{"id":{"repo_id":"rit","oai_identifier":"oai:repository.rit.edu:theses-9679"},"canonical_url":"https://search.ndltd.org/etd/rit/oai:repository.rit.edu:theses-9679","repository":{"repo_id":"rit","name":"Rochester Institute of Technology","base_url":"https://repository.rit.edu/do/oai/"},"display":{"title":"Implementation of Cross-training for Multi-shift Worker Allocation","abstract":"In workforce allocation, gaps between workers available and workers needed at various operations result in production delays and a loss of profitability for the manufacturer. These gaps can be reduced by overtime assignments of workers from other shifts. However, for a multiple shift planning horizon, a mix of cross-training of workers over different tasks along with overtime assignments may be a good strategy. This work develops an industry-motivated cross-training framework that identifies workers and operations for normal, overtime, and training assignments. A mixed integer programming model that integrates all three assignment tasks is formulated and solved. The production scenario consists of skill level based qualifications for workers that need to be assigned to operations in every shift. Factory floor conditions such as limits on worker levels at specific operations, scheduling restrictions and worker training protocols are also considered. The data taken into account includes parameters such as man-machine ratio, tool count, and limits on skill qualifications for workers. The output of the model provides a cross-training schedule and an assignment schedule that can be used by floor managers on a shift-by-shift basis. The MIP model is implemented in C# using the .NET framework and the IBM ILOG CPLEX Optimizer.","abstract_html":"In workforce allocation, gaps between workers available and workers needed at various operations result in production delays and a loss of profitability for the manufacturer. These gaps can be reduced by overtime assignments of workers from other shifts. However, for a multiple shift planning horizon, a mix of cross-training of workers over different tasks along with overtime assignments may be a good strategy. This work develops an industry-motivated cross-training framework that identifies workers and operations for normal, overtime, and training assignments. A mixed integer programming model that integrates all three assignment tasks is formulated and solved. The production scenario consists of skill level based qualifications for workers that need to be assigned to operations in every shift. Factory floor conditions such as limits on worker levels at specific operations, scheduling restrictions and worker training protocols are also considered. The data taken into account includes parameters such as man-machine ratio, tool count, and limits on skill qualifications for workers. The output of the model provides a cross-training schedule and an assignment schedule that can be used by floor managers on a shift-by-shift basis. The MIP model is implemented in C# using the .NET framework and the IBM ILOG CPLEX Optimizer.","abstract_has_math":false,"creators":["Gandhi, Aditya"],"institution":null,"degree_name":"Industrial and Systems Engineering (MS)","degree_level":"Thesis","degree_discipline":"Industrial and Systems Engineering (KGCOE)","degree_department":null,"school":null,"contributors":["Scott E. Grasman"],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T09:01:53Z","subjects":["Cross-training","Mixed integer programming","Workforce allocation"],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://repository.rit.edu/theses/8518","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://repository.rit.edu/theses/8518","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://repository.rit.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Arepository.rit.edu%3Atheses-9679","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor","label":"Contributor","values":["Scott E. Grasman"]},{"key":"dc:creator","label":"Author","values":["Gandhi, Aditya"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.available","label":"Dc Date Available","values":["1970-01-01T11:40:16Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2014-12-11T08:00:00Z"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Industrial and Systems Engineering (KGCOE)"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Thesis"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Industrial and Systems Engineering (MS)"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Cross-training","Mixed integer programming","Workforce allocation"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://repository.rit.edu/theses/8518"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["In workforce allocation, gaps between workers available and workers needed at various operations result in production delays and a loss of profitability for the manufacturer. These gaps can be reduced by overtime assignments of workers from other shifts. However, for a multiple shift planning horizon, a mix of cross-training of workers over different tasks along with overtime assignments may be a good strategy. This work develops an industry-motivated cross-training framework that identifies workers and operations for normal, overtime, and training assignments. A mixed integer programming model that integrates all three assignment tasks is formulated and solved. The production scenario consists of skill level based qualifications for workers that need to be assigned to operations in every shift. Factory floor conditions such as limits on worker levels at specific operations, scheduling restrictions and worker training protocols are also considered. The data taken into account includes parameters such as man-machine ratio, tool count, and limits on skill qualifications for workers. The output of the model provides a cross-training schedule and an assignment schedule that can be used by floor managers on a shift-by-shift basis. The MIP model is implemented in C# using the .NET framework and the IBM ILOG CPLEX Optimizer."]},{"key":"dc:description.note","label":"Dc Description Note","values":["<p>Physical copy available from RIT's Wallace Library at HF5549.5.M3 G36 2014</p>"]},{"key":"dc:title","label":"Title","values":["Implementation of Cross-training for Multi-shift Worker Allocation"]}]}],"canonical_facts":{"dc:contributor":["Scott E. Grasman"],"dc:creator":["Gandhi, Aditya"],"dc:date.available":["1970-01-01T11:40:16Z"],"dc:date.created":["2014-12-11T08:00:00Z"],"dc:description.abstract":["In workforce allocation, gaps between workers available and workers needed at various operations result in production delays and a loss of profitability for the manufacturer. These gaps can be reduced by overtime assignments of workers from other shifts. However, for a multiple shift planning horizon, a mix of cross-training of workers over different tasks along with overtime assignments may be a good strategy. This work develops an industry-motivated cross-training framework that identifies workers and operations for normal, overtime, and training assignments. A mixed integer programming model that integrates all three assignment tasks is formulated and solved. The production scenario consists of skill level based qualifications for workers that need to be assigned to operations in every shift. Factory floor conditions such as limits on worker levels at specific operations, scheduling restrictions and worker training protocols are also considered. The data taken into account includes parameters such as man-machine ratio, tool count, and limits on skill qualifications for workers. The output of the model provides a cross-training schedule and an assignment schedule that can be used by floor managers on a shift-by-shift basis. The MIP model is implemented in C# using the .NET framework and the IBM ILOG CPLEX Optimizer."],"dc:description.note":["<p>Physical copy available from RIT's Wallace Library at HF5549.5.M3 G36 2014</p>"],"dc:identifier":["https://repository.rit.edu/theses/8518"],"dc:subject":["Cross-training","Mixed integer programming","Workforce allocation"],"dc:title":["Implementation of Cross-training for Multi-shift Worker Allocation"],"thesis:degree_discipline":["Industrial and Systems Engineering (KGCOE)"],"thesis:degree_level":["Thesis"],"thesis:degree_name":["Industrial and Systems Engineering (MS)"]},"updated_at":"2026-11-19T09:01:53Z"}