{"id":{"repo_id":"ubc","oai_identifier":"oai:circle.library.ubc.ca:2429/29751"},"canonical_url":"https://search.ndltd.org/etd/ubc/oai:circle.library.ubc.ca:2429/29751","repository":{"repo_id":"ubc","name":"University of British Columbia","base_url":"http://circle.library.ubc.ca/oai/request"},"display":{"title":"Geotechnical design of the McLellan Mine, Lynn Lake, Manitoba","abstract":"The overall objective of any geotechnical mine design procedure must be to maximize the extraction of the ore reserves while maintaining the integrity of the working areas. At the McLellan Mine the cut-and-fill mining method was first adopted. This decision was made for flexibility in the size and shape of the mine openings to allow for the variability in width and grade of the ore zone. As a result the geotechnical design of the cut-and-fill stopes necessitated investigations to evaluate the character of the rock mass with regard to the hydrogeology, lithology, structural geology, rock strength and rock mass ratings at the site and to assess the in-situ stress conditions. In addition, the character of the backfill material had to be estimated prior to detailed testing. Based upon these parameters two dimensional finite element analyses were completed, the sill pillar and the two stopes were designed. Finally, remedial rock reinforcement was recommended for suspected unstable spans.","abstract_html":"The overall objective of any geotechnical mine design procedure must be to maximize the extraction of the ore reserves while maintaining the integrity of the working areas. At the McLellan Mine the cut-and-fill mining method was first adopted. This decision was made for flexibility in the size and shape of the mine openings to allow for the variability in width and grade of the ore zone. As a result the geotechnical design of the cut-and-fill stopes necessitated investigations to evaluate the character of the rock mass with regard to the hydrogeology, lithology, structural geology, rock strength and rock mass ratings at the site and to assess the in-situ stress conditions. In addition, the character of the backfill material had to be estimated prior to detailed testing. Based upon these parameters two dimensional finite element analyses were completed, the sill pillar and the two stopes were designed. Finally, remedial rock reinforcement was recommended for suspected unstable spans.","abstract_has_math":false,"creators":["Rotzien, Joey Lou"],"institution":"University of British Columbia","degree_name":"Master of Applied Science - MASc","degree_level":"master's","degree_discipline":"Mining Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1989,"date_issued":"1989","date_published":"1989","updated_at":"2026-11-19T14:45:38Z","subjects":[],"languages":["eng"],"rights":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/2429/29751","outbound_label":"Handle","outbound_source":"dc:identifier","record_url":"http://hdl.handle.net/2429/29751","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier","download_url":"http://circle.library.ubc.ca/bitstream/2429/29751/1/UBC_1990_A7+R67.pdf","download_label":"Download PDF","download_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"http://circle.library.ubc.ca/oai/request?verb=GetRecord&metadataPrefix=etdms&identifier=oai%3Acircle.library.ubc.ca%3A2429%2F29751","prefix":"etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Rotzien, Joey Lou"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1989"]},{"key":"dc:publisher","label":"Institution","values":["University of British Columbia"]},{"key":"dc:type","label":"Dc Type","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Mining Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Applied Science - MASc"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of British Columbia"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://hdl.handle.net/2429/29751","http://circle.library.ubc.ca/bitstream/2429/29751/1/UBC_1990_A7+R67.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["The overall objective of any geotechnical mine design procedure must be to maximize the extraction of the ore reserves while maintaining the integrity of the working areas. At the McLellan Mine the cut-and-fill mining method was first adopted. This decision was made for flexibility in the size and shape of the mine openings to allow for the variability in width and grade of the ore zone. As a result the geotechnical design of the cut-and-fill stopes necessitated investigations to evaluate the character of the rock mass with regard to the hydrogeology, lithology, structural geology, rock strength and rock mass ratings at the site and to assess the in-situ stress conditions. In addition, the character of the backfill material had to be estimated prior to detailed testing. Based upon these parameters two dimensional finite element analyses were completed, the sill pillar and the two stopes were designed. Finally, remedial rock reinforcement was recommended for suspected unstable spans."]},{"key":"dc:format","label":"Dc Format","values":["12888458","application/pdf"]},{"key":"dc:title","label":"Title","values":["Geotechnical design of the McLellan Mine, Lynn Lake, Manitoba"]}]}],"canonical_facts":{"dc:creator":["Rotzien, Joey Lou"],"dc:date":["1989"],"dc:description":["The overall objective of any geotechnical mine design procedure must be to maximize the extraction of the ore reserves while maintaining the integrity of the working areas. At the McLellan Mine the cut-and-fill mining method was first adopted. This decision was made for flexibility in the size and shape of the mine openings to allow for the variability in width and grade of the ore zone. As a result the geotechnical design of the cut-and-fill stopes necessitated investigations to evaluate the character of the rock mass with regard to the hydrogeology, lithology, structural geology, rock strength and rock mass ratings at the site and to assess the in-situ stress conditions. In addition, the character of the backfill material had to be estimated prior to detailed testing. Based upon these parameters two dimensional finite element analyses were completed, the sill pillar and the two stopes were designed. Finally, remedial rock reinforcement was recommended for suspected unstable spans."],"dc:format":["12888458","application/pdf"],"dc:identifier":["http://hdl.handle.net/2429/29751","http://circle.library.ubc.ca/bitstream/2429/29751/1/UBC_1990_A7+R67.pdf"],"dc:language":["eng"],"dc:publisher":["University of British Columbia"],"dc:rights":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."],"dc:title":["Geotechnical design of the McLellan Mine, Lynn Lake, Manitoba"],"dc:type":["Text"],"thesis:degree_discipline":["Mining Engineering"],"thesis:degree_level":["master's"],"thesis:degree_name":["Master of Applied Science - MASc"],"thesis:institution_name":["University of British Columbia"]},"updated_at":"2026-11-19T14:45:38Z"}