{"id":{"repo_id":"sevilla","oai_identifier":"oai:idus.us.es:11441/142142"},"canonical_url":"https://search.ndltd.org/etd/sevilla/oai:idus.us.es:11441/142142","repository":{"repo_id":"sevilla","name":"Universidad de Sevilla","base_url":"https://idus.us.es/server/oai/request"},"display":{"title":"The 2-stage Assembly Scheduling Problem","abstract":"Today, manufacturing systems face new global challenges that require flexibility and quick reactions. To remain competitive, companies must also focus on the minimisation of time, as it leads to cost reductions, shorter delivery times, and a more agile and flexible response. In this context, improving the scheduling is of great importance. This is why, in this doctoral thesis, different ways to improve the scheduling of the considered problem are discussed in this thesis. More specifically, we address the 2-stage assembly scheduling problem. This problem consists of two stages: the components of the product are processed in the first stage and then assembled in the second stage. In the first stage, we consider dedicated parallel machines and, in the second stage, one or several parallel assembly machines. The purpose of this thesis is to make several contributions in different aspects of the problem. First, we review in detail the problem under consideration. Second, there are some less studied variants of the problem that remain unanalysed and are considered in this thesis. Furthermore, there is no a common set of instances in which the different optimization methods developed to solve the problem can be evaluated and compared. Finally, additional constraints are also considered for the 2-stage assembly scheduling problem, as they have never been addressed.","abstract_html":"Today, manufacturing systems face new global challenges that require flexibility and quick reactions. To remain competitive, companies must also focus on the minimisation of time, as it leads to cost reductions, shorter delivery times, and a more agile and flexible response. In this context, improving the scheduling is of great importance. This is why, in this doctoral thesis, different ways to improve the scheduling of the considered problem are discussed in this thesis. More specifically, we address the 2-stage assembly scheduling problem. This problem consists of two stages: the components of the product are processed in the first stage and then assembled in the second stage. In the first stage, we consider dedicated parallel machines and, in the second stage, one or several parallel assembly machines. The purpose of this thesis is to make several contributions in different aspects of the problem. First, we review in detail the problem under consideration. Second, there are some less studied variants of the problem that remain unanalysed and are considered in this thesis. Furthermore, there is no a common set of instances in which the different optimization methods developed to solve the problem can be evaluated and compared. Finally, additional constraints are also considered for the 2-stage assembly scheduling problem, as they have never been addressed.","abstract_has_math":false,"creators":["Talens Fayos, Carla"],"institution":null,"degree_name":null,"degree_level":null,"degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Fernández-Viagas Escudero, Víctor","Pérez González, Paz"],"committee_chairs":[],"committee_members":[],"year":2022,"date_issued":"2022-11-22","date_published":"2022-11-22","updated_at":"2026-11-19T07:50:23Z","subjects":[],"languages":["eng"],"rights":["open access","Attribution-NonCommercial-NoDerivatives 4.0 Internacional"],"rights_urls":["http://creativecommons.org/licenses/by-nc-nd/4.0/"],"identifier_entries":[{"key":"dc:identifier.citation","label":"Dc Identifier Citation","values":["Talens Fayos, C. (2022). The 2-stage Assembly Scheduling Problem. (Tesis Doctoral Inédita). Universidad de Sevilla, Sevilla."],"render_values":[{"text":"Talens Fayos, C. (2022). The 2-stage Assembly Scheduling Problem. (Tesis Doctoral Inédita). Universidad de Sevilla, Sevilla.","href":null,"code":true}]},{"key":"mods:identifier.ror","label":"Mods Identifier Ror","values":["https://ror.org/03yxnpp24"],"render_values":[{"text":"https://ror.org/03yxnpp24","href":"https://ror.org/03yxnpp24","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/11441/142142","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/11441/142142","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":"embargoed","embargo_until":"2023-11-22","access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Asevilla%3Aoai%3Aidus.us.es%3A11441%2F142142","prefix":"oai_dc"},"source_record":{"url":"https://idus.us.es/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Aidus.us.es%3A11441%2F142142","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Fernández-Viagas Escudero, Víctor","Pérez González, Paz"]},{"key":"dc:creator","label":"Author","values":["Talens Fayos, Carla"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2023-01-30T12:55:17Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2023-01-30T12:55:17Z"]},{"key":"dc:date.issued","label":"Date","values":["2022-11-22"]},{"key":"dc:date.liftdate","label":"Dc Date Liftdate","values":["2023-11-22"]},{"key":"dc:type","label":"Dc Type","values":["tesis doctoral"]},{"key":"dc:type.version","label":"Dc Type Version","values":["VoR"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.iso","label":"Language (ISO)","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["Attribution-NonCommercial-NoDerivatives 4.0 Internacional"]},{"key":"dc:rights.accessrights","label":"Access Rights","values":["open access"]},{"key":"dc:rights.uri","label":"Rights URI","values":["http://creativecommons.org/licenses/by-nc-nd/4.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.citation","label":"Dc Identifier Citation","values":["Talens Fayos, C. (2022). The 2-stage Assembly Scheduling Problem. (Tesis Doctoral Inédita). Universidad de Sevilla, Sevilla."]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/11441/142142"]},{"key":"mods:identifier.ror","label":"Mods Identifier Ror","values":["https://ror.org/03yxnpp24"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Today, manufacturing systems face new global challenges that require flexibility and quick reactions. To remain competitive, companies must also focus on the minimisation of time, as it leads to cost reductions, shorter delivery times, and a more agile and flexible response. In this context, improving the scheduling is of great importance. This is why, in this doctoral thesis, different ways to improve the scheduling of the considered problem are discussed in this thesis. More specifically, we address the 2-stage assembly scheduling problem. This problem consists of two stages: the components of the product are processed in the first stage and then assembled in the second stage. In the first stage, we consider dedicated parallel machines and, in the second stage, one or several parallel assembly machines. The purpose of this thesis is to make several contributions in different aspects of the problem. First, we review in detail the problem under consideration. Second, there are some less studied variants of the problem that remain unanalysed and are considered in this thesis. Furthermore, there is no a common set of instances in which the different optimization methods developed to solve the problem can be evaluated and compared. Finally, additional constraints are also considered for the 2-stage assembly scheduling problem, as they have never been addressed."]},{"key":"dc:format","label":"Dc Format","values":["application/pdf"]},{"key":"dc:format.extent","label":"Dc Format Extent","values":["158 p.","158"]},{"key":"dc:title","label":"Title","values":["The 2-stage Assembly Scheduling Problem"]},{"key":"local:contributor.affiliation","label":"Local Contributor Affiliation","values":["Organización Industrial y Gestión de Empresas I"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Fernández-Viagas Escudero, Víctor","Pérez González, Paz"],"dc:creator":["Talens Fayos, Carla"],"dc:date.accessioned":["2023-01-30T12:55:17Z"],"dc:date.available":["2023-01-30T12:55:17Z"],"dc:date.issued":["2022-11-22"],"dc:date.liftdate":["2023-11-22"],"dc:description.abstract":["Today, manufacturing systems face new global challenges that require flexibility and quick reactions. To remain competitive, companies must also focus on the minimisation of time, as it leads to cost reductions, shorter delivery times, and a more agile and flexible response. In this context, improving the scheduling is of great importance. This is why, in this doctoral thesis, different ways to improve the scheduling of the considered problem are discussed in this thesis. More specifically, we address the 2-stage assembly scheduling problem. This problem consists of two stages: the components of the product are processed in the first stage and then assembled in the second stage. In the first stage, we consider dedicated parallel machines and, in the second stage, one or several parallel assembly machines. The purpose of this thesis is to make several contributions in different aspects of the problem. First, we review in detail the problem under consideration. Second, there are some less studied variants of the problem that remain unanalysed and are considered in this thesis. Furthermore, there is no a common set of instances in which the different optimization methods developed to solve the problem can be evaluated and compared. Finally, additional constraints are also considered for the 2-stage assembly scheduling problem, as they have never been addressed."],"dc:format":["application/pdf"],"dc:format.extent":["158 p.","158"],"dc:identifier.citation":["Talens Fayos, C. (2022). The 2-stage Assembly Scheduling Problem. (Tesis Doctoral Inédita). Universidad de Sevilla, Sevilla."],"dc:identifier.uri":["https://hdl.handle.net/11441/142142"],"dc:language.iso":["eng"],"dc:rights":["Attribution-NonCommercial-NoDerivatives 4.0 Internacional"],"dc:rights.accessrights":["open access"],"dc:rights.uri":["http://creativecommons.org/licenses/by-nc-nd/4.0/"],"dc:title":["The 2-stage Assembly Scheduling Problem"],"dc:type":["tesis doctoral"],"dc:type.version":["VoR"],"local:contributor.affiliation":["Organización Industrial y Gestión de Empresas I"],"mods:identifier.ror":["https://ror.org/03yxnpp24"],"others:access_status":["open.access"]},"updated_at":"2026-11-19T07:50:23Z"}