{"id":{"repo_id":"sdstate","oai_identifier":"oai:openprairie.sdstate.edu:etd2-1502"},"canonical_url":"https://search.ndltd.org/etd/sdstate/oai:openprairie.sdstate.edu:etd2-1502","repository":{"repo_id":"sdstate","name":"South Dakota State University","base_url":"https://openprairie.sdstate.edu/do/oai/"},"display":{"title":"Alternative Backfill Designs for Integral Abutment Bridge End Treatment","abstract":"The bump at the end of the bridge has long plagued motorists, designers, and maintenance personnel. The bump develops from the differential movements of the approach road and the bridge abutment. This movement produces discomfort to motorists, increased damage to vehicles, traffic hazards, and increased maintenance costs. The damage done by the movement of these systems can literally impair the structural integrity of the bridge in extreme cases. This problem is experienced in all states and is a recurring problem for transportation officials in the state of South Dakota. In integral abutment systems, abutment wall movement due to temperature cycles has been identified as a leading cause of movement in backfill materials. Based on field and model studies of the occurrence of voids under approach slabs, the South Dakota Department of Transportation has implemented the use of a geotextile reinforced soil wall for integral abutment bridge end treatment to provide a gap into which the abutment wall can cycle without disturbing the backfill. The effectiveness of this design and the development of alternative backfill designs through model studies was investigated.","abstract_html":"The bump at the end of the bridge has long plagued motorists, designers, and maintenance personnel. The bump develops from the differential movements of the approach road and the bridge abutment. This movement produces discomfort to motorists, increased damage to vehicles, traffic hazards, and increased maintenance costs. The damage done by the movement of these systems can literally impair the structural integrity of the bridge in extreme cases. This problem is experienced in all states and is a recurring problem for transportation officials in the state of South Dakota. In integral abutment systems, abutment wall movement due to temperature cycles has been identified as a leading cause of movement in backfill materials. Based on field and model studies of the occurrence of voids under approach slabs, the South Dakota Department of Transportation has implemented the use of a geotextile reinforced soil wall for integral abutment bridge end treatment to provide a gap into which the abutment wall can cycle without disturbing the backfill. The effectiveness of this design and the development of alternative backfill designs through model studies was investigated.","abstract_has_math":false,"creators":["Soupir, Steven Paul"],"institution":null,"degree_name":"Master of Science (MS)","degree_level":"Thesis - University Access Only","degree_discipline":"Civil and Environmental Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-19T09:03:37Z","subjects":[],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"https://openprairie.sdstate.edu/etd2/499","outbound_label":"Repository record","outbound_source":"dc:identifier","record_url":"https://openprairie.sdstate.edu/etd2/499","record_label":"Repository record","record_kind":"record","record_source":"dc:identifier","download_url":null,"download_label":null,"download_source":null,"access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://openprairie.sdstate.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Aopenprairie.sdstate.edu%3Aetd2-1502","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Soupir, Steven Paul"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.available","label":"Dc Date Available","values":["2023-02-10T08:00:00Z"]},{"key":"dc:date.created","label":"Dc Date Created","values":["1998-01-01T08:00:00Z"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil and Environmental Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["Thesis - University Access Only"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science (MS)"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://openprairie.sdstate.edu/etd2/499"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The bump at the end of the bridge has long plagued motorists, designers, and maintenance personnel. The bump develops from the differential movements of the approach road and the bridge abutment. This movement produces discomfort to motorists, increased damage to vehicles, traffic hazards, and increased maintenance costs. The damage done by the movement of these systems can literally impair the structural integrity of the bridge in extreme cases. This problem is experienced in all states and is a recurring problem for transportation officials in the state of South Dakota. In integral abutment systems, abutment wall movement due to temperature cycles has been identified as a leading cause of movement in backfill materials. Based on field and model studies of the occurrence of voids under approach slabs, the South Dakota Department of Transportation has implemented the use of a geotextile reinforced soil wall for integral abutment bridge end treatment to provide a gap into which the abutment wall can cycle without disturbing the backfill. The effectiveness of this design and the development of alternative backfill designs through model studies was investigated."]},{"key":"dc:title","label":"Title","values":["Alternative Backfill Designs for Integral Abutment Bridge End Treatment"]}]}],"canonical_facts":{"dc:creator":["Soupir, Steven Paul"],"dc:date.available":["2023-02-10T08:00:00Z"],"dc:date.created":["1998-01-01T08:00:00Z"],"dc:description.abstract":["The bump at the end of the bridge has long plagued motorists, designers, and maintenance personnel. The bump develops from the differential movements of the approach road and the bridge abutment. This movement produces discomfort to motorists, increased damage to vehicles, traffic hazards, and increased maintenance costs. The damage done by the movement of these systems can literally impair the structural integrity of the bridge in extreme cases. This problem is experienced in all states and is a recurring problem for transportation officials in the state of South Dakota. In integral abutment systems, abutment wall movement due to temperature cycles has been identified as a leading cause of movement in backfill materials. Based on field and model studies of the occurrence of voids under approach slabs, the South Dakota Department of Transportation has implemented the use of a geotextile reinforced soil wall for integral abutment bridge end treatment to provide a gap into which the abutment wall can cycle without disturbing the backfill. The effectiveness of this design and the development of alternative backfill designs through model studies was investigated."],"dc:identifier":["https://openprairie.sdstate.edu/etd2/499"],"dc:title":["Alternative Backfill Designs for Integral Abutment Bridge End Treatment"],"thesis:degree_discipline":["Civil and Environmental Engineering"],"thesis:degree_level":["Thesis - University Access Only"],"thesis:degree_name":["Master of Science (MS)"]},"updated_at":"2026-11-19T09:03:37Z"}