{"id":{"repo_id":"pohang","oai_identifier":"oai:oasis.postech.ac.kr:2014.oak/2084"},"canonical_url":"https://search.ndltd.org/etd/pohang/oai:oasis.postech.ac.kr:2014.oak/2084","repository":{"repo_id":"pohang","name":"Pohang University of Science and Technology","base_url":"http://oasis.postech.ac.kr/oai/request"},"display":{"title":"EPC/턴키 프로젝트 리스크를 고려한 해외발전 플랜트 입찰프로세스 개선방안 연구","abstract":"With growing of mega-projects in overseas power plant construction industries which needs large scaled funding from the lender, EPC/Turnkey projects by the project financing method are increasing gradually. Project financed EPC/Turnkey projects are earning revenues from cash flow after the Works are taken-over to the Employer. Most of the risks associated with construction contract are allocated to the EPC/Turnkey Contractor in order to ensure the increased certainty of the final cost and the completion date.Major risk factors on the Condition of Contract for the EPC/Turnkey Project (FIDIC Silver Book) have to be identified by the Contractor and managed from the project planning stage which is most effective of the risk management activities and the tendering process to analysis and control of the major risks should be reconsidered accordingly. Based on some study in this report, the results of study and analysis summarized as follows.First, the major risk factors which are very unfavorable terms to the Contractor in the FIDIC Silver Book are studied and confirmed as","abstract_html":"With growing of mega-projects in overseas power plant construction industries which needs large scaled funding from the lender, EPC/Turnkey projects by the project financing method are increasing gradually. Project financed EPC/Turnkey projects are earning revenues from cash flow after the Works are taken-over to the Employer. Most of the risks associated with construction contract are allocated to the EPC/Turnkey Contractor in order to ensure the increased certainty of the final cost and the completion date.Major risk factors on the Condition of Contract for the EPC/Turnkey Project (FIDIC Silver Book) have to be identified by the Contractor and managed from the project planning stage which is most effective of the risk management activities and the tendering process to analysis and control of the major risks should be reconsidered accordingly. Based on some study in this report, the results of study and analysis summarized as follows.First, the major risk factors which are very unfavorable terms to the Contractor in the FIDIC Silver Book are studied and confirmed as","abstract_has_math":false,"creators":["이종우"],"institution":null,"degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2014,"date_issued":"2014","date_published":"2014","updated_at":"2026-11-26T04:05:43Z","subjects":[],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["hdl:2014.oak/2084"],"render_values":[{"text":"hdl:2014.oak/2084","href":null,"code":true}]},{"key":"mods:identifier.other","label":"Mods Identifier Other","values":["OAK-2014-01582"],"render_values":[{"text":"OAK-2014-01582","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"http://postech.dcollection.net/jsp/common/DcLoOrgPer.jsp?sItemId=000001674177","outbound_label":"Repository record","outbound_source":"mods:identifier.uri","record_url":"http://postech.dcollection.net/jsp/common/DcLoOrgPer.jsp?sItemId=000001674177","record_label":"Repository record","record_kind":"record","record_source":"mods:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Apohang%3Aoai%3Aoasis.postech.ac.kr%3A2014.oak%2F2084","prefix":"oai_dc"},"source_record":{"url":"http://oasis.postech.ac.kr/oai/request?verb=GetRecord&metadataPrefix=mets&identifier=oai%3Aoasis.postech.ac.kr%3A2014.oak%2F2084","prefix":"mets"},"metadata_groups":[{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.issued","label":"Date","values":["2014"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["hdl:2014.oak/2084"]},{"key":"mods:identifier.other","label":"Mods Identifier Other","values":["OAK-2014-01582"]},{"key":"mods:identifier.uri","label":"Mods Identifier URI","values":["http://postech.dcollection.net/jsp/common/DcLoOrgPer.jsp?sItemId=000001674177"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.other","label":"Dc Description Other","values":["With growing of mega-projects in overseas power plant construction industries which needs large scaled funding from the lender, EPC/Turnkey projects by the project financing method are increasing gradually. Project financed EPC/Turnkey projects are earning revenues from cash flow after the Works are taken-over to the Employer. Most of the risks associated with construction contract are allocated to the EPC/Turnkey Contractor in order to ensure the increased certainty of the final cost and the completion date.Major risk factors on the Condition of Contract for the EPC/Turnkey Project (FIDIC Silver Book) have to be identified by the Contractor and managed from the project planning stage which is most effective of the risk management activities and the tendering process to analysis and control of the major risks should be reconsidered accordingly. Based on some study in this report, the results of study and analysis summarized as follows.First, the major risk factors which are very unfavorable terms to the Contractor in the FIDIC Silver Book are studied and confirmed as"]},{"key":"dc:title","label":"Title","values":["EPC/턴키 프로젝트 리스크를 고려한 해외발전 플랜트 입찰프로세스 개선방안 연구"]},{"key":"mods:accesscondition.useandreproduction","label":"Mods Accesscondition Useandreproduction","values":["BY_NC_ND"]},{"key":"mods:dateaccessioned","label":"Mods Dateaccessioned","values":["2014-12-01T11:49:04Z"]},{"key":"mods:dateavailable","label":"Mods Dateavailable","values":["2014-12-01T11:49:04Z"]},{"key":"mods:namepart","label":"Mods Namepart","values":["이종우","일반대학원 엔지니어링특성화협동과정","포항공과대학교"]},{"key":"mods:roleterm.text","label":"Mods Roleterm Text","values":["author","college","department"]}]}],"canonical_facts":{"dc:date.issued":["2014"],"dc:description.other":["With growing of mega-projects in overseas power plant construction industries which needs large scaled funding from the lender, EPC/Turnkey projects by the project financing method are increasing gradually. Project financed EPC/Turnkey projects are earning revenues from cash flow after the Works are taken-over to the Employer. Most of the risks associated with construction contract are allocated to the EPC/Turnkey Contractor in order to ensure the increased certainty of the final cost and the completion date.Major risk factors on the Condition of Contract for the EPC/Turnkey Project (FIDIC Silver Book) have to be identified by the Contractor and managed from the project planning stage which is most effective of the risk management activities and the tendering process to analysis and control of the major risks should be reconsidered accordingly. Based on some study in this report, the results of study and analysis summarized as follows.First, the major risk factors which are very unfavorable terms to the Contractor in the FIDIC Silver Book are studied and confirmed as"],"dc:identifier":["hdl:2014.oak/2084"],"dc:title":["EPC/턴키 프로젝트 리스크를 고려한 해외발전 플랜트 입찰프로세스 개선방안 연구"],"dc:type":["Thesis"],"mods:accesscondition.useandreproduction":["BY_NC_ND"],"mods:dateaccessioned":["2014-12-01T11:49:04Z"],"mods:dateavailable":["2014-12-01T11:49:04Z"],"mods:identifier.other":["OAK-2014-01582"],"mods:identifier.uri":["http://postech.dcollection.net/jsp/common/DcLoOrgPer.jsp?sItemId=000001674177"],"mods:namepart":["이종우","일반대학원 엔지니어링특성화협동과정","포항공과대학교"],"mods:roleterm.text":["author","college","department"]},"updated_at":"2026-11-26T04:05:43Z"}