{"id":{"repo_id":"ubc","oai_identifier":"oai:circle.library.ubc.ca:2429/20421"},"canonical_url":"https://search.ndltd.org/etd/ubc/oai:circle.library.ubc.ca:2429/20421","repository":{"repo_id":"ubc","name":"University of British Columbia","base_url":"http://circle.library.ubc.ca/oai/request"},"display":{"title":"Propagation of the wave front on untransposed overhead and underground transmission lines","abstract":"The propagation of the switching surge wave front on multiphase power lines was investigated by modal analysis and conventional Fourier Transformation. A 500 kV untransposed, three-phase transmission line, for which field test results were available, was chosen as a test case. Phase A of this test line was excited from a double exponential voltage source and the voltage response at the receiving end was calculated and measured in all three phases. The calculated voltage arrival time matched closely the measured value, and was very close to the time taken by electromagnetic waves in air at a speed of 0.3 km/μs. The calculated voltage response curves also came close to the measured results (errors within 8%).","abstract_html":"The propagation of the switching surge wave front on multiphase power lines was investigated by modal analysis and conventional Fourier Transformation. A 500 kV untransposed, three-phase transmission line, for which field test results were available, was chosen as a test case. Phase A of this test line was excited from a double exponential voltage source and the voltage response at the receiving end was calculated and measured in all three phases. The calculated voltage arrival time matched closely the measured value, and was very close to the time taken by electromagnetic waves in air at a speed of 0.3 km/μs. The calculated voltage response curves also came close to the measured results (errors within 8%).","abstract_has_math":false,"creators":["Lee, Kai-Chung"],"institution":"University of British Columbia","degree_name":"Master of Applied Science - MASc","degree_level":"master's","degree_discipline":"Electrical and Computer Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1977,"date_issued":"1977","date_published":"1977","updated_at":"2026-11-19T14:39:03Z","subjects":[],"languages":["eng"],"rights":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/2429/20421","outbound_label":"Handle","outbound_source":"dc:identifier","record_url":"http://hdl.handle.net/2429/20421","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier","download_url":"http://circle.library.ubc.ca/bitstream/2429/20421/1/UBC_1977_A7+L44.pdf","download_label":"Download PDF","download_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"http://circle.library.ubc.ca/oai/request?verb=GetRecord&metadataPrefix=etdms&identifier=oai%3Acircle.library.ubc.ca%3A2429%2F20421","prefix":"etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Lee, Kai-Chung"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1977"]},{"key":"dc:publisher","label":"Institution","values":["University of British Columbia"]},{"key":"dc:type","label":"Dc Type","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Electrical and Computer Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Applied Science - MASc"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of British Columbia"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://hdl.handle.net/2429/20421","http://circle.library.ubc.ca/bitstream/2429/20421/1/UBC_1977_A7+L44.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["The propagation of the switching surge wave front on multiphase power lines was investigated by modal analysis and conventional Fourier Transformation. A 500 kV untransposed, three-phase transmission line, for which field test results were available, was chosen as a test case. Phase A of this test line was excited from a double exponential voltage source and the voltage response at the receiving end was calculated and measured in all three phases. The calculated voltage arrival time matched closely the measured value, and was very close to the time taken by electromagnetic waves in air at a speed of 0.3 km/μs. The calculated voltage response curves also came close to the measured results (errors within 8%)."]},{"key":"dc:format","label":"Dc Format","values":["4513449","application/pdf"]},{"key":"dc:title","label":"Title","values":["Propagation of the wave front on untransposed overhead and underground transmission lines"]}]}],"canonical_facts":{"dc:creator":["Lee, Kai-Chung"],"dc:date":["1977"],"dc:description":["The propagation of the switching surge wave front on multiphase power lines was investigated by modal analysis and conventional Fourier Transformation. A 500 kV untransposed, three-phase transmission line, for which field test results were available, was chosen as a test case. Phase A of this test line was excited from a double exponential voltage source and the voltage response at the receiving end was calculated and measured in all three phases. The calculated voltage arrival time matched closely the measured value, and was very close to the time taken by electromagnetic waves in air at a speed of 0.3 km/μs. The calculated voltage response curves also came close to the measured results (errors within 8%)."],"dc:format":["4513449","application/pdf"],"dc:identifier":["http://hdl.handle.net/2429/20421","http://circle.library.ubc.ca/bitstream/2429/20421/1/UBC_1977_A7+L44.pdf"],"dc:language":["eng"],"dc:publisher":["University of British Columbia"],"dc:rights":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."],"dc:title":["Propagation of the wave front on untransposed overhead and underground transmission lines"],"dc:type":["Text"],"thesis:degree_discipline":["Electrical and Computer Engineering"],"thesis:degree_level":["master's"],"thesis:degree_name":["Master of Applied Science - MASc"],"thesis:institution_name":["University of British Columbia"]},"updated_at":"2026-11-19T14:39:03Z"}