{"id":{"repo_id":"sask","oai_identifier":"oai:harvest.usask.ca:10388/14690"},"canonical_url":"https://search.ndltd.org/etd/sask/oai:harvest.usask.ca:10388/14690","repository":{"repo_id":"sask","name":"University of Saskatchewan","base_url":"https://harvest.usask.ca/server/oai/request"},"display":{"title":"Microgrid Planning in Distribution Networks Through Optimal Allocation and Sizing of Distributed Generation and Microgrid Formation","abstract":"Microgrid formation is an effective way to transform a conventional distribution network into its active form due to increasing penetration of renewable distributed generation (DG). Proper planning of microgrids is essential to realize their benefits in distribution networks. In this thesis, microgrid planning in distribution networks have been studied through the following two aspects: 1) optimal placement and sizing of DGs, and 2) microgrid formation with switch placement. Two approaches, deterministic and probabilistic, are proposed for optimal placement of DGs which is the primary step towards microgrid planning. In the deterministic approach, Brute Force search algorithm and Backward Forward Sweep load flow algorithm are used to optimally place and size DGs by minimizing the total power loss in distribution networks. The IEEE 33-node test system is used to validate the proposed method through several case studies considering dispatchable and non-dispatchable DGs and capacitor banks. The proposed method is proven to be effective by comparing with existing methods. By incorporating uncertainties of renewable DGs and loads, a probabilistic method for optimal DG placement by minimizing the total energy loss is proposed, where the planning is formulated as a non-linear programming (NLP) problem. AC optimal power flow (OPF) is used to solve this planning problem by considering operational constraints and uncertainties in loads and renewable power generation of the network. A new index, the Voltage Regulation Index (VRI), is proposed to select candidate locations for DG placement in a distribution network. Four commercially available solar photovoltaic (PV) modules are evaluated and the highest performing one is chosen and utilized in this method. The IEEE 33-node test system and a real 404-node distribution system operated by Saskatoon Light and Power in Saskatoon, Canada are used to validate the proposed method. The proposed method shows superior performance compared to existing methods. A new method for microgrid planning through optimal microgrid formation in distribution network is proposed through a two-stage performance optimization, where the total power loss, the adequacy and reliability of the whole system are optimized in the first stage. A new index, the Microgrid Planning Index (MPI), is defined as the objective of the optimization process. The MPI includes the total power loss index, the self-adequacy index, and the reliability index. In the second stage, isolating switches are allocated at judicious locations within each microgrid to improve the reliability of the system. Brute Force search algorithm and Backward Forward Sweep method are used to solve optimization and load flow problems, respectively. The IEEE 33-node test system is used to validate the proposed method.","abstract_html":"Microgrid formation is an effective way to transform a conventional distribution network into its active form due to increasing penetration of renewable distributed generation (DG). Proper planning of microgrids is essential to realize their benefits in distribution networks. In this thesis, microgrid planning in distribution networks have been studied through the following two aspects: 1) optimal placement and sizing of DGs, and 2) microgrid formation with switch placement. Two approaches, deterministic and probabilistic, are proposed for optimal placement of DGs which is the primary step towards microgrid planning. In the deterministic approach, Brute Force search algorithm and Backward Forward Sweep load flow algorithm are used to optimally place and size DGs by minimizing the total power loss in distribution networks. The IEEE 33-node test system is used to validate the proposed method through several case studies considering dispatchable and non-dispatchable DGs and capacitor banks. The proposed method is proven to be effective by comparing with existing methods. By incorporating uncertainties of renewable DGs and loads, a probabilistic method for optimal DG placement by minimizing the total energy loss is proposed, where the planning is formulated as a non-linear programming (NLP) problem. AC optimal power flow (OPF) is used to solve this planning problem by considering operational constraints and uncertainties in loads and renewable power generation of the network. A new index, the Voltage Regulation Index (VRI), is proposed to select candidate locations for DG placement in a distribution network. Four commercially available solar photovoltaic (PV) modules are evaluated and the highest performing one is chosen and utilized in this method. The IEEE 33-node test system and a real 404-node distribution system operated by Saskatoon Light and Power in Saskatoon, Canada are used to validate the proposed method. The proposed method shows superior performance compared to existing methods. A new method for microgrid planning through optimal microgrid formation in distribution network is proposed through a two-stage performance optimization, where the total power loss, the adequacy and reliability of the whole system are optimized in the first stage. A new index, the Microgrid Planning Index (MPI), is defined as the objective of the optimization process. The MPI includes the total power loss index, the self-adequacy index, and the reliability index. In the second stage, isolating switches are allocated at judicious locations within each microgrid to improve the reliability of the system. Brute Force search algorithm and Backward Forward Sweep method are used to solve optimization and load flow problems, respectively. The IEEE 33-node test system is used to validate the proposed method.","abstract_has_math":false,"creators":["Shawon, Shah Mohammad Rezwanul Haque"],"institution":"University of Saskatchewan","degree_name":"Master of Science (M.Sc.)","degree_level":"Masters","degree_discipline":"Electrical Engineering","degree_department":"Electrical and Computer Engineering","school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":["Faried, Sherif","Mohamed, Ebrahim Bedeer","Liang, Xiaodong"],"year":2023,"date_issued":"2023-05-19","date_published":"2023-05-19","updated_at":"2026-11-19T10:01:59Z","subjects":["Microgrid planning","active distribution systems","distributed generations","microgrid formation","switch placement."],"languages":["en"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/10388/14690","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/10388/14690","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":"embargoed","embargo_until":"2024-05-19","access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Asask%3Aoai%3Aharvest.usask.ca%3A10388%2F14690","prefix":"oai_dc"},"source_record":{"url":"https://harvest.usask.ca/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aharvest.usask.ca%3A10388%2F14690","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.committeemember","label":"Committee Member","values":["Faried, Sherif","Mohamed, Ebrahim Bedeer","Liang, Xiaodong"]},{"key":"dc:creator","label":"Author","values":["Shawon, Shah Mohammad Rezwanul Haque"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2023-05-19T18:10:14Z"]},{"key":"dc:date.copyright","label":"Dc Date Copyright","values":["2023"]},{"key":"dc:date.created","label":"Dc Date Created","values":["2023-05"]},{"key":"dc:date.embargo","label":"Dc Date Embargo","values":["2024-05-19"]},{"key":"dc:date.issued","label":"Date","values":["2023-05-19"]},{"key":"dc:date.liftdate","label":"Dc Date Liftdate","values":["2024-05-19"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["May 2023"]},{"key":"dc:date.updated","label":"Dc Date Updated","values":["2023-05-19T18:10:15Z"]},{"key":"dc:type","label":"Dc Type","values":["Thesis","text"]},{"key":"thesis:degree_department","label":"Department","values":["Electrical and Computer Engineering"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Electrical Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Masters"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science (M.Sc.)"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of Saskatchewan"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Microgrid planning","active distribution systems","distributed generations","microgrid formation","switch placement."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["en"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/10388/14690"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Microgrid formation is an effective way to transform a conventional distribution network into its active form due to increasing penetration of renewable distributed generation (DG). Proper planning of microgrids is essential to realize their benefits in distribution networks. In this thesis, microgrid planning in distribution networks have been studied through the following two aspects: 1) optimal placement and sizing of DGs, and 2) microgrid formation with switch placement. Two approaches, deterministic and probabilistic, are proposed for optimal placement of DGs which is the primary step towards microgrid planning. In the deterministic approach, Brute Force search algorithm and Backward Forward Sweep load flow algorithm are used to optimally place and size DGs by minimizing the total power loss in distribution networks. The IEEE 33-node test system is used to validate the proposed method through several case studies considering dispatchable and non-dispatchable DGs and capacitor banks. The proposed method is proven to be effective by comparing with existing methods. By incorporating uncertainties of renewable DGs and loads, a probabilistic method for optimal DG placement by minimizing the total energy loss is proposed, where the planning is formulated as a non-linear programming (NLP) problem. AC optimal power flow (OPF) is used to solve this planning problem by considering operational constraints and uncertainties in loads and renewable power generation of the network. A new index, the Voltage Regulation Index (VRI), is proposed to select candidate locations for DG placement in a distribution network. Four commercially available solar photovoltaic (PV) modules are evaluated and the highest performing one is chosen and utilized in this method. The IEEE 33-node test system and a real 404-node distribution system operated by Saskatoon Light and Power in Saskatoon, Canada are used to validate the proposed method. The proposed method shows superior performance compared to existing methods. A new method for microgrid planning through optimal microgrid formation in distribution network is proposed through a two-stage performance optimization, where the total power loss, the adequacy and reliability of the whole system are optimized in the first stage. A new index, the Microgrid Planning Index (MPI), is defined as the objective of the optimization process. The MPI includes the total power loss index, the self-adequacy index, and the reliability index. In the second stage, isolating switches are allocated at judicious locations within each microgrid to improve the reliability of the system. Brute Force search algorithm and Backward Forward Sweep method are used to solve optimization and load flow problems, respectively. The IEEE 33-node test system is used to validate the proposed method."]},{"key":"dc:format.mimetype","label":"Dc Format Mimetype","values":["application/pdf"]},{"key":"dc:title","label":"Title","values":["Microgrid Planning in Distribution Networks Through Optimal Allocation and Sizing of Distributed Generation and Microgrid Formation"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.committeemember":["Faried, Sherif","Mohamed, Ebrahim Bedeer","Liang, Xiaodong"],"dc:creator":["Shawon, Shah Mohammad Rezwanul Haque"],"dc:date.accessioned":["2023-05-19T18:10:14Z"],"dc:date.copyright":["2023"],"dc:date.created":["2023-05"],"dc:date.embargo":["2024-05-19"],"dc:date.issued":["2023-05-19"],"dc:date.liftdate":["2024-05-19"],"dc:date.submitted":["May 2023"],"dc:date.updated":["2023-05-19T18:10:15Z"],"dc:description.abstract":["Microgrid formation is an effective way to transform a conventional distribution network into its active form due to increasing penetration of renewable distributed generation (DG). Proper planning of microgrids is essential to realize their benefits in distribution networks. In this thesis, microgrid planning in distribution networks have been studied through the following two aspects: 1) optimal placement and sizing of DGs, and 2) microgrid formation with switch placement. Two approaches, deterministic and probabilistic, are proposed for optimal placement of DGs which is the primary step towards microgrid planning. In the deterministic approach, Brute Force search algorithm and Backward Forward Sweep load flow algorithm are used to optimally place and size DGs by minimizing the total power loss in distribution networks. The IEEE 33-node test system is used to validate the proposed method through several case studies considering dispatchable and non-dispatchable DGs and capacitor banks. The proposed method is proven to be effective by comparing with existing methods. By incorporating uncertainties of renewable DGs and loads, a probabilistic method for optimal DG placement by minimizing the total energy loss is proposed, where the planning is formulated as a non-linear programming (NLP) problem. AC optimal power flow (OPF) is used to solve this planning problem by considering operational constraints and uncertainties in loads and renewable power generation of the network. A new index, the Voltage Regulation Index (VRI), is proposed to select candidate locations for DG placement in a distribution network. Four commercially available solar photovoltaic (PV) modules are evaluated and the highest performing one is chosen and utilized in this method. The IEEE 33-node test system and a real 404-node distribution system operated by Saskatoon Light and Power in Saskatoon, Canada are used to validate the proposed method. The proposed method shows superior performance compared to existing methods. A new method for microgrid planning through optimal microgrid formation in distribution network is proposed through a two-stage performance optimization, where the total power loss, the adequacy and reliability of the whole system are optimized in the first stage. A new index, the Microgrid Planning Index (MPI), is defined as the objective of the optimization process. The MPI includes the total power loss index, the self-adequacy index, and the reliability index. In the second stage, isolating switches are allocated at judicious locations within each microgrid to improve the reliability of the system. Brute Force search algorithm and Backward Forward Sweep method are used to solve optimization and load flow problems, respectively. The IEEE 33-node test system is used to validate the proposed method."],"dc:format.mimetype":["application/pdf"],"dc:identifier.uri":["https://hdl.handle.net/10388/14690"],"dc:language.iso":["en"],"dc:subject":["Microgrid planning","active distribution systems","distributed generations","microgrid formation","switch placement."],"dc:title":["Microgrid Planning in Distribution Networks Through Optimal Allocation and Sizing of Distributed Generation and Microgrid Formation"],"dc:type":["Thesis","text"],"others:access_status":["open.access"],"thesis:degree_department":["Electrical and Computer Engineering"],"thesis:degree_discipline":["Electrical Engineering"],"thesis:degree_level":["Masters"],"thesis:degree_name":["Master of Science (M.Sc.)"],"thesis:institution_name":["University of Saskatchewan"]},"updated_at":"2026-11-19T10:01:59Z"}