{"id":{"repo_id":"sdstate","oai_identifier":"oai:openprairie.sdstate.edu:etd-5770"},"canonical_url":"https://search.ndltd.org/etd/sdstate/oai:openprairie.sdstate.edu:etd-5770","repository":{"repo_id":"sdstate","name":"South Dakota State University","base_url":"https://openprairie.sdstate.edu/do/oai/"},"display":{"title":"Opportunity Costs of Diverting Water from Agriculture to Industry in Portions of Northeastern Wyoming","abstract":"Studies have been made on the feasibility and cost of diverting water both within and to Northeastern Wyoming. Estimates -for diverting water from the Powder River, including Crazy Woman and Clear Creeks, to the Gillette (Campbell County) area range from an annual water supply of 251,000 to 53,000 acre-feet, with dam construction costs of 6 to 59 million dollars. The annual water costs per acre-foot for delivery from the reservoirs to Gillette range from 76 to 99 dollars. Presumably the water would be taken from the unused and unappropriated water supply. Estimates for diverting water from the Tongue River for industrial use in Sheridan County range from an annual water supply of 38,000 to 88,000 acre-feet, with dam construction costs of 11 to 30 million dollars. The annual water costs per acre-foot at the reservoirs range from 10 to 48 dollars. Again, presumably the water would be taken from the unused and unappropriated water supply. Proposals to divert water from Montana (the Bighorn River) and Southwest Wyoming (the Green River) to Gillette would supply from 135,000 to 239,000 acre-feet of water per year. Dam construction costs range from 240 to 334 million dollars. The annual water costs per acre-foot for delivery to Gillette range from 108 to 132 dollars. One alternative for supplying Northeastern Wyoming with enough water to meet its industrial requirements is that of diverting water within the area from agriculture to industry on the basis of equal marginal costs of diversion, The purpose of this paper is to present the opportunity costs of diverting water from agriculture to industry.","abstract_html":"Studies have been made on the feasibility and cost of diverting water both within and to Northeastern Wyoming. Estimates -for diverting water from the Powder River, including Crazy Woman and Clear Creeks, to the Gillette (Campbell County) area range from an annual water supply of 251,000 to 53,000 acre-feet, with dam construction costs of 6 to 59 million dollars. The annual water costs per acre-foot for delivery from the reservoirs to Gillette range from 76 to 99 dollars. Presumably the water would be taken from the unused and unappropriated water supply. Estimates for diverting water from the Tongue River for industrial use in Sheridan County range from an annual water supply of 38,000 to 88,000 acre-feet, with dam construction costs of 11 to 30 million dollars. The annual water costs per acre-foot at the reservoirs range from 10 to 48 dollars. Again, presumably the water would be taken from the unused and unappropriated water supply. Proposals to divert water from Montana (the Bighorn River) and Southwest Wyoming (the Green River) to Gillette would supply from 135,000 to 239,000 acre-feet of water per year. Dam construction costs range from 240 to 334 million dollars. The annual water costs per acre-foot for delivery to Gillette range from 108 to 132 dollars. One alternative for supplying Northeastern Wyoming with enough water to meet its industrial requirements is that of diverting water within the area from agriculture to industry on the basis of equal marginal costs of diversion, The purpose of this paper is to present the opportunity costs of diverting water from agriculture to industry.","abstract_has_math":false,"creators":["Murray, Woodrow Elbert"],"institution":null,"degree_name":"Master of Science (MS)","degree_level":"Thesis - Open Access","degree_discipline":"Economics","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T09:01:31Z","subjects":[],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://openprairie.sdstate.edu/etd/4736","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://openprairie.sdstate.edu/etd/4736","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://openprairie.sdstate.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aopenprairie.sdstate.edu%3Aetd-5770","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Murray, Woodrow Elbert"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.available","label":"Dc Date Available","values":["2020-10-08T07:00:00Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["1974-01-01T08:00:00Z"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Economics"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Thesis - Open Access"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science (MS)"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://openprairie.sdstate.edu/etd/4736"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Studies have been made on the feasibility and cost of diverting water both within and to Northeastern Wyoming. Estimates -for diverting water from the Powder River, including Crazy Woman and Clear Creeks, to the Gillette (Campbell County) area range from an annual water supply of 251,000 to 53,000 acre-feet, with dam construction costs of 6 to 59 million dollars. The annual water costs per acre-foot for delivery from the reservoirs to Gillette range from 76 to 99 dollars. Presumably the water would be taken from the unused and unappropriated water supply. Estimates for diverting water from the Tongue River for industrial use in Sheridan County range from an annual water supply of 38,000 to 88,000 acre-feet, with dam construction costs of 11 to 30 million dollars. The annual water costs per acre-foot at the reservoirs range from 10 to 48 dollars. Again, presumably the water would be taken from the unused and unappropriated water supply. Proposals to divert water from Montana (the Bighorn River) and Southwest Wyoming (the Green River) to Gillette would supply from 135,000 to 239,000 acre-feet of water per year. Dam construction costs range from 240 to 334 million dollars. The annual water costs per acre-foot for delivery to Gillette range from 108 to 132 dollars. One alternative for supplying Northeastern Wyoming with enough water to meet its industrial requirements is that of diverting water within the area from agriculture to industry on the basis of equal marginal costs of diversion, The purpose of this paper is to present the opportunity costs of diverting water from agriculture to industry."]},{"key":"dc:title","label":"Title","values":["Opportunity Costs of Diverting Water from Agriculture to Industry in Portions of Northeastern Wyoming"]}]}],"canonical_facts":{"dc:creator":["Murray, Woodrow Elbert"],"dc:date.available":["2020-10-08T07:00:00Z"],"dc:date.created":["1974-01-01T08:00:00Z"],"dc:description.abstract":["Studies have been made on the feasibility and cost of diverting water both within and to Northeastern Wyoming. Estimates -for diverting water from the Powder River, including Crazy Woman and Clear Creeks, to the Gillette (Campbell County) area range from an annual water supply of 251,000 to 53,000 acre-feet, with dam construction costs of 6 to 59 million dollars. The annual water costs per acre-foot for delivery from the reservoirs to Gillette range from 76 to 99 dollars. Presumably the water would be taken from the unused and unappropriated water supply. Estimates for diverting water from the Tongue River for industrial use in Sheridan County range from an annual water supply of 38,000 to 88,000 acre-feet, with dam construction costs of 11 to 30 million dollars. The annual water costs per acre-foot at the reservoirs range from 10 to 48 dollars. Again, presumably the water would be taken from the unused and unappropriated water supply. Proposals to divert water from Montana (the Bighorn River) and Southwest Wyoming (the Green River) to Gillette would supply from 135,000 to 239,000 acre-feet of water per year. Dam construction costs range from 240 to 334 million dollars. The annual water costs per acre-foot for delivery to Gillette range from 108 to 132 dollars. One alternative for supplying Northeastern Wyoming with enough water to meet its industrial requirements is that of diverting water within the area from agriculture to industry on the basis of equal marginal costs of diversion, The purpose of this paper is to present the opportunity costs of diverting water from agriculture to industry."],"dc:identifier":["https://openprairie.sdstate.edu/etd/4736"],"dc:title":["Opportunity Costs of Diverting Water from Agriculture to Industry in Portions of Northeastern Wyoming"],"thesis:degree_discipline":["Economics"],"thesis:degree_level":["Thesis - Open Access"],"thesis:degree_name":["Master of Science (MS)"]},"updated_at":"2026-11-19T09:01:31Z"}