{"id":{"repo_id":"soton","oai_identifier":"oai:eprints.soton.ac.uk:465301"},"canonical_url":"https://search.ndltd.org/etd/soton/oai:eprints.soton.ac.uk:465301","repository":{"repo_id":"soton","name":"University of Southampton","base_url":"https://eprints.soton.ac.uk/cgi/oai2"},"display":{"title":"The UK rail industry 1993-2000 : a case study of risk management across the public-private sector interface","abstract":"<p>The research examines the utility of the scientific perception of risk in the context of the experience of the UK Railway system between 1993 - 2000; a period that saw the fragmentation of the industry as the privatisation process came to fruition. Particular attention is paid to the utility of Quantitative Risk Assessment techniques, such as Cost benefit Analysis in identifying and informing decisions about risk, in the newly open system that characterised the Rail industry in this period. In this, regard is taken of Charles Perrow’s theories about the inevitability of accidents in systems that are complex and which use advanced technology; an inevitability that leads him to conclude that they are ‘Normal’ accidents. The conclusion is that in the complex and interdependent industries such as the privatised rail industry, such techniques have proven inadequate and inappropriate, due to institutional and organisational failings.</p>","abstract_html":"&lt;p&gt;The research examines the utility of the scientific perception of risk in the context of the experience of the UK Railway system between 1993 - 2000; a period that saw the fragmentation of the industry as the privatisation process came to fruition. Particular attention is paid to the utility of Quantitative Risk Assessment techniques, such as Cost benefit Analysis in identifying and informing decisions about risk, in the newly open system that characterised the Rail industry in this period. In this, regard is taken of Charles Perrow’s theories about the inevitability of accidents in systems that are complex and which use advanced technology; an inevitability that leads him to conclude that they are ‘Normal’ accidents. The conclusion is that in the complex and interdependent industries such as the privatised rail industry, such techniques have proven inadequate and inappropriate, due to institutional and organisational failings.&lt;/p&gt;","abstract_has_math":false,"creators":["Smith, Geoffrey Peter"],"institution":"University of Southampton","degree_name":"Ph.D.","degree_level":"doctoral","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":2002,"date_issued":"2002","date_published":"2002","updated_at":"2026-11-19T09:37:25Z","subjects":[],"languages":["English","eng"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":null,"outbound_label":null,"outbound_source":null,"record_url":null,"record_label":null,"record_kind":null,"record_source":null,"download_url":"https://eprints.soton.ac.uk/id/eprint/465301/1/940118.pdf","download_label":"Download PDF","download_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://eprints.soton.ac.uk/cgi/oai2?verb=GetRecord&metadataPrefix=uketd_dc&identifier=oai%3Aeprints.soton.ac.uk%3A465301","prefix":"uketd_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Smith, Geoffrey Peter"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2002"]},{"key":"dc:date.issued","label":"Date","values":["2002"]},{"key":"dc:publisher.commercial","label":"Dc Publisher Commercial","values":["University of Southampton"]},{"key":"dc:publisher.department","label":"Dc Publisher Department","values":["Management (pre 2011 reorg)"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Southampton"]},{"key":"dc:relation.isreferencedby","label":"Dc Relation Isreferencedby","values":["https://eprints.soton.ac.uk/id/eprint/465301/"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["doctoral"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["Ph.D."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["English"]},{"key":"dc:language.dcterms_iso639_2","label":"Language (ISO 639-2)","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://eprints.soton.ac.uk/id/eprint/465301/1/940118.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["<p>The research examines the utility of the scientific perception of risk in the context of the experience of the UK Railway system between 1993 - 2000; a period that saw the fragmentation of the industry as the privatisation process came to fruition. Particular attention is paid to the utility of Quantitative Risk Assessment techniques, such as Cost benefit Analysis in identifying and informing decisions about risk, in the newly open system that characterised the Rail industry in this period. In this, regard is taken of Charles Perrow’s theories about the inevitability of accidents in systems that are complex and which use advanced technology; an inevitability that leads him to conclude that they are ‘Normal’ accidents. The conclusion is that in the complex and interdependent industries such as the privatised rail industry, such techniques have proven inadequate and inappropriate, due to institutional and organisational failings.</p>"]},{"key":"dc:format","label":"Dc Format","values":["text"]},{"key":"dcterms:accessrights","label":"Dcterms Accessrights","values":["public"]},{"key":"dc:title","label":"Title","values":["The UK rail industry 1993-2000 : a case study of risk management across the public-private sector interface"]}]}],"canonical_facts":{"dc:creator":["Smith, Geoffrey Peter"],"dc:date":["2002"],"dc:date.issued":["2002"],"dc:description.abstract":["<p>The research examines the utility of the scientific perception of risk in the context of the experience of the UK Railway system between 1993 - 2000; a period that saw the fragmentation of the industry as the privatisation process came to fruition. Particular attention is paid to the utility of Quantitative Risk Assessment techniques, such as Cost benefit Analysis in identifying and informing decisions about risk, in the newly open system that characterised the Rail industry in this period. In this, regard is taken of Charles Perrow’s theories about the inevitability of accidents in systems that are complex and which use advanced technology; an inevitability that leads him to conclude that they are ‘Normal’ accidents. The conclusion is that in the complex and interdependent industries such as the privatised rail industry, such techniques have proven inadequate and inappropriate, due to institutional and organisational failings.</p>"],"dc:format":["text"],"dc:identifier.uri":["https://eprints.soton.ac.uk/id/eprint/465301/1/940118.pdf"],"dc:language":["English"],"dc:language.dcterms_iso639_2":["eng"],"dc:publisher.commercial":["University of Southampton"],"dc:publisher.department":["Management (pre 2011 reorg)"],"dc:publisher.institution":["University of Southampton"],"dc:relation.isreferencedby":["https://eprints.soton.ac.uk/id/eprint/465301/"],"dcterms:accessrights":["public"],"dc:title":["The UK rail industry 1993-2000 : a case study of risk management across the public-private sector interface"],"dc:type":["Thesis"],"dc:type.qualificationlevel":["doctoral"],"dc:type.qualificationname":["Ph.D."]},"updated_at":"2026-11-19T09:37:25Z"}