{"id":{"repo_id":"st-cloud","oai_identifier":"oai:repository.stcloudstate.edu:20.500.14755/2025"},"canonical_url":"https://search.ndltd.org/etd/st-cloud/oai:repository.stcloudstate.edu:20.500.14755/2025","repository":{"repo_id":"st-cloud","name":"St. Cloud State University","base_url":"https://repository.stcloudstate.edu/server/oai/request"},"display":{"title":"Improving the Run Rate of Mobile Mapping Project","abstract":"Synechron works for customer who is leading manufacturer of automotive navigation system. An automotive navigation system is a satellite navigation system designed for use in automobiles. MEXMOMA project is presently running at an average run rate of 107 Min/Km to 95 Min/Km, which is running at 70% efficiency against the customer rate of 75 Min/Km. The objectives of the project are to Improve the current production rate from average 107 Min/Km to average 95 Min/Km. To increase financial gains and the customer satisfaction due to increased efficiency and more accurate map data to increase the market share and scalability. The methodology implemented here to address the issue is DMAIC methodology to increase the productivity and accuracy of the project. And the results of this project are production run rate was improved from 107 Min/Km to 94.07 Min/Km, resulting efficiency improvement from 70% to 80%, i.e., 10% improvement. Cost Benefit: 10% efficiency improvement has leaded to cast saving of $ 37,832, two engineers for this year and received customer feedback 7/7 with appreciation on the improvements done on the project.","abstract_html":"Synechron works for customer who is leading manufacturer of automotive navigation system. An automotive navigation system is a satellite navigation system designed for use in automobiles. MEXMOMA project is presently running at an average run rate of 107 Min/Km to 95 Min/Km, which is running at 70% efficiency against the customer rate of 75 Min/Km. The objectives of the project are to Improve the current production rate from average 107 Min/Km to average 95 Min/Km. To increase financial gains and the customer satisfaction due to increased efficiency and more accurate map data to increase the market share and scalability. The methodology implemented here to address the issue is DMAIC methodology to increase the productivity and accuracy of the project. And the results of this project are production run rate was improved from 107 Min/Km to 94.07 Min/Km, resulting efficiency improvement from 70% to 80%, i.e., 10% improvement. Cost Benefit: 10% efficiency improvement has leaded to cast saving of $ 37,832, two engineers for this year and received customer feedback 7/7 with appreciation on the improvements done on the project.","abstract_has_math":false,"creators":["Yaramada, Sathish"],"institution":null,"degree_name":"Engineering: M.E.M","degree_level":null,"degree_discipline":null,"degree_department":"Mechanical and Manufacturing Engineering","school":null,"contributors":[],"advisors":["Ben Baliga","Hiral Shah","Balasubrahmanian Kasi"],"committee_chairs":[],"committee_members":[],"year":2015,"date_issued":"2015-12-01","date_published":"2015-12-01","updated_at":"2026-11-27T09:55:58Z","subjects":["DMAIC","Six Sigma","Run Rate"],"languages":[],"rights":[],"rights_urls":["http://creativecommons.org/licenses/by-nc-nd/4.0/"],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["mme_etds-26"],"render_values":[{"text":"mme_etds-26","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/20.500.14755/2025","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/20.500.14755/2025","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Ast-cloud%3Aoai%3Arepository.stcloudstate.edu%3A20.500.14755%2F2025","prefix":"oai_dc"},"source_record":{"url":"https://repository.stcloudstate.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Arepository.stcloudstate.edu%3A20.500.14755%2F2025","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Ben Baliga","Hiral Shah","Balasubrahmanian Kasi"]},{"key":"dc:creator","label":"Author","values":["Yaramada, Sathish"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2026-08-17T14:59:08Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2016-02-07 20:00:32"]},{"key":"dc:date.issued","label":"Date","values":["2015-12-01"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["2015-12-22 11:28:52"]},{"key":"thesis:degree_college","label":"Thesis Degree College","values":["College of Science and Engineering"]},{"key":"thesis:degree_department","label":"Department","values":["Mechanical and Manufacturing Engineering"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Engineering: M.E.M"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["DMAIC","Six Sigma","Run Rate"]},{"key":"dc:subject.classification","label":"Dc Subject Classification","values":["Culminating Projects in Mechanical and Manufacturing Engineering"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights.uri","label":"Rights URI","values":["http://creativecommons.org/licenses/by-nc-nd/4.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["mme_etds-26"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/20.500.14755/2025"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["Synechron works for customer who is leading manufacturer of automotive navigation system. An automotive navigation system is a satellite navigation system designed for use in automobiles. MEXMOMA project is presently running at an average run rate of 107 Min/Km to 95 Min/Km, which is running at 70% efficiency against the customer rate of 75 Min/Km. The objectives of the project are to Improve the current production rate from average 107 Min/Km to average 95 Min/Km. To increase financial gains and the customer satisfaction due to increased efficiency and more accurate map data to increase the market share and scalability. The methodology implemented here to address the issue is DMAIC methodology to increase the productivity and accuracy of the project. And the results of this project are production run rate was improved from 107 Min/Km to 94.07 Min/Km, resulting efficiency improvement from 70% to 80%, i.e., 10% improvement. Cost Benefit: 10% efficiency improvement has leaded to cast saving of $ 37,832, two engineers for this year and received customer feedback 7/7 with appreciation on the improvements done on the project."]},{"key":"dc:format","label":"Dc Format","values":["starred"]},{"key":"dc:title","label":"Title","values":["Improving the Run Rate of Mobile Mapping Project"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Ben Baliga","Hiral Shah","Balasubrahmanian Kasi"],"dc:creator":["Yaramada, Sathish"],"dc:date.accessioned":["2026-08-17T14:59:08Z"],"dc:date.available":["2016-02-07 20:00:32"],"dc:date.issued":["2015-12-01"],"dc:date.submitted":["2015-12-22 11:28:52"],"dc:description.abstract":["Synechron works for customer who is leading manufacturer of automotive navigation system. An automotive navigation system is a satellite navigation system designed for use in automobiles. MEXMOMA project is presently running at an average run rate of 107 Min/Km to 95 Min/Km, which is running at 70% efficiency against the customer rate of 75 Min/Km. The objectives of the project are to Improve the current production rate from average 107 Min/Km to average 95 Min/Km. To increase financial gains and the customer satisfaction due to increased efficiency and more accurate map data to increase the market share and scalability. The methodology implemented here to address the issue is DMAIC methodology to increase the productivity and accuracy of the project. And the results of this project are production run rate was improved from 107 Min/Km to 94.07 Min/Km, resulting efficiency improvement from 70% to 80%, i.e., 10% improvement. Cost Benefit: 10% efficiency improvement has leaded to cast saving of $ 37,832, two engineers for this year and received customer feedback 7/7 with appreciation on the improvements done on the project."],"dc:format":["starred"],"dc:identifier.other":["mme_etds-26"],"dc:identifier.uri":["https://hdl.handle.net/20.500.14755/2025"],"dc:rights.uri":["http://creativecommons.org/licenses/by-nc-nd/4.0/"],"dc:subject":["DMAIC","Six Sigma","Run Rate"],"dc:subject.classification":["Culminating Projects in Mechanical and Manufacturing Engineering"],"dc:title":["Improving the Run Rate of Mobile Mapping Project"],"others:access_status":["open.access"],"thesis:degree_college":["College of Science and Engineering"],"thesis:degree_department":["Mechanical and Manufacturing Engineering"],"thesis:degree_name":["Engineering: M.E.M"]},"updated_at":"2026-11-27T09:55:58Z"}