{"id":{"repo_id":"rit","oai_identifier":"oai:repository.rit.edu:theses-10484"},"canonical_url":"https://search.ndltd.org/etd/rit/oai:repository.rit.edu:theses-10484","repository":{"repo_id":"rit","name":"Rochester Institute of Technology","base_url":"https://repository.rit.edu/do/oai/"},"display":{"title":"Application of Project Management Methodology From Idea Generation to New Bundle Development in Personal Care Packaging Projects","abstract":"The purpose of this study was to conduct an analysis of the current packaging development process used by Colgate-Palmolive sub-country teams and to provide suggestions for implementing an improved process. The analysis of the current approach to packaging development and project management in the personal care business category was done using a shampoo packaging change case study. A new Stage-Gate approach, which used project management methodologies, was proposed for packaging development projects. Additionally, a series of project management template documents (such as project charter, scope of work, work breakdown structure, responsibility matrix, and project timeline) applicable to other packaging development projects were made available. It was determined that involving packaging engineers in projects in their early stages can maximize their input and reduce time to market and total costs for package development, as well as assure the integrity of the product and its packaging.","abstract_html":"The purpose of this study was to conduct an analysis of the current packaging development process used by Colgate-Palmolive sub-country teams and to provide suggestions for implementing an improved process. The analysis of the current approach to packaging development and project management in the personal care business category was done using a shampoo packaging change case study. A new Stage-Gate approach, which used project management methodologies, was proposed for packaging development projects. Additionally, a series of project management template documents (such as project charter, scope of work, work breakdown structure, responsibility matrix, and project timeline) applicable to other packaging development projects were made available. It was determined that involving packaging engineers in projects in their early stages can maximize their input and reduce time to market and total costs for package development, as well as assure the integrity of the product and its packaging.","abstract_has_math":false,"creators":["Bilir, Fikri"],"institution":null,"degree_name":"Packaging Science(MS)","degree_level":"Thesis","degree_discipline":"Packaging Science (CAST)","degree_department":null,"school":null,"contributors":["None provided"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T09:02:57Z","subjects":["None provided"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://repository.rit.edu/theses/9331","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://repository.rit.edu/theses/9331","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://repository.rit.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Arepository.rit.edu%3Atheses-10484","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["None provided"]},{"key":"dc:creator","label":"Author","values":["Bilir, Fikri"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.available","label":"Dc Date Available","values":["2016-12-22T08:00:00Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2008-01-01T08:00:00Z"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Packaging Science (CAST)"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Thesis"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Packaging Science(MS)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["None provided"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://repository.rit.edu/theses/9331"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this study was to conduct an analysis of the current packaging development process used by Colgate-Palmolive sub-country teams and to provide suggestions for implementing an improved process. The analysis of the current approach to packaging development and project management in the personal care business category was done using a shampoo packaging change case study. A new Stage-Gate approach, which used project management methodologies, was proposed for packaging development projects. Additionally, a series of project management template documents (such as project charter, scope of work, work breakdown structure, responsibility matrix, and project timeline) applicable to other packaging development projects were made available. It was determined that involving packaging engineers in projects in their early stages can maximize their input and reduce time to market and total costs for package development, as well as assure the integrity of the product and its packaging."]},{"key":"dc:description.note","label":"Dc Description Note","values":["<p>Physical copy available from RIT's Wallace Library at TS196 .B45 2008</p>"]},{"key":"dc:title","label":"Title","values":["Application of Project Management Methodology From Idea Generation to New Bundle Development in Personal Care Packaging Projects"]}]}],"canonical_facts":{"dc:contributor":["None provided"],"dc:creator":["Bilir, Fikri"],"dc:date.available":["2016-12-22T08:00:00Z"],"dc:date.created":["2008-01-01T08:00:00Z"],"dc:description.abstract":["The purpose of this study was to conduct an analysis of the current packaging development process used by Colgate-Palmolive sub-country teams and to provide suggestions for implementing an improved process. The analysis of the current approach to packaging development and project management in the personal care business category was done using a shampoo packaging change case study. A new Stage-Gate approach, which used project management methodologies, was proposed for packaging development projects. Additionally, a series of project management template documents (such as project charter, scope of work, work breakdown structure, responsibility matrix, and project timeline) applicable to other packaging development projects were made available. It was determined that involving packaging engineers in projects in their early stages can maximize their input and reduce time to market and total costs for package development, as well as assure the integrity of the product and its packaging."],"dc:description.note":["<p>Physical copy available from RIT's Wallace Library at TS196 .B45 2008</p>"],"dc:identifier":["https://repository.rit.edu/theses/9331"],"dc:subject":["None provided"],"dc:title":["Application of Project Management Methodology From Idea Generation to New Bundle Development in Personal Care Packaging Projects"],"thesis:degree_discipline":["Packaging Science (CAST)"],"thesis:degree_level":["Thesis"],"thesis:degree_name":["Packaging Science(MS)"]},"updated_at":"2026-11-19T09:02:57Z"}