{"id":{"repo_id":"sjsu","oai_identifier":"oai:scholarworks.sjsu.edu:etd_projects-2860"},"canonical_url":"https://search.ndltd.org/etd/sjsu/oai:scholarworks.sjsu.edu:etd_projects-2860","repository":{"repo_id":"sjsu","name":"San Jose State University","base_url":"https://scholarworks.sjsu.edu/do/oai/"},"display":{"title":"The City of Monte Sereno General Plan Update","abstract":"The purpose of this report is to prepare a preliminary assessment of Monte Sereno'scurrent General Plan and provide a guide for a comprehensive update. The current Plan waswritten in 1982, with the provision that it was to be updated every five (5) years. It is awidely accepted planning standard that a city should comprehensively review their Planevery five years to determine whether it is still in harmony with community values andconditions. There have been no revisions to Monte Sereno's current Plan, with the exceptionof the Housing Element in 1991. Due to the significant time lapse since the last revision, 13years, the extensive amount of improvements required, and the State mandate for HousingElement revision, this analysis determined a complete revamping of the Plan necessary toredeem it to its proper use, as the City's contemporary guide.","abstract_html":"The purpose of this report is to prepare a preliminary assessment of Monte Sereno&#x27;scurrent General Plan and provide a guide for a comprehensive update. The current Plan waswritten in 1982, with the provision that it was to be updated every five (5) years. It is awidely accepted planning standard that a city should comprehensively review their Planevery five years to determine whether it is still in harmony with community values andconditions. There have been no revisions to Monte Sereno&#x27;s current Plan, with the exceptionof the Housing Element in 1991. Due to the significant time lapse since the last revision, 13years, the extensive amount of improvements required, and the State mandate for HousingElement revision, this analysis determined a complete revamping of the Plan necessary toredeem it to its proper use, as the City&#x27;s contemporary guide.","abstract_has_math":false,"creators":["Hudson, Whitney A."],"institution":null,"degree_name":"Master of Urban Planning (MUP)","degree_level":null,"degree_discipline":"Urban and Regional Planning","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":null,"date_issued":"","date_published":null,"updated_at":"2026-11-26T14:04:17Z","subjects":[],"languages":[],"rights":[],"rights_urls":[],"identifier_entries":[{"key":"dc:identifier","label":"Identifier","values":["https://scholarworks.sjsu.edu/etd_projects/1860"],"render_values":[{"text":"https://scholarworks.sjsu.edu/etd_projects/1860","href":"https://scholarworks.sjsu.edu/etd_projects/1860","code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://doi.org/10.31979/etd.xtna-v9eh","outbound_label":"DOI","outbound_source":"dc:identifier","record_url":"https://doi.org/10.31979/etd.xtna-v9eh","record_label":"Repository record","record_kind":"doi","record_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Asjsu%3Aoai%3Ascholarworks.sjsu.edu%3Aetd_projects-2860","prefix":"oai_dc"},"source_record":{"url":"https://scholarworks.sjsu.edu/do/oai/?verb=GetRecord&metadataPrefix=oai_etdms&identifier=oai%3Ascholarworks.sjsu.edu%3Aetd_projects-2860","prefix":"oai_etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Hudson, Whitney A."]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.created","label":"Dc Date Created","values":["1995-05-01T07:00:00Z"]},{"key":"dc:type","label":"Dc Type","values":["Master's Project"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Urban and Regional Planning"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Urban Planning (MUP)"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["https://doi.org/10.31979/etd.xtna-v9eh","https://scholarworks.sjsu.edu/etd_projects/1860"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The purpose of this report is to prepare a preliminary assessment of Monte Sereno'scurrent General Plan and provide a guide for a comprehensive update. The current Plan waswritten in 1982, with the provision that it was to be updated every five (5) years. It is awidely accepted planning standard that a city should comprehensively review their Planevery five years to determine whether it is still in harmony with community values andconditions. There have been no revisions to Monte Sereno's current Plan, with the exceptionof the Housing Element in 1991. Due to the significant time lapse since the last revision, 13years, the extensive amount of improvements required, and the State mandate for HousingElement revision, this analysis determined a complete revamping of the Plan necessary toredeem it to its proper use, as the City's contemporary guide."]},{"key":"dc:title","label":"Title","values":["The City of Monte Sereno General Plan Update"]}]}],"canonical_facts":{"dc:creator":["Hudson, Whitney A."],"dc:date.created":["1995-05-01T07:00:00Z"],"dc:description.abstract":["The purpose of this report is to prepare a preliminary assessment of Monte Sereno'scurrent General Plan and provide a guide for a comprehensive update. The current Plan waswritten in 1982, with the provision that it was to be updated every five (5) years. It is awidely accepted planning standard that a city should comprehensively review their Planevery five years to determine whether it is still in harmony with community values andconditions. There have been no revisions to Monte Sereno's current Plan, with the exceptionof the Housing Element in 1991. Due to the significant time lapse since the last revision, 13years, the extensive amount of improvements required, and the State mandate for HousingElement revision, this analysis determined a complete revamping of the Plan necessary toredeem it to its proper use, as the City's contemporary guide."],"dc:identifier":["https://doi.org/10.31979/etd.xtna-v9eh","https://scholarworks.sjsu.edu/etd_projects/1860"],"dc:title":["The City of Monte Sereno General Plan Update"],"dc:type":["Master's Project"],"thesis:degree_discipline":["Urban and Regional Planning"],"thesis:degree_name":["Master of Urban Planning (MUP)"]},"updated_at":"2026-11-26T14:04:17Z"}