{"id":{"repo_id":"st-cloud","oai_identifier":"oai:repository.stcloudstate.edu:20.500.14755/2049"},"canonical_url":"https://search.ndltd.org/etd/st-cloud/oai:repository.stcloudstate.edu:20.500.14755/2049","repository":{"repo_id":"st-cloud","name":"St. Cloud State University","base_url":"https://repository.stcloudstate.edu/server/oai/request"},"display":{"title":"Reduce the Customer’s Complaint Resolution Time in Migration of Oracle Database Servers in Vmware","abstract":"The following report titled “Reduce the Customer’s Complaint Resolution time in migration of oracle database servers in VMware” clearly elaborates about the process, technical design and flow of the VMware support project. The whole processed is carried out at NTT data, which is a client of VMware technologies, Inc. Since 1967, NTT DATA has played an instrumental role in establishing and advancing Japanese IT infrastructure, in particular large-scale and mission critical IT systems. Originally Data Communication Headquarter of Nippon Telegraph and Telephone Public Corporation, its heritage contributed to social benefits with a quality-first mindset. Having spun-off from NTT in 1988 and going public in 1995, the company maintained a hybrid culture of long-term commitment and challenge to innovation in order to contribute to the progression of business and society. Tier-1 IP network is driven by financially-backed service level agreements (SLAs), secure networking and managed VPNs, reliable content distribution capability via Smart Content Delivery. Across the organization without any geographical specification, an average of 185 support tickets is being generated on a daily basis. Generally a Service level agreement is done initially between the company and the in order to achieve the success rate of the projects. An initial study has been conducted In VMware support project to see whether if the resolution time in SLA is meeting the client requirement. But It is observed that process mean of resolution time is at is at 9.146 hrs. and Standard deviation is 3.081 hrs. To improve the Resolution time of oracle support database project on VMware to meet the client SLA of 8hrs. Also to 3 consider if any external and internal factors affect the root cause of the study. The Process improvement initiative for making this process as capable. DMAIC Methodology, Box plot, probability chart are used in the project for the measuring and study of the process.","abstract_html":"The following report titled “Reduce the Customer’s Complaint Resolution time in migration of oracle database servers in VMware” clearly elaborates about the process, technical design and flow of the VMware support project. The whole processed is carried out at NTT data, which is a client of VMware technologies, Inc. Since 1967, NTT DATA has played an instrumental role in establishing and advancing Japanese IT infrastructure, in particular large-scale and mission critical IT systems. Originally Data Communication Headquarter of Nippon Telegraph and Telephone Public Corporation, its heritage contributed to social benefits with a quality-first mindset. Having spun-off from NTT in 1988 and going public in 1995, the company maintained a hybrid culture of long-term commitment and challenge to innovation in order to contribute to the progression of business and society. Tier-1 IP network is driven by financially-backed service level agreements (SLAs), secure networking and managed VPNs, reliable content distribution capability via Smart Content Delivery. Across the organization without any geographical specification, an average of 185 support tickets is being generated on a daily basis. Generally a Service level agreement is done initially between the company and the in order to achieve the success rate of the projects. An initial study has been conducted In VMware support project to see whether if the resolution time in SLA is meeting the client requirement. But It is observed that process mean of resolution time is at is at 9.146 hrs. and Standard deviation is 3.081 hrs. To improve the Resolution time of oracle support database project on VMware to meet the client SLA of 8hrs. Also to 3 consider if any external and internal factors affect the root cause of the study. The Process improvement initiative for making this process as capable. DMAIC Methodology, Box plot, probability chart are used in the project for the measuring and study of the process.","abstract_has_math":false,"creators":["Thota, Ravi chandra"],"institution":null,"degree_name":"Engineering: M.E.M","degree_level":null,"degree_discipline":null,"degree_department":"Mechanical and Manufacturing Engineering","school":null,"contributors":[],"advisors":["Dr.Ben Baliga","Dr. Hiral Shah","Prof. Kasi Balasubramanian"],"committee_chairs":[],"committee_members":[],"year":2015,"date_issued":"2015-12-01","date_published":"2015-12-01","updated_at":"2026-11-27T09:55:52Z","subjects":["Six Sigma","DMAIC","VMware","Oracle Database Migration"],"languages":[],"rights":[],"rights_urls":["http://creativecommons.org/licenses/by-nc-nd/4.0/"],"identifier_entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["mme_etds-19"],"render_values":[{"text":"mme_etds-19","href":null,"code":true}]}],"person_identifier_entries":[]},"links":{"outbound_url":"https://hdl.handle.net/20.500.14755/2049","outbound_label":"Handle","outbound_source":"dc:identifier.uri","record_url":"https://hdl.handle.net/20.500.14755/2049","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier.uri","access_status":null,"embargo_until":null,"access_note":null},"oai_pmh_record":{"url":"https://union.ndltd.org/oai-pmh/?verb=GetRecord&metadataPrefix=oai_dc&identifier=oai%3Aunion.ndltd.org%3Arepo%3Ast-cloud%3Aoai%3Arepository.stcloudstate.edu%3A20.500.14755%2F2049","prefix":"oai_dc"},"source_record":{"url":"https://repository.stcloudstate.edu/server/oai/request?verb=GetRecord&metadataPrefix=dim&identifier=oai%3Arepository.stcloudstate.edu%3A20.500.14755%2F2049","prefix":"dim"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:contributor.advisor","label":"Advisor","values":["Dr.Ben Baliga","Dr. Hiral Shah","Prof. Kasi Balasubramanian"]},{"key":"dc:creator","label":"Author","values":["Thota, Ravi chandra"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date.accessioned","label":"Dc Date Accessioned","values":["2026-08-17T14:59:14Z"]},{"key":"dc:date.available","label":"Dc Date Available","values":["2015-12-20 20:35:24"]},{"key":"dc:date.issued","label":"Date","values":["2015-12-01"]},{"key":"dc:date.submitted","label":"Dc Date Submitted","values":["2015-11-29 19:19:59"]},{"key":"thesis:degree_college","label":"Thesis Degree College","values":["College of Science and Engineering"]},{"key":"thesis:degree_department","label":"Department","values":["Mechanical and Manufacturing Engineering"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Engineering: M.E.M"]}]},{"id":"subjects_keywords","label":"Subjects and Keywords","entries":[{"key":"dc:subject","label":"Dc Subject","values":["Six Sigma","DMAIC","VMware","Oracle Database Migration"]},{"key":"dc:subject.classification","label":"Dc Subject Classification","values":["Culminating Projects in Mechanical and Manufacturing Engineering"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:rights.uri","label":"Rights URI","values":["http://creativecommons.org/licenses/by-nc-nd/4.0/"]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier.other","label":"Dc Identifier Other","values":["mme_etds-19"]},{"key":"dc:identifier.uri","label":"Identifier URI","values":["https://hdl.handle.net/20.500.14755/2049"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description.abstract","label":"Abstract","values":["The following report titled “Reduce the Customer’s Complaint Resolution time in migration of oracle database servers in VMware” clearly elaborates about the process, technical design and flow of the VMware support project. The whole processed is carried out at NTT data, which is a client of VMware technologies, Inc. Since 1967, NTT DATA has played an instrumental role in establishing and advancing Japanese IT infrastructure, in particular large-scale and mission critical IT systems. Originally Data Communication Headquarter of Nippon Telegraph and Telephone Public Corporation, its heritage contributed to social benefits with a quality-first mindset. Having spun-off from NTT in 1988 and going public in 1995, the company maintained a hybrid culture of long-term commitment and challenge to innovation in order to contribute to the progression of business and society. Tier-1 IP network is driven by financially-backed service level agreements (SLAs), secure networking and managed VPNs, reliable content distribution capability via Smart Content Delivery. Across the organization without any geographical specification, an average of 185 support tickets is being generated on a daily basis. Generally a Service level agreement is done initially between the company and the in order to achieve the success rate of the projects. An initial study has been conducted In VMware support project to see whether if the resolution time in SLA is meeting the client requirement. But It is observed that process mean of resolution time is at is at 9.146 hrs. and Standard deviation is 3.081 hrs. To improve the Resolution time of oracle support database project on VMware to meet the client SLA of 8hrs. Also to 3 consider if any external and internal factors affect the root cause of the study. The Process improvement initiative for making this process as capable. DMAIC Methodology, Box plot, probability chart are used in the project for the measuring and study of the process."]},{"key":"dc:format","label":"Dc Format","values":["thesis"]},{"key":"dc:title","label":"Title","values":["Reduce the Customer’s Complaint Resolution Time in Migration of Oracle Database Servers in Vmware"]},{"key":"others:access_status","label":"Others Access Status","values":["open.access"]}]}],"canonical_facts":{"dc:contributor.advisor":["Dr.Ben Baliga","Dr. Hiral Shah","Prof. Kasi Balasubramanian"],"dc:creator":["Thota, Ravi chandra"],"dc:date.accessioned":["2026-08-17T14:59:14Z"],"dc:date.available":["2015-12-20 20:35:24"],"dc:date.issued":["2015-12-01"],"dc:date.submitted":["2015-11-29 19:19:59"],"dc:description.abstract":["The following report titled “Reduce the Customer’s Complaint Resolution time in migration of oracle database servers in VMware” clearly elaborates about the process, technical design and flow of the VMware support project. The whole processed is carried out at NTT data, which is a client of VMware technologies, Inc. Since 1967, NTT DATA has played an instrumental role in establishing and advancing Japanese IT infrastructure, in particular large-scale and mission critical IT systems. Originally Data Communication Headquarter of Nippon Telegraph and Telephone Public Corporation, its heritage contributed to social benefits with a quality-first mindset. Having spun-off from NTT in 1988 and going public in 1995, the company maintained a hybrid culture of long-term commitment and challenge to innovation in order to contribute to the progression of business and society. Tier-1 IP network is driven by financially-backed service level agreements (SLAs), secure networking and managed VPNs, reliable content distribution capability via Smart Content Delivery. Across the organization without any geographical specification, an average of 185 support tickets is being generated on a daily basis. Generally a Service level agreement is done initially between the company and the in order to achieve the success rate of the projects. An initial study has been conducted In VMware support project to see whether if the resolution time in SLA is meeting the client requirement. But It is observed that process mean of resolution time is at is at 9.146 hrs. and Standard deviation is 3.081 hrs. To improve the Resolution time of oracle support database project on VMware to meet the client SLA of 8hrs. Also to 3 consider if any external and internal factors affect the root cause of the study. The Process improvement initiative for making this process as capable. DMAIC Methodology, Box plot, probability chart are used in the project for the measuring and study of the process."],"dc:format":["thesis"],"dc:identifier.other":["mme_etds-19"],"dc:identifier.uri":["https://hdl.handle.net/20.500.14755/2049"],"dc:rights.uri":["http://creativecommons.org/licenses/by-nc-nd/4.0/"],"dc:subject":["Six Sigma","DMAIC","VMware","Oracle Database Migration"],"dc:subject.classification":["Culminating Projects in Mechanical and Manufacturing Engineering"],"dc:title":["Reduce the Customer’s Complaint Resolution Time in Migration of Oracle Database Servers in Vmware"],"others:access_status":["open.access"],"thesis:degree_college":["College of Science and Engineering"],"thesis:degree_department":["Mechanical and Manufacturing Engineering"],"thesis:degree_name":["Engineering: M.E.M"]},"updated_at":"2026-11-27T09:55:52Z"}