{"id":{"repo_id":"ubc","oai_identifier":"oai:circle.library.ubc.ca:2429/28083"},"canonical_url":"https://search.ndltd.org/etd/ubc/oai:circle.library.ubc.ca:2429/28083","repository":{"repo_id":"ubc","name":"University of British Columbia","base_url":"http://circle.library.ubc.ca/oai/request"},"display":{"title":"Scheduling knowledge base for high-rise residential construction","abstract":"The objective of this thesis is to assemble the knowledge base which reflects the expertise of the building contractor as it relates to activity scoping and sequencing work for highrise residential construction projects. To facilitate the acquisition of practical construction scheduling knowledge, computerized project management capabilities were implemented into a medium size general building contractor, J.C. Scott Construction Ltd. of Vancouver. This company was used to represent the industry standards from which the knowledge is extracted. The process by which the computerized system was implemented and used in the field to acquire the knowledge is documented so that an understanding is gained regarding the nature of the acquired data. The knowledge acquired from the study is represented in the form of rule-based data and stored in databases structured for use in a knowledge-based expert system.","abstract_html":"The objective of this thesis is to assemble the knowledge base which reflects the expertise of the building contractor as it relates to activity scoping and sequencing work for highrise residential construction projects. To facilitate the acquisition of practical construction scheduling knowledge, computerized project management capabilities were implemented into a medium size general building contractor, J.C. Scott Construction Ltd. of Vancouver. This company was used to represent the industry standards from which the knowledge is extracted. The process by which the computerized system was implemented and used in the field to acquire the knowledge is documented so that an understanding is gained regarding the nature of the acquired data. The knowledge acquired from the study is represented in the form of rule-based data and stored in databases structured for use in a knowledge-based expert system.","abstract_has_math":false,"creators":["Tse, Henry Lai Han"],"institution":"University of British Columbia","degree_name":"Master of Applied Science - MASc","degree_level":"master's","degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1989,"date_issued":"1989","date_published":"1989","updated_at":"2026-11-19T14:44:58Z","subjects":[],"languages":["eng"],"rights":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/2429/28083","outbound_label":"Handle","outbound_source":"dc:identifier","record_url":"http://hdl.handle.net/2429/28083","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier","download_url":"http://circle.library.ubc.ca/bitstream/2429/28083/1/UBC_1989_A7+T63.pdf","download_label":"Download PDF","download_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"http://circle.library.ubc.ca/oai/request?verb=GetRecord&metadataPrefix=etdms&identifier=oai%3Acircle.library.ubc.ca%3A2429%2F28083","prefix":"etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Tse, Henry Lai Han"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1989"]},{"key":"dc:publisher","label":"Institution","values":["University of British Columbia"]},{"key":"dc:type","label":"Dc Type","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Applied Science - MASc"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of British Columbia"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://hdl.handle.net/2429/28083","http://circle.library.ubc.ca/bitstream/2429/28083/1/UBC_1989_A7+T63.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["The objective of this thesis is to assemble the knowledge base which reflects the expertise of the building contractor as it relates to activity scoping and sequencing work for highrise residential construction projects. To facilitate the acquisition of practical construction scheduling knowledge, computerized project management capabilities were implemented into a medium size general building contractor, J.C. Scott Construction Ltd. of Vancouver. This company was used to represent the industry standards from which the knowledge is extracted. The process by which the computerized system was implemented and used in the field to acquire the knowledge is documented so that an understanding is gained regarding the nature of the acquired data. The knowledge acquired from the study is represented in the form of rule-based data and stored in databases structured for use in a knowledge-based expert system."]},{"key":"dc:format","label":"Dc Format","values":["6952008","application/pdf"]},{"key":"dc:title","label":"Title","values":["Scheduling knowledge base for high-rise residential construction"]}]}],"canonical_facts":{"dc:creator":["Tse, Henry Lai Han"],"dc:date":["1989"],"dc:description":["The objective of this thesis is to assemble the knowledge base which reflects the expertise of the building contractor as it relates to activity scoping and sequencing work for highrise residential construction projects. To facilitate the acquisition of practical construction scheduling knowledge, computerized project management capabilities were implemented into a medium size general building contractor, J.C. Scott Construction Ltd. of Vancouver. This company was used to represent the industry standards from which the knowledge is extracted. The process by which the computerized system was implemented and used in the field to acquire the knowledge is documented so that an understanding is gained regarding the nature of the acquired data. The knowledge acquired from the study is represented in the form of rule-based data and stored in databases structured for use in a knowledge-based expert system."],"dc:format":["6952008","application/pdf"],"dc:identifier":["http://hdl.handle.net/2429/28083","http://circle.library.ubc.ca/bitstream/2429/28083/1/UBC_1989_A7+T63.pdf"],"dc:language":["eng"],"dc:publisher":["University of British Columbia"],"dc:rights":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."],"dc:title":["Scheduling knowledge base for high-rise residential construction"],"dc:type":["Text"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["master's"],"thesis:degree_name":["Master of Applied Science - MASc"],"thesis:institution_name":["University of British Columbia"]},"updated_at":"2026-11-19T14:44:58Z"}