{"id":{"repo_id":"ubc","oai_identifier":"oai:circle.library.ubc.ca:2429/35178"},"canonical_url":"https://search.ndltd.org/etd/ubc/oai:circle.library.ubc.ca:2429/35178","repository":{"repo_id":"ubc","name":"University of British Columbia","base_url":"http://circle.library.ubc.ca/oai/request"},"display":{"title":"Network planning and resource allocation for project control","abstract":"The problems involved in network planning for project control are examined with reference to the published work in this field. Various solutions are described and compared. A detailed investigation is made of the standard assumptions concerning expected activity durations. The different approaches to the estimation of these times are shown to be inconsistent with their areas of application. A global heuristic solution to the problem of finding the minimum value of the maximum resource requirement during a project is presented. This procedure uses a modified resource profile. The results of a comparison between this solution and a standard local solution indicate a slight improvement with a considerable increase in computing time. The new approach permits easier subminimization. A combination of these methods is proposed.","abstract_html":"The problems involved in network planning for project control are examined with reference to the published work in this field. Various solutions are described and compared. A detailed investigation is made of the standard assumptions concerning expected activity durations. The different approaches to the estimation of these times are shown to be inconsistent with their areas of application. A global heuristic solution to the problem of finding the minimum value of the maximum resource requirement during a project is presented. This procedure uses a modified resource profile. The results of a comparison between this solution and a standard local solution indicate a slight improvement with a considerable increase in computing time. The new approach permits easier subminimization. A combination of these methods is proposed.","abstract_has_math":false,"creators":["Arden, Nicholas Russel"],"institution":"University of British Columbia","degree_name":"Master of Science - MSc","degree_level":"master's","degree_discipline":"Computer Science","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1968,"date_issued":"1968","date_published":"1968","updated_at":"2026-11-19T14:48:42Z","subjects":[],"languages":["eng"],"rights":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/2429/35178","outbound_label":"Handle","outbound_source":"dc:identifier","record_url":"http://hdl.handle.net/2429/35178","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier","download_url":"http://circle.library.ubc.ca/bitstream/2429/35178/1/UBC_1969_A6_7+A73.pdf","download_label":"Download PDF","download_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"http://circle.library.ubc.ca/oai/request?verb=GetRecord&metadataPrefix=etdms&identifier=oai%3Acircle.library.ubc.ca%3A2429%2F35178","prefix":"etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Arden, Nicholas Russel"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1968"]},{"key":"dc:publisher","label":"Institution","values":["University of British Columbia"]},{"key":"dc:type","label":"Dc Type","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Computer Science"]},{"key":"thesis:degree_level","label":"Degree Level","values":["master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science - MSc"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of British Columbia"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://hdl.handle.net/2429/35178","http://circle.library.ubc.ca/bitstream/2429/35178/1/UBC_1969_A6_7+A73.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["The problems involved in network planning for project control are examined with reference to the published work in this field. Various solutions are described and compared. A detailed investigation is made of the standard assumptions concerning expected activity durations. The different approaches to the estimation of these times are shown to be inconsistent with their areas of application. A global heuristic solution to the problem of finding the minimum value of the maximum resource requirement during a project is presented. This procedure uses a modified resource profile. The results of a comparison between this solution and a standard local solution indicate a slight improvement with a considerable increase in computing time. The new approach permits easier subminimization. A combination of these methods is proposed."]},{"key":"dc:format","label":"Dc Format","values":["12559366","application/pdf"]},{"key":"dc:title","label":"Title","values":["Network planning and resource allocation for project control"]}]}],"canonical_facts":{"dc:creator":["Arden, Nicholas Russel"],"dc:date":["1968"],"dc:description":["The problems involved in network planning for project control are examined with reference to the published work in this field. Various solutions are described and compared. A detailed investigation is made of the standard assumptions concerning expected activity durations. The different approaches to the estimation of these times are shown to be inconsistent with their areas of application. A global heuristic solution to the problem of finding the minimum value of the maximum resource requirement during a project is presented. This procedure uses a modified resource profile. The results of a comparison between this solution and a standard local solution indicate a slight improvement with a considerable increase in computing time. The new approach permits easier subminimization. A combination of these methods is proposed."],"dc:format":["12559366","application/pdf"],"dc:identifier":["http://hdl.handle.net/2429/35178","http://circle.library.ubc.ca/bitstream/2429/35178/1/UBC_1969_A6_7+A73.pdf"],"dc:language":["eng"],"dc:publisher":["University of British Columbia"],"dc:rights":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."],"dc:title":["Network planning and resource allocation for project control"],"dc:type":["Text"],"thesis:degree_discipline":["Computer Science"],"thesis:degree_level":["master's"],"thesis:degree_name":["Master of Science - MSc"],"thesis:institution_name":["University of British Columbia"]},"updated_at":"2026-11-19T14:48:42Z"}