{"id":{"repo_id":"soton","oai_identifier":"oai:eprints.soton.ac.uk:72021"},"canonical_url":"https://search.ndltd.org/etd/soton/oai:eprints.soton.ac.uk:72021","repository":{"repo_id":"soton","name":"University of Southampton","base_url":"https://eprints.soton.ac.uk/cgi/oai2"},"display":{"title":"Life cycle cost modelling as an aircraft design decision support tool","abstract":"This report summarizes the work that has been carried out as part of the FLAVIIR project, a 5 year research program looking at technologies for future unmanned air vehicles. A novel classification of aircraft product definition is utilised and a framework to estimate the life cycle cost of aircraft using the product definition is presented. The architecture to estimate the life cycle cost and the associated models are described.<br/>The acquisition costs are estimated using a hierarchical structure and a discrete simulation model is used to estimate the maintenance and operation costs. The acquisition cost model uses an object oriented approach with libraries of materials and processes integrated into the cost model. Risk analysis is performed to identify the important design parameters and uncertainty in the model. The acquisition cost model developed has the capability to estimate the costs of aircraft structures manufactured using metal-based materials as well as non-metal-based materials.<br/>The discrete event simulation model estimates the operation and maintenance costs of a fleet of aircraft using the mission characteristics, aircraft performance and the logistics data as input. The aircraft performance parameters are calculated by using aerodynamic analysis along with performance analysis models and the simulation model utilises a novel methodology to link aircraft performance with survivability analysis for estimating the maintenance costs.<br/>A framework is presented in which the cost models developed can be integrated into the conceptual design process to facilitate the comparison between different configurations. The usage of the life cycle cost framework as a decision support tool is outlined and three case studies are presented which include composites vs metals trade-off analysis, optimisation studies and web deployment for real time cost estimation. The novel contributions of this research are outlined and interesting avenues for future research that can be pursued are identified.","abstract_html":"This report summarizes the work that has been carried out as part of the FLAVIIR project, a 5 year research program looking at technologies for future unmanned air vehicles. A novel classification of aircraft product definition is utilised and a framework to estimate the life cycle cost of aircraft using the product definition is presented. The architecture to estimate the life cycle cost and the associated models are described.&lt;br/&gt;The acquisition costs are estimated using a hierarchical structure and a discrete simulation model is used to estimate the maintenance and operation costs. The acquisition cost model uses an object oriented approach with libraries of materials and processes integrated into the cost model. Risk analysis is performed to identify the important design parameters and uncertainty in the model. The acquisition cost model developed has the capability to estimate the costs of aircraft structures manufactured using metal-based materials as well as non-metal-based materials.&lt;br/&gt;The discrete event simulation model estimates the operation and maintenance costs of a fleet of aircraft using the mission characteristics, aircraft performance and the logistics data as input. The aircraft performance parameters are calculated by using aerodynamic analysis along with performance analysis models and the simulation model utilises a novel methodology to link aircraft performance with survivability analysis for estimating the maintenance costs.&lt;br/&gt;A framework is presented in which the cost models developed can be integrated into the conceptual design process to facilitate the comparison between different configurations. The usage of the life cycle cost framework as a decision support tool is outlined and three case studies are presented which include composites vs metals trade-off analysis, optimisation studies and web deployment for real time cost estimation. The novel contributions of this research are outlined and interesting avenues for future research that can be pursued are identified.","abstract_has_math":false,"creators":["Thokala, Praveen"],"institution":"University of Southampton","degree_name":"Ph.D.","degree_level":"doctoral","degree_discipline":null,"degree_department":null,"school":null,"contributors":[],"advisors":["Scanlan, J.P."],"committee_chairs":[],"committee_members":[],"year":2009,"date_issued":"2009-09","date_published":"2009-09","updated_at":"2026-11-19T09:29:57Z","subjects":[],"languages":["eng"],"rights":[],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":null,"outbound_label":null,"outbound_source":null,"record_url":null,"record_label":null,"record_kind":null,"record_source":null,"download_url":"https://eprints.soton.ac.uk/id/eprint/72021/1/Praveen_Thesis.pdf","download_label":"Download PDF","download_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"https://eprints.soton.ac.uk/cgi/oai2?verb=GetRecord&metadataPrefix=uketd_dc&identifier=oai%3Aeprints.soton.ac.uk%3A72021","prefix":"uketd_dc"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Scanlan, J.P."]},{"key":"dc:creator","label":"Author","values":["Thokala, Praveen"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["2009-09"]},{"key":"dc:date.issued","label":"Date","values":["2009-09"]},{"key":"dc:publisher.department","label":"Dc Publisher Department","values":["Computational Engineering and Design (pre 2011 reorg)","School of Engineering Sciences"]},{"key":"dc:publisher.institution","label":"Dc Publisher Institution","values":["University of Southampton"]},{"key":"dc:relation.isreferencedby","label":"Dc Relation Isreferencedby","values":["https://eprints.soton.ac.uk/id/eprint/72021/"]},{"key":"dc:relation.references","label":"Dc Relation References","values":["[1] R. Curran, S. Raghunathan, and M. Price, \\Review of aerospace engineering cost modelling: The genetic causal approach,\" Progress in Aerospace Sciences, vol. 40, no. 8, pp. 487{534, 2004. [2] K. T. Perkins, R. E. Peterson, and L. Smith, \\Overview of project management,\" The Journal of Defense Software Engineering, vol. 16, no. 1, pp. 4{10, 2003. [3] J. A. Swanson, \\Using nite element analysis for continued product improvement,\" Sound and Vibration Magazine, vol. 40, pp. 34{36, January 2007. [4] F. T. Johnson, E. N. Tinoco, and N. J. Yu, \\Thirty years of development and application of cfd at boeing commercial airplanes, seattle,\" Computers Fluids, vol. 34, no. 10, pp. 1115 { 1151, 2005. [5] G. Boothroyd and P. Dewhurst, Product Design for Manufacture and Assembly. MR-1596, Rand Corporation, 2002. [6] P. Horder, \\Airline operating costs,\" 2003. Managing Aircraft Maintenance Costs Conference, Brussels, January 2003. [7] K.-K. Seo, J.-H. Park, D.-S. Jang, and D. Wallace, \\Prediction of the life cycle cost using statistical and articial neural network methods in conceptual product design,\" Int J Computer Integrated Manufacturing, vol. 15, no. 6, pp. 541{554, 2002. [8] Y. Aseidu and P. Gu, \\Product life cycle cost analysis: State of the art review,\" Int J Prod Res, vol. 36, no. 4, pp. 883{908, 1998. [9] P. Ostwald, Engineering cost estimating. Prentice-Hall, 1992. [10] R. D. Stewart, R. M. Wyskida, and J. D. Johannes, Cost estimator's reference manual. 2. ed., 1995. [11] R. Smith and J. L. Shishko, \\Lessons learned from the space station program: The role of life-cycle cost,\" tech. rep., NASA Technical Report, 2001. [12] Federal Aviation Administration, Life Cycle Cost Estimating Hand-book. FAA, 2nd ed., 2002. [13] J. Scanlan, T. Hill, R. Marsh, C. Bru, M. Dunkley, and P. Cleevely, \\Cost modelling for aircraft design optimization,\" J. Eng. Design, vol. 13, no. 3, pp. 261{269, 2002. [14] R. Roy, S. Kelvesjo, S. Forsberg, and C. Rush, \\Quantitative and qualitative cost estimating for engineering design.,\" J. Eng. Design, vol. 12, no. 2, pp. 147{162, 2001. [15] A. Niazi, J. S. Dai, S. Balabani, and L. Seneviratne, \\Product cost estimation: Technique classification and methodology review,\" Journal of Manufacturing Science and Engineering, vol. 128, no. 2, pp. 563{575, 2006. [16] S. Rehman and M. Guenov, \\A methodology for modelling manufacturing costs at conceptual design,\" Comp Ind Eng, vol. 35, no. 3-4, pp. 623{626, 1998. [17] R. T. Hughes, \\Expert judgement as an estimating method,\" Information and Software Technology, vol. 38, no. 2, pp. 67 { 75, 1996. [18] M. Jorgensen, \\A review of studies on expert estimation of software development effort,\" Journal of Systems and Software, vol. 70, no. 1-2, pp. 37 { 60, 2004. [19] H. A. Bashir and V. Thomson, \\An analogy-based model for estimating design effort,\" Design Studies, vol. 22, no. 2, pp. 157 { 167, 2001. [20] Department of Defence, Parametric estimating handbook. DoD, 2nd ed., 1999. [21] E. B. Dean and R. Unal, \\Elements of designing for cost,\" tech. rep., 1992. [22] E. B. Dean and R. Unal, \\Design for cost and quality: the robust approach,\" J Parametr, vol. 11, no. 1, pp. 73{93, 1991. [23] Rand Corporation, Military jet acquisition: technology basics and cost-estimating methodology. 978-0824705848, Marcel Dekker Ltd, 2001. [24] D. Ben-Arieh and Q. Li, \\Activity-based cost management for design and development stage,\" Int. J. Prod. Economics, vol. 83, pp. 169{183, 2003. [25] K. Ehrlenspiel, A. Kiewert, U. Lindemann, and M. S. Hundal, Cost-efficient design. 2007. [26] J. Innes and F. Mitchell, \\A survey of activity-based costing in the u.k.'s largest companies,\" Management Accounting Research, vol. 6, no. 2, pp. 137 { 153, 1995. [27] V. Narayanan and R. G. Sarkar, \\The impact of activity-based costing on managerial decisions at insteel industries-a eld study,\" Journal of Economics & Management Strategy, vol. 11, pp. 257{288, 06 2002. [28] K. Tornberg, M. Jamsen, and J. Paranko, \\Activity-based costing and process modeling for cost-conscious product design: A case study in a manufacturing company,\" International Journal of Production Economics, vol. 79, no. 1, pp. 75 { 82, 2002. [29] M. C. Andrade, R. C. Pessanha Filho, A. M. Espozel, L. O. A. Maia,and R. Y. Qassim, \\Activity-based costing for production learning,\" International Journal of Production Economics, vol. 62, pp. 175{180, September 1999. [30] M. J. F. Wouters, \\Decision orientation of activity-based costing,\" International Journal of Production Economics, vol. 36, pp. 75{84, August 1994. [31] L. Qian and D. Ben-Arieh, \\Parametric cost estimation based on activity-based costing: A case study for design and development of rotational parts,\" International Journal of Production Economics, vol. 113, no. 2, pp. 805 { 818, 2008. Special Section on Advanced Modeling and Innovative Design of Supply Chain. [32] T. A. Spedding and G. Q. Sun, \\Application of discrete event simulation to the activity based costing of manufacturing systems,\" International Journal of Production Economics, vol. 58, no. 3, pp. 289 { 301,1999. [33] J. Bode, \\Decision support with neural networks in the management of research and development concepts and application to cost estimation,\" Inf and Management, vol. 34, pp. 33{40, 1998. [34] J. Bode, \\Neural networks for cost estimation: simulations and pilot application,\" Int J Prod Res, vol. 38, no. 6, pp. 1231{1254, 2000. [35] A. Layer, E. T. Brinke, F. H. Houten, H. Kals, and S. Haasis, \\Recent and future trends in cost estimation,\" Int. J. Computer Integrated Manufacturing, vol. 15, no. 6, pp. 499{510, 2002. [36] C. Rush and R. Roy, \\Expert judgement in cost estimating: modelling the reasoning process,\" Conc. Eng. Res Appl (CERA), vol. 9, no. 4, 2001. [37] J. Scanlan, A. Rao, P. H. Christophe Bru, and R. Marsh, \\Datum project: Cost estimating environment for support of aerospace design decision making,\" AIAA Journal of Aircraft, vol. 43, no. 4, pp. 1022{1029, 2006. [38] L. Ping, H. Yontong, J. Bode, and R. Shoju, \\Multi-agent system for cost estimation,\" Comp Ind Eng, vol. 31, no. 3/4, pp. 731{755, 1996. [39] P. Watson, R. Curran, A. Murphy, and S. Cowan, \\Cost estimation of machined parts within an aerospace supply chain,\" Conc. Eng. Res Appl (CERA), vol. 14, no. 1, pp. 17{26, 2006. [40] B. J. Hicks, S. J. Culley, and G. Mullineux, \\Cost estimation for standard components and systems in the early phases of the design process,\" J. Eng. Design, vol. 13, no. 4, pp. 271{292, 2002. [41] D. Ben-Arieh, \\Cost estimation system for machined parts,\" Int J Prod Res, vol. 38, no. 17, pp. 4481{4494, 2000. [42] D. J. Stockton, R. Forster, and B. Messner, \\Developing time estimating models for advanced composite manufacturing processes,\" Aircraft Engineering and Aerospace Technology, vol. 70, no. 6, pp. 445{450,1998. [43] Y. Wei and P. J. Egbelu, \\A framework for estimating manufacturing cost from geometric design data,\" Int. J. Computer Integrated Manufacturing, vol. 13, no. 1, pp. 50{63, 2000. [44] C. X. Feng, A. Kusiak, and C. Huang, \\Cost evaluation in design with form features,\" Computer-Aided Design, vol. 28, no. 11, pp. 879{885, 1996. [45] U. A. Kulkarni and H. P. Bao, \\Close-loop cost equation for objects manufactured by milling,\" J. of Manf. Sci and Engg, vol. 125, pp. 436{448, 2003. [46] J. Park and T. W. Simpson, \\Development of a production cost estimation framework to support product family design,\" Int J Prod Res, vol. 43, pp. 731{772, 15 Feb 2005. [47] D. Ben-Arieh and Q. Li, \\Web-based cost estimation of machining rotational parts,\" Production planning and control, vol. 14, no. 8, pp. 778{788, 2003. [48] Y. Liu and H. A. Basson, \\Interfacing cad and manufacturing cost estimation software using com/ole,\" in Proceedings of the International CIRP Design Seminar, KTH Stockholm, Sweden, 6-8 June 2001, PP. 289-294, pp. 289{294, 2001. [49] S. O. Duua and A. A. Andijani, \\An integrated simulation model for effective planning of maintenance operations for saudi arabian airlines (saudia),\" Production Planning and Control, vol. 10, no. 6, pp. 579{584, 1999. [50] A. Andijani and S. Duua, \\Critical evaluation of simulation studies in maintenance systems,\" Production Planning and Control,, vol. 13, no. 4, pp. 336{341, 2002. [51] Civil Aviation Authority , Light A/C Maintenance Schedules. CAP 411, UK Civil Aviation Authority, 2005. [52] Civil Aviation Authority , Light Aircraft Maintenance. CAP 520, UK Civil Aviation Authority, 2005. [53] D. J. Edwards, G. D. Holt, and F. C. Harris, \\Estimating life cycle plant maintenance costs,\" Construction Management & Economics, vol. 18, pp. 427{435, June 2000. available at http://ideas.repec.org/a/taf/conmgt/v18y2000i4p427-435.html. [54] A. A. Ghobbar and C. H. Friend, \\Evaluation of forecasting methods for intermittent parts demand in the eld of aviation: a predictive model,\" Comput. Oper. Res., vol. 30, no. 14, pp. 2097{2114, 2003. [55] J. S. Kong and D. M. Frangopol, \\Evaluation of expected life-cycle maintenance cost of deteriorating structures,\" Journal of Structural Engineering, vol. 129, pp. 682{691, 2003. [56] D. M. Frangopol and M. Liu, \\Maintenance and management of civil infrastructure based on condition, safety, optimization, and life-cycle cost,\" Journal of Structure and Infrastructure Engineering, vol. 3, no. 14, pp. 29{41, 2007. [57] J. Guarnieri, A. W. Johnson, and S. M. Swartz, \\A maintenance resources capacity estimator,\" Journal of the Operational Research Society,, vol. 57, no. 10, pp. 1188{1196, 2006. [58] A. B. Jambekar, \\A systems thinking perspective of maintenance, operations, and process quality,\" Journal of Quality in Maintenance,vol. 6, no. 2, pp. 123{132, 2000. [59] A. M. Law and D. M. Kelton, Simulation Modeling and Analysis. McGraw-Hill Higher Education, 1999. [60] R. R. Hill and G. A. McIntyre, \\Applications of discrete event simulation modeling to military problems,\" in Proceedings of the 2001 Winter Simulation Conference, pp. 780{788, Winter Simulation Conference, 2001. [61] J. H. Keeney, \\Detailed simulation of military aircraft operations and logistics,\" in Proceedings of the fourth annual conference on Applications of simulation, pp. 32{38, Winter Simulation Conference, 1970. [62] R. Cobb, \\Modeling aircraft repair turntime - simulation supports maintenance marketing eorts,\" Journal of Air Transport Management, vol. 2, pp. 25{32, 1995. [63] T. N. Cook and R. C. DiNicola, \\Modeling combat maintenance operations,\" IEEE Proceedings Annual Reliability and Maintenability Symposium, pp. 390{395, 1984. [64] K. V. Ville Mattila and T. Raivio, \\A simulation model for aircraft maintenance in an uncertain operational environment,\" in Proceedings 17th European Simulation Multiconference, SCS Europe BVBA, 2003 ISBN 3-936150-25-7, 2003. [65] K. S. Upadhya and N. K. Srinivasan, \\System simulation for availability of weapon systems under various missions,\" Syst. Eng., vol. 8, no. 4, pp. 309{322, 2005. [66] K. S. Upadhya and N. K. Srinivasan, \\Availability of weapon systems with multiple failures and logistic delays,\" International Journal of Quality and Reliability Management., vol. 20, no. 7, 2003. [67] K. S. Upadhya and N. K. Srinivasan, \\A simulation model for availability under battlefield conditions,,\" Simulation., vol. 74, no. 3, 2000. [68] E. D. Adamides, Y. A. Stamboulis, and A. G. Varelis, \\Model-based assessment of military aircraft engine maintenance systems,\" Journal of the Operational Research Society, vol. 55, pp. 957{967(11), September 2004. [69] T. E. El-Diraby, \\Web-services environment for collaborative management of product life-cycle costs,,\" Journal of Construction Engineering and Management., vol. 132, no. 3, pp. 300{313), 2006. [70] M. Sandberg, P. Boart, and T. Larsson, \\Functional product life-cycle simulation model for cost estimation in conceptual design of jet engine components,,\" Journal of Concurrent Engineering., vol. 13, no. 4, pp. 331{342), 2005. [71] W. J. Marx, D. N. Mavris, and D. P. Schrage, \\Integrating design and manufacturing for a high speed civil transport wing,\" 1994. [72] W. J. Marx, D. N. Mavris, and D. P. Schrage, \\A hierarchical aircraft life cycle cost analysis model,\" AIAA, 1995. 196 73] W. J. Marx, D. N. Mavris, and D. P. Schrage, \\Effects of alternative wing structural concepts on high speed civil transport airport life cycle costs,\" 1996. [74] H. H. Jo, H. R. Parsaei, and W. G. Sullivan, \\Principles of concurrent engineering,\" Concurrent Engineering: Contemporary Issues and Modern Design Tools, 1993. [75] R. Roy and C. Rush, \\Analysis of cost estimating processes used within a concurrent engineering environment throughout a product life cycle,\" pp. 58{67, Technomic, 2000. [76] J. H. Park and K. K. Seo, \\Incorporating life-cycle cost into early product development,\" J. Eng. Manf., vol. 218, pp. 1059{1066, 2004. [77] E. T. Brinke, E. Lutters, T. Streppel, and H. Kals, \\Cost estimation architecture for integrated cost control based on information management.,\" Int. J. Computer Integrated Manufacturing, vol. 17, no. 6, pp. 534{545, 2004. [78] A. Kusiak, \\Integrated product and process design: a modularity perspective,\" J. Eng. Design, vol. 13, no. 3, pp. 223{231, 2002. [79] I. F. Weustink, E. Brinke, A. H. Streppel, and H. J. Kals, \\A generic framework for cost estimation and cost control in product design,\" Journal of Materials Processing Technology, vol. 103, pp. 141{148, 2000. [80] D. S. K. Chan and P. W. Lewis, \\The integration of manufacturing and cost information into the engineering design process,\" Int J Prod Res, vol. 2000, no. 38, pp. 4413{4427, 2000. [81] R. G. Chogule and B. Ravi, \\Casting cost estimation in an integrated product and process design environment,\" Int. J. Computer Integrated Manufacturing, vol. 19, no. 7, pp. 676{688, 2006. [82] D. Barlow, C. Howe, G. Clayton, and S. Brouwer, \\Preliminary study on cost optimisation of aircraft composite structures applicable to liquid moulding technologies,\" Composite Structures, vol. 57, pp. 53{57, 2002. [83] J. Hackney and R. Neufville, \\Life cycle model of alternative fuel vehicles: emissions, energy and cost trade-offs,\" Transportation Research, vol. 35, pp. 243{266, 2001. [84] R. Bibikam, S. P. Lukachko, and A. I. Waitz, \\The historical fuel efficiency characteristics of regional aircraft from technological, operational and cost perspectives,\" Journal of Air Transport Management, vol. 8, pp. 389{400, 2002. [85] R. Curran, A. Kundu, S. Ragunathan, and R. McFadden, \\Impact of aerodynamic surface tolerance on aircraft cost driver,\" J. Aerospace Engg., vol. 216, no. G, pp. 29{39, 2001. [86] R. Curran, A. Kundu, S. Ragunathan, D. Eakin, and R. McFadden, Influence of manufacturing tolerance on aircraft direct operating cost (doc),\" J. of Materials Processing Technology, vol. 138, pp. 208{213, 2003. [87] G. B. Bruening, \\The potential impact of utilizing advanced engine technology for a combat capable unmanned air vehicle (uav),\" J. Eng. for Gas Turbines, vol. 123, pp. 508{512, 2001. [88] S. Metschan, \\Validated feasibility study of integrally stiffened metallic fuselage panels for reducing manufacturing costs,\" tech. rep., Boeing, Seattle, WA, 2000. [89] B. Vermuelen and M. J. L. van Tooren, \\Design case study for a comparitive performance analysis of aerospace materials,\" Materials and Design, pp. 10{20, 2006. [90] P. H. Bao and A. J. Samareh, \\Affordable design: A methodology to implement process-based manufacturing cost models into the traditional performance-focused multidisciplinary design optimization,\" AIAA, no. 4839, 2000. [91] K. Gantois and A. J. Morris, \\The multi-disciplinary design of a largescale civil aircraft wing taking into account of manufacturing costs,\" Struct. Multidisc. Optim, vol. 28, pp. 31{46, 2004. [92] B. Prasad, \\A model for optimizing performance based on reliability, life-cycle costs and other measurements,\" Production planning and control, vol. 10, no. 3, pp. 286{300, 1999. [93] R. Curran, M. Price, S. Raghunathan, E. Benard, S. Crosby, S. Castagne, and P. Mawhinney, \\Integrating aircraft cost modeling into conceptual design.,\" Concurrent Engineering: RA, vol. 13, no. 4, pp. 321{330, 2005. [94] S. M. Al-Ahmed, Integration Combat Eectiveness Disciplines into the Aircraft Conceptual/Preliminanj Design. PhD thesis, Craneld University, College of Aeronatics, 1996. [95"]},{"key":"dc:type","label":"Dc Type","values":["Thesis"]},{"key":"dc:type.qualificationlevel","label":"Dc Type Qualificationlevel","values":["doctoral"]},{"key":"dc:type.qualificationname","label":"Dc Type Qualificationname","values":["Ph.D."]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language.dcterms_iso639_2","label":"Language (ISO 639-2)","values":["eng"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://eprints.soton.ac.uk/id/eprint/72021/1/Praveen_Thesis.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["This report summarizes the work that has been carried out as part of the FLAVIIR project, a 5 year research program looking at technologies for future unmanned air vehicles. A novel classification of aircraft product definition is utilised and a framework to estimate the life cycle cost of aircraft using the product definition is presented. The architecture to estimate the life cycle cost and the associated models are described.<br/>The acquisition costs are estimated using a hierarchical structure and a discrete simulation model is used to estimate the maintenance and operation costs. The acquisition cost model uses an object oriented approach with libraries of materials and processes integrated into the cost model. Risk analysis is performed to identify the important design parameters and uncertainty in the model. The acquisition cost model developed has the capability to estimate the costs of aircraft structures manufactured using metal-based materials as well as non-metal-based materials.<br/>The discrete event simulation model estimates the operation and maintenance costs of a fleet of aircraft using the mission characteristics, aircraft performance and the logistics data as input. The aircraft performance parameters are calculated by using aerodynamic analysis along with performance analysis models and the simulation model utilises a novel methodology to link aircraft performance with survivability analysis for estimating the maintenance costs.<br/>A framework is presented in which the cost models developed can be integrated into the conceptual design process to facilitate the comparison between different configurations. The usage of the life cycle cost framework as a decision support tool is outlined and three case studies are presented which include composites vs metals trade-off analysis, optimisation studies and web deployment for real time cost estimation. The novel contributions of this research are outlined and interesting avenues for future research that can be pursued are identified."]},{"key":"dc:format","label":"Dc Format","values":["text"]},{"key":"dcterms:accessrights","label":"Dcterms Accessrights","values":["public"]},{"key":"dc:title","label":"Title","values":["Life cycle cost modelling as an aircraft design decision support tool"]}]}],"canonical_facts":{"dc:contributor.advisor":["Scanlan, J.P."],"dc:creator":["Thokala, Praveen"],"dc:date":["2009-09"],"dc:date.issued":["2009-09"],"dc:description.abstract":["This report summarizes the work that has been carried out as part of the FLAVIIR project, a 5 year research program looking at technologies for future unmanned air vehicles. A novel classification of aircraft product definition is utilised and a framework to estimate the life cycle cost of aircraft using the product definition is presented. The architecture to estimate the life cycle cost and the associated models are described.<br/>The acquisition costs are estimated using a hierarchical structure and a discrete simulation model is used to estimate the maintenance and operation costs. The acquisition cost model uses an object oriented approach with libraries of materials and processes integrated into the cost model. Risk analysis is performed to identify the important design parameters and uncertainty in the model. The acquisition cost model developed has the capability to estimate the costs of aircraft structures manufactured using metal-based materials as well as non-metal-based materials.<br/>The discrete event simulation model estimates the operation and maintenance costs of a fleet of aircraft using the mission characteristics, aircraft performance and the logistics data as input. The aircraft performance parameters are calculated by using aerodynamic analysis along with performance analysis models and the simulation model utilises a novel methodology to link aircraft performance with survivability analysis for estimating the maintenance costs.<br/>A framework is presented in which the cost models developed can be integrated into the conceptual design process to facilitate the comparison between different configurations. The usage of the life cycle cost framework as a decision support tool is outlined and three case studies are presented which include composites vs metals trade-off analysis, optimisation studies and web deployment for real time cost estimation. The novel contributions of this research are outlined and interesting avenues for future research that can be pursued are identified."],"dc:format":["text"],"dc:identifier.uri":["https://eprints.soton.ac.uk/id/eprint/72021/1/Praveen_Thesis.pdf"],"dc:language.dcterms_iso639_2":["eng"],"dc:publisher.department":["Computational Engineering and Design (pre 2011 reorg)","School of Engineering Sciences"],"dc:publisher.institution":["University of Southampton"],"dc:relation.isreferencedby":["https://eprints.soton.ac.uk/id/eprint/72021/"],"dc:relation.references":["[1] R. Curran, S. Raghunathan, and M. Price, \\Review of aerospace engineering cost modelling: The genetic causal approach,\" Progress in Aerospace Sciences, vol. 40, no. 8, pp. 487{534, 2004. [2] K. T. Perkins, R. E. Peterson, and L. Smith, \\Overview of project management,\" The Journal of Defense Software Engineering, vol. 16, no. 1, pp. 4{10, 2003. [3] J. A. Swanson, \\Using nite element analysis for continued product improvement,\" Sound and Vibration Magazine, vol. 40, pp. 34{36, January 2007. [4] F. T. Johnson, E. N. Tinoco, and N. J. Yu, \\Thirty years of development and application of cfd at boeing commercial airplanes, seattle,\" Computers Fluids, vol. 34, no. 10, pp. 1115 { 1151, 2005. [5] G. Boothroyd and P. Dewhurst, Product Design for Manufacture and Assembly. MR-1596, Rand Corporation, 2002. [6] P. Horder, \\Airline operating costs,\" 2003. Managing Aircraft Maintenance Costs Conference, Brussels, January 2003. [7] K.-K. Seo, J.-H. Park, D.-S. Jang, and D. Wallace, \\Prediction of the life cycle cost using statistical and articial neural network methods in conceptual product design,\" Int J Computer Integrated Manufacturing, vol. 15, no. 6, pp. 541{554, 2002. [8] Y. Aseidu and P. Gu, \\Product life cycle cost analysis: State of the art review,\" Int J Prod Res, vol. 36, no. 4, pp. 883{908, 1998. [9] P. Ostwald, Engineering cost estimating. Prentice-Hall, 1992. [10] R. D. Stewart, R. M. Wyskida, and J. D. Johannes, Cost estimator's reference manual. 2. ed., 1995. [11] R. Smith and J. L. Shishko, \\Lessons learned from the space station program: The role of life-cycle cost,\" tech. rep., NASA Technical Report, 2001. [12] Federal Aviation Administration, Life Cycle Cost Estimating Hand-book. FAA, 2nd ed., 2002. [13] J. Scanlan, T. Hill, R. Marsh, C. Bru, M. Dunkley, and P. Cleevely, \\Cost modelling for aircraft design optimization,\" J. Eng. Design, vol. 13, no. 3, pp. 261{269, 2002. [14] R. Roy, S. Kelvesjo, S. Forsberg, and C. Rush, \\Quantitative and qualitative cost estimating for engineering design.,\" J. Eng. Design, vol. 12, no. 2, pp. 147{162, 2001. [15] A. Niazi, J. S. Dai, S. Balabani, and L. Seneviratne, \\Product cost estimation: Technique classification and methodology review,\" Journal of Manufacturing Science and Engineering, vol. 128, no. 2, pp. 563{575, 2006. [16] S. Rehman and M. Guenov, \\A methodology for modelling manufacturing costs at conceptual design,\" Comp Ind Eng, vol. 35, no. 3-4, pp. 623{626, 1998. [17] R. T. Hughes, \\Expert judgement as an estimating method,\" Information and Software Technology, vol. 38, no. 2, pp. 67 { 75, 1996. [18] M. Jorgensen, \\A review of studies on expert estimation of software development effort,\" Journal of Systems and Software, vol. 70, no. 1-2, pp. 37 { 60, 2004. [19] H. A. Bashir and V. Thomson, \\An analogy-based model for estimating design effort,\" Design Studies, vol. 22, no. 2, pp. 157 { 167, 2001. [20] Department of Defence, Parametric estimating handbook. DoD, 2nd ed., 1999. [21] E. B. Dean and R. Unal, \\Elements of designing for cost,\" tech. rep., 1992. [22] E. B. Dean and R. Unal, \\Design for cost and quality: the robust approach,\" J Parametr, vol. 11, no. 1, pp. 73{93, 1991. [23] Rand Corporation, Military jet acquisition: technology basics and cost-estimating methodology. 978-0824705848, Marcel Dekker Ltd, 2001. [24] D. Ben-Arieh and Q. Li, \\Activity-based cost management for design and development stage,\" Int. J. Prod. Economics, vol. 83, pp. 169{183, 2003. [25] K. Ehrlenspiel, A. Kiewert, U. Lindemann, and M. S. Hundal, Cost-efficient design. 2007. [26] J. Innes and F. Mitchell, \\A survey of activity-based costing in the u.k.'s largest companies,\" Management Accounting Research, vol. 6, no. 2, pp. 137 { 153, 1995. [27] V. Narayanan and R. G. Sarkar, \\The impact of activity-based costing on managerial decisions at insteel industries-a eld study,\" Journal of Economics & Management Strategy, vol. 11, pp. 257{288, 06 2002. [28] K. Tornberg, M. Jamsen, and J. Paranko, \\Activity-based costing and process modeling for cost-conscious product design: A case study in a manufacturing company,\" International Journal of Production Economics, vol. 79, no. 1, pp. 75 { 82, 2002. [29] M. C. Andrade, R. C. Pessanha Filho, A. M. Espozel, L. O. A. Maia,and R. Y. Qassim, \\Activity-based costing for production learning,\" International Journal of Production Economics, vol. 62, pp. 175{180, September 1999. [30] M. J. F. Wouters, \\Decision orientation of activity-based costing,\" International Journal of Production Economics, vol. 36, pp. 75{84, August 1994. [31] L. Qian and D. Ben-Arieh, \\Parametric cost estimation based on activity-based costing: A case study for design and development of rotational parts,\" International Journal of Production Economics, vol. 113, no. 2, pp. 805 { 818, 2008. Special Section on Advanced Modeling and Innovative Design of Supply Chain. [32] T. A. Spedding and G. Q. Sun, \\Application of discrete event simulation to the activity based costing of manufacturing systems,\" International Journal of Production Economics, vol. 58, no. 3, pp. 289 { 301,1999. [33] J. Bode, \\Decision support with neural networks in the management of research and development concepts and application to cost estimation,\" Inf and Management, vol. 34, pp. 33{40, 1998. [34] J. Bode, \\Neural networks for cost estimation: simulations and pilot application,\" Int J Prod Res, vol. 38, no. 6, pp. 1231{1254, 2000. [35] A. Layer, E. T. Brinke, F. H. Houten, H. Kals, and S. Haasis, \\Recent and future trends in cost estimation,\" Int. J. Computer Integrated Manufacturing, vol. 15, no. 6, pp. 499{510, 2002. [36] C. Rush and R. Roy, \\Expert judgement in cost estimating: modelling the reasoning process,\" Conc. Eng. Res Appl (CERA), vol. 9, no. 4, 2001. [37] J. Scanlan, A. Rao, P. H. Christophe Bru, and R. Marsh, \\Datum project: Cost estimating environment for support of aerospace design decision making,\" AIAA Journal of Aircraft, vol. 43, no. 4, pp. 1022{1029, 2006. [38] L. Ping, H. Yontong, J. Bode, and R. Shoju, \\Multi-agent system for cost estimation,\" Comp Ind Eng, vol. 31, no. 3/4, pp. 731{755, 1996. [39] P. Watson, R. Curran, A. Murphy, and S. Cowan, \\Cost estimation of machined parts within an aerospace supply chain,\" Conc. Eng. Res Appl (CERA), vol. 14, no. 1, pp. 17{26, 2006. [40] B. J. Hicks, S. J. Culley, and G. Mullineux, \\Cost estimation for standard components and systems in the early phases of the design process,\" J. Eng. Design, vol. 13, no. 4, pp. 271{292, 2002. [41] D. Ben-Arieh, \\Cost estimation system for machined parts,\" Int J Prod Res, vol. 38, no. 17, pp. 4481{4494, 2000. [42] D. J. Stockton, R. Forster, and B. Messner, \\Developing time estimating models for advanced composite manufacturing processes,\" Aircraft Engineering and Aerospace Technology, vol. 70, no. 6, pp. 445{450,1998. [43] Y. Wei and P. J. Egbelu, \\A framework for estimating manufacturing cost from geometric design data,\" Int. J. Computer Integrated Manufacturing, vol. 13, no. 1, pp. 50{63, 2000. [44] C. X. Feng, A. Kusiak, and C. Huang, \\Cost evaluation in design with form features,\" Computer-Aided Design, vol. 28, no. 11, pp. 879{885, 1996. [45] U. A. Kulkarni and H. P. Bao, \\Close-loop cost equation for objects manufactured by milling,\" J. of Manf. Sci and Engg, vol. 125, pp. 436{448, 2003. [46] J. Park and T. W. Simpson, \\Development of a production cost estimation framework to support product family design,\" Int J Prod Res, vol. 43, pp. 731{772, 15 Feb 2005. [47] D. Ben-Arieh and Q. Li, \\Web-based cost estimation of machining rotational parts,\" Production planning and control, vol. 14, no. 8, pp. 778{788, 2003. [48] Y. Liu and H. A. Basson, \\Interfacing cad and manufacturing cost estimation software using com/ole,\" in Proceedings of the International CIRP Design Seminar, KTH Stockholm, Sweden, 6-8 June 2001, PP. 289-294, pp. 289{294, 2001. [49] S. O. Duua and A. A. Andijani, \\An integrated simulation model for effective planning of maintenance operations for saudi arabian airlines (saudia),\" Production Planning and Control, vol. 10, no. 6, pp. 579{584, 1999. [50] A. Andijani and S. Duua, \\Critical evaluation of simulation studies in maintenance systems,\" Production Planning and Control,, vol. 13, no. 4, pp. 336{341, 2002. [51] Civil Aviation Authority , Light A/C Maintenance Schedules. CAP 411, UK Civil Aviation Authority, 2005. [52] Civil Aviation Authority , Light Aircraft Maintenance. CAP 520, UK Civil Aviation Authority, 2005. [53] D. J. Edwards, G. D. Holt, and F. C. Harris, \\Estimating life cycle plant maintenance costs,\" Construction Management & Economics, vol. 18, pp. 427{435, June 2000. available at http://ideas.repec.org/a/taf/conmgt/v18y2000i4p427-435.html. [54] A. A. Ghobbar and C. H. Friend, \\Evaluation of forecasting methods for intermittent parts demand in the eld of aviation: a predictive model,\" Comput. Oper. Res., vol. 30, no. 14, pp. 2097{2114, 2003. [55] J. S. Kong and D. M. Frangopol, \\Evaluation of expected life-cycle maintenance cost of deteriorating structures,\" Journal of Structural Engineering, vol. 129, pp. 682{691, 2003. [56] D. M. Frangopol and M. Liu, \\Maintenance and management of civil infrastructure based on condition, safety, optimization, and life-cycle cost,\" Journal of Structure and Infrastructure Engineering, vol. 3, no. 14, pp. 29{41, 2007. [57] J. Guarnieri, A. W. Johnson, and S. M. Swartz, \\A maintenance resources capacity estimator,\" Journal of the Operational Research Society,, vol. 57, no. 10, pp. 1188{1196, 2006. [58] A. B. Jambekar, \\A systems thinking perspective of maintenance, operations, and process quality,\" Journal of Quality in Maintenance,vol. 6, no. 2, pp. 123{132, 2000. [59] A. M. Law and D. M. Kelton, Simulation Modeling and Analysis. McGraw-Hill Higher Education, 1999. [60] R. R. Hill and G. A. McIntyre, \\Applications of discrete event simulation modeling to military problems,\" in Proceedings of the 2001 Winter Simulation Conference, pp. 780{788, Winter Simulation Conference, 2001. [61] J. H. Keeney, \\Detailed simulation of military aircraft operations and logistics,\" in Proceedings of the fourth annual conference on Applications of simulation, pp. 32{38, Winter Simulation Conference, 1970. [62] R. Cobb, \\Modeling aircraft repair turntime - simulation supports maintenance marketing eorts,\" Journal of Air Transport Management, vol. 2, pp. 25{32, 1995. [63] T. N. Cook and R. C. DiNicola, \\Modeling combat maintenance operations,\" IEEE Proceedings Annual Reliability and Maintenability Symposium, pp. 390{395, 1984. [64] K. V. Ville Mattila and T. Raivio, \\A simulation model for aircraft maintenance in an uncertain operational environment,\" in Proceedings 17th European Simulation Multiconference, SCS Europe BVBA, 2003 ISBN 3-936150-25-7, 2003. [65] K. S. Upadhya and N. K. Srinivasan, \\System simulation for availability of weapon systems under various missions,\" Syst. Eng., vol. 8, no. 4, pp. 309{322, 2005. [66] K. S. Upadhya and N. K. Srinivasan, \\Availability of weapon systems with multiple failures and logistic delays,\" International Journal of Quality and Reliability Management., vol. 20, no. 7, 2003. [67] K. S. Upadhya and N. K. Srinivasan, \\A simulation model for availability under battlefield conditions,,\" Simulation., vol. 74, no. 3, 2000. [68] E. D. Adamides, Y. A. Stamboulis, and A. G. Varelis, \\Model-based assessment of military aircraft engine maintenance systems,\" Journal of the Operational Research Society, vol. 55, pp. 957{967(11), September 2004. [69] T. E. El-Diraby, \\Web-services environment for collaborative management of product life-cycle costs,,\" Journal of Construction Engineering and Management., vol. 132, no. 3, pp. 300{313), 2006. [70] M. Sandberg, P. Boart, and T. Larsson, \\Functional product life-cycle simulation model for cost estimation in conceptual design of jet engine components,,\" Journal of Concurrent Engineering., vol. 13, no. 4, pp. 331{342), 2005. [71] W. J. Marx, D. N. Mavris, and D. P. Schrage, \\Integrating design and manufacturing for a high speed civil transport wing,\" 1994. [72] W. J. Marx, D. N. Mavris, and D. P. Schrage, \\A hierarchical aircraft life cycle cost analysis model,\" AIAA, 1995. 196 73] W. J. Marx, D. N. Mavris, and D. P. Schrage, \\Effects of alternative wing structural concepts on high speed civil transport airport life cycle costs,\" 1996. [74] H. H. Jo, H. R. Parsaei, and W. G. Sullivan, \\Principles of concurrent engineering,\" Concurrent Engineering: Contemporary Issues and Modern Design Tools, 1993. [75] R. Roy and C. Rush, \\Analysis of cost estimating processes used within a concurrent engineering environment throughout a product life cycle,\" pp. 58{67, Technomic, 2000. [76] J. H. Park and K. K. Seo, \\Incorporating life-cycle cost into early product development,\" J. Eng. Manf., vol. 218, pp. 1059{1066, 2004. [77] E. T. Brinke, E. Lutters, T. Streppel, and H. Kals, \\Cost estimation architecture for integrated cost control based on information management.,\" Int. J. Computer Integrated Manufacturing, vol. 17, no. 6, pp. 534{545, 2004. [78] A. Kusiak, \\Integrated product and process design: a modularity perspective,\" J. Eng. Design, vol. 13, no. 3, pp. 223{231, 2002. [79] I. F. Weustink, E. Brinke, A. H. Streppel, and H. J. Kals, \\A generic framework for cost estimation and cost control in product design,\" Journal of Materials Processing Technology, vol. 103, pp. 141{148, 2000. [80] D. S. K. Chan and P. W. Lewis, \\The integration of manufacturing and cost information into the engineering design process,\" Int J Prod Res, vol. 2000, no. 38, pp. 4413{4427, 2000. [81] R. G. Chogule and B. Ravi, \\Casting cost estimation in an integrated product and process design environment,\" Int. J. Computer Integrated Manufacturing, vol. 19, no. 7, pp. 676{688, 2006. [82] D. Barlow, C. Howe, G. Clayton, and S. Brouwer, \\Preliminary study on cost optimisation of aircraft composite structures applicable to liquid moulding technologies,\" Composite Structures, vol. 57, pp. 53{57, 2002. [83] J. Hackney and R. Neufville, \\Life cycle model of alternative fuel vehicles: emissions, energy and cost trade-offs,\" Transportation Research, vol. 35, pp. 243{266, 2001. [84] R. Bibikam, S. P. Lukachko, and A. I. Waitz, \\The historical fuel efficiency characteristics of regional aircraft from technological, operational and cost perspectives,\" Journal of Air Transport Management, vol. 8, pp. 389{400, 2002. [85] R. Curran, A. Kundu, S. Ragunathan, and R. McFadden, \\Impact of aerodynamic surface tolerance on aircraft cost driver,\" J. Aerospace Engg., vol. 216, no. G, pp. 29{39, 2001. [86] R. Curran, A. Kundu, S. Ragunathan, D. Eakin, and R. McFadden, Influence of manufacturing tolerance on aircraft direct operating cost (doc),\" J. of Materials Processing Technology, vol. 138, pp. 208{213, 2003. [87] G. B. Bruening, \\The potential impact of utilizing advanced engine technology for a combat capable unmanned air vehicle (uav),\" J. Eng. for Gas Turbines, vol. 123, pp. 508{512, 2001. [88] S. Metschan, \\Validated feasibility study of integrally stiffened metallic fuselage panels for reducing manufacturing costs,\" tech. rep., Boeing, Seattle, WA, 2000. [89] B. Vermuelen and M. J. L. van Tooren, \\Design case study for a comparitive performance analysis of aerospace materials,\" Materials and Design, pp. 10{20, 2006. [90] P. H. Bao and A. J. Samareh, \\Affordable design: A methodology to implement process-based manufacturing cost models into the traditional performance-focused multidisciplinary design optimization,\" AIAA, no. 4839, 2000. [91] K. Gantois and A. J. Morris, \\The multi-disciplinary design of a largescale civil aircraft wing taking into account of manufacturing costs,\" Struct. Multidisc. Optim, vol. 28, pp. 31{46, 2004. [92] B. Prasad, \\A model for optimizing performance based on reliability, life-cycle costs and other measurements,\" Production planning and control, vol. 10, no. 3, pp. 286{300, 1999. [93] R. Curran, M. Price, S. Raghunathan, E. Benard, S. Crosby, S. Castagne, and P. Mawhinney, \\Integrating aircraft cost modeling into conceptual design.,\" Concurrent Engineering: RA, vol. 13, no. 4, pp. 321{330, 2005. [94] S. M. Al-Ahmed, Integration Combat Eectiveness Disciplines into the Aircraft Conceptual/Preliminanj Design. PhD thesis, Craneld University, College of Aeronatics, 1996. [95"],"dcterms:accessrights":["public"],"dc:title":["Life cycle cost modelling as an aircraft design decision support tool"],"dc:type":["Thesis"],"dc:type.qualificationlevel":["doctoral"],"dc:type.qualificationname":["Ph.D."]},"updated_at":"2026-11-19T09:29:57Z"}