advisors":["Shultes, Dr. Bruce"],"committee_chairs":[],"committee_members":[],"year":2000,"date_issued":"2000","date_published":"2000","updated_at":"2026-11-27T04:38:24Z","subjects":["Engineering, Industrial","overhaul","maintenance","project management","constrained resources","military depot"],"languages":["English"],"rights":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://rave.ohiolink.edu/etdc/view?acc_num=ucin975507800","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"http://rave.ohiolink.edu/etdc/view?acc_num=ucin975507800","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Aohiolink%3Aoai%3Aetd.ohiolink.edu%3Aucin975507800","prefix":"oai_dc"},"source_record":{"url":"https://etd.ohiolink.edu/acprod/odb_etd/ws/oai/oai?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aetd.ohiolink.edu%3Aucin975507800","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Shultes, Dr. Bruce"]},{"key":"dc:creator","label":"Author","values":["BELL, RUBEN LIONEL"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2000"]},{"key":"dc:publisher","label":"Institution","values":["University of Cincinnati / OhioLINK"]},{"key":"dc:type","label":"Dc Type","values":["Electronic Thesis or Dissertation"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Engineering : Industrial Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["MS"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Cincinnati"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Engineering, Industrial","overhaul","maintenance","project management","constrained resources","military depot"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:rights","label":"Dc Rights","values":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://rave.ohiolink.edu/etdc/view?acc_num=ucin975507800"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["This study analyzes the C-141 overhaul operations at Warner Robins Air Logistic Center (WR-ALC). The literature review covers overhaul operations,techniques for scheduling in a constrained resource environment, and techniques for simulation optimization. The body of the study compares traditional formula based methods for computing facility requirements and aircraft induction scheduling to integer linear programming and simulation heuristic approaches. The study objectives are twofold. First, a schedule that maximizes the release of excess hangar, ramp, and functional test facilities to WR-ALC for the pursuit other workload (the release schedule) is needed. These facilities must be available as quickly as possible. However, the release schedule must leave sufficient capacity to allow C-141 Production Division to meet its overhaul commitments. The second study must recommend an aircraft induction schedule that will enable the first objective (the induction schedule) to be achieved. At each step, the study analyzes the traditional formula approaches used to solve the problem, a mathematical programming approach, and a simulation approach to the problem. The schedules these three techniques generate are run through a simulation models and the key parameters of resource utilization and makespan are evaluated. Each technique is then evaluated against the trade-off criteria of speed, accuracy, and level of detail. The study finds that direct manipulation of the simulation model, i.e., the simulation approach, yields the most desirable results."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf","p.100","924.1 KB"]},{"key":"dc:title","label":"Title","values":["A STUDY OF WORKLOAD SCHEDULING AND RESOURCE PLANNING AT AN OVERHAUL FACILITY"]}]}],"canonical_facts":{"dc:contributor.advisor":["Shultes, Dr. Bruce"],"dc:creator":["BELL, RUBEN LIONEL"],"dc:date":["2000"],"dc:description":["This study analyzes the C-141 overhaul operations at Warner Robins Air Logistic Center (WR-ALC). The literature review covers overhaul operations,techniques for scheduling in a constrained resource environment, and techniques for simulation optimization. The body of the study compares traditional formula based methods for computing facility requirements and aircraft induction scheduling to integer linear programming and simulation heuristic approaches. The study objectives are twofold. First, a schedule that maximizes the release of excess hangar, ramp, and functional test facilities to WR-ALC for the pursuit other workload (the release schedule) is needed. These facilities must be available as quickly as possible. However, the release schedule must leave sufficient capacity to allow C-141 Production Division to meet its overhaul commitments. The second study must recommend an aircraft induction schedule that will enable the first objective (the induction schedule) to be achieved. At each step, the study analyzes the traditional formula approaches used to solve the problem, a mathematical programming approach, and a simulation approach to the problem. The schedules these three techniques generate are run through a simulation models and the key parameters of resource utilization and makespan are evaluated. Each technique is then evaluated against the trade-off criteria of speed, accuracy, and level of detail. The study finds that direct manipulation of the simulation model, i.e., the simulation approach, yields the most desirable results."],"dc:format":["application/pdf","p.100","924.1 KB"],"dc:identifier":["http://rave.ohiolink.edu/etdc/view?acc_num=ucin975507800"],"dc:language":["English"],"dc:publisher":["University of Cincinnati / OhioLINK"],"dc:rights":["unrestricted","This thesis or dissertation is protected by copyright: all rights reserved. It may not be copied or redistributed beyond the terms of applicable copyright laws."],"dc:subject":["Engineering, Industrial","overhaul","maintenance","project management","constrained resources","military depot"],"dc:title":["A STUDY OF WORKLOAD SCHEDULING AND RESOURCE PLANNING AT AN OVERHAUL FACILITY"],"dc:type":["Electronic Thesis or Dissertation"],"thesis:degree_discipline":["Engineering : Industrial Engineering"],"thesis:degree_level":["masters"],"thesis:degree_name":["MS"],"thesis:institution_name":["University of Cincinnati"]},"updated_at":"2026-11-27T04:38:24Z"}