{"id":{"repo_id":"ubc","oai_identifier":"oai:circle.library.ubc.ca:2429/5335"},"canonical_url":"https://search.ndltd.org/etd/ubc/oai:circle.library.ubc.ca:2429/5335","repository":{"repo_id":"ubc","name":"University of British Columbia","base_url":"http://circle.library.ubc.ca/oai/request"},"display":{"title":"Economic risk quantification of toll highway projects","abstract":"The objectives of this thesis are to model economic and financial performance of user-pay highway facilities, to explore the sensitivity of project performance to changes in primary variables, to measure the uncertainty surrounding user-pay highway facilities, and to explore ways of reducing the uncertainty. Special attention is given to the revenue phase. The model consists of three levels: work package/revenue stream level; project performance level; and project decision level. The model calculates work package duration, work package cost, and revenue stream for the work package/revenue stream level; project duration, project cost, and project revenue for the project performance level; and project's net present value (NPV) for the project decision level. They are described by their expected value, standard deviation, skewness, and kurtosis. This model is applied to a numerical example patterned after a Japanese project to carry out a sensitivity and risk analysis, and highly sensitive primary variables are identified. The case study may be viewed as a comparison of current Japanese deterministic feasibility analysis with a probabilistic one, using the same underlying project model. Risk management strategies are presented, and their impacts on overall project risks are measured. Results from applying the model to a sample project show that it is very difficult for a highway operator alone to reduce risks. It is suggested that it is very important that risk sharing be negotiated with the government and some guarantee of support be received.","abstract_html":"The objectives of this thesis are to model economic and financial performance of user-pay highway facilities, to explore the sensitivity of project performance to changes in primary variables, to measure the uncertainty surrounding user-pay highway facilities, and to explore ways of reducing the uncertainty. Special attention is given to the revenue phase. The model consists of three levels: work package/revenue stream level; project performance level; and project decision level. The model calculates work package duration, work package cost, and revenue stream for the work package/revenue stream level; project duration, project cost, and project revenue for the project performance level; and project&#x27;s net present value (NPV) for the project decision level. They are described by their expected value, standard deviation, skewness, and kurtosis. This model is applied to a numerical example patterned after a Japanese project to carry out a sensitivity and risk analysis, and highly sensitive primary variables are identified. The case study may be viewed as a comparison of current Japanese deterministic feasibility analysis with a probabilistic one, using the same underlying project model. Risk management strategies are presented, and their impacts on overall project risks are measured. Results from applying the model to a sample project show that it is very difficult for a highway operator alone to reduce risks. It is suggested that it is very important that risk sharing be negotiated with the government and some guarantee of support be received.","abstract_has_math":false,"creators":["Hatakama, Toshiaki"],"institution":"University of British Columbia","degree_name":"Master of Applied Science - MASc","degree_level":"master's","degree_discipline":"Civil Engineering","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1994,"date_issued":"1994","date_published":"1994","updated_at":"2026-11-19T14:25:37Z","subjects":[],"languages":["eng"],"rights":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/2429/5335","outbound_label":"Handle","outbound_source":"dc:identifier","record_url":"http://hdl.handle.net/2429/5335","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier","download_url":"http://circle.library.ubc.ca/bitstream/2429/5335/1/ubc_1994-0445.pdf","download_label":"Download PDF","download_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"http://circle.library.ubc.ca/oai/request?verb=GetRecord&metadataPrefix=etdms&identifier=oai%3Acircle.library.ubc.ca%3A2429%2F5335","prefix":"etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Hatakama, Toshiaki"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1994"]},{"key":"dc:publisher","label":"Institution","values":["University of British Columbia"]},{"key":"dc:type","label":"Dc Type","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Civil Engineering"]},{"key":"thesis:degree_level","label":"Degree Level","values":["master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Applied Science - MASc"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of British Columbia"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://hdl.handle.net/2429/5335","http://circle.library.ubc.ca/bitstream/2429/5335/1/ubc_1994-0445.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["The objectives of this thesis are to model economic and financial performance of user-pay highway facilities, to explore the sensitivity of project performance to changes in primary variables, to measure the uncertainty surrounding user-pay highway facilities, and to explore ways of reducing the uncertainty. Special attention is given to the revenue phase. The model consists of three levels: work package/revenue stream level; project performance level; and project decision level. The model calculates work package duration, work package cost, and revenue stream for the work package/revenue stream level; project duration, project cost, and project revenue for the project performance level; and project's net present value (NPV) for the project decision level. They are described by their expected value, standard deviation, skewness, and kurtosis. This model is applied to a numerical example patterned after a Japanese project to carry out a sensitivity and risk analysis, and highly sensitive primary variables are identified. The case study may be viewed as a comparison of current Japanese deterministic feasibility analysis with a probabilistic one, using the same underlying project model. Risk management strategies are presented, and their impacts on overall project risks are measured. Results from applying the model to a sample project show that it is very difficult for a highway operator alone to reduce risks. It is suggested that it is very important that risk sharing be negotiated with the government and some guarantee of support be received."]},{"key":"dc:format","label":"Dc Format","values":["9271985","application/pdf"]},{"key":"dc:title","label":"Title","values":["Economic risk quantification of toll highway projects"]}]}],"canonical_facts":{"dc:creator":["Hatakama, Toshiaki"],"dc:date":["1994"],"dc:description":["The objectives of this thesis are to model economic and financial performance of user-pay highway facilities, to explore the sensitivity of project performance to changes in primary variables, to measure the uncertainty surrounding user-pay highway facilities, and to explore ways of reducing the uncertainty. Special attention is given to the revenue phase. The model consists of three levels: work package/revenue stream level; project performance level; and project decision level. The model calculates work package duration, work package cost, and revenue stream for the work package/revenue stream level; project duration, project cost, and project revenue for the project performance level; and project's net present value (NPV) for the project decision level. They are described by their expected value, standard deviation, skewness, and kurtosis. This model is applied to a numerical example patterned after a Japanese project to carry out a sensitivity and risk analysis, and highly sensitive primary variables are identified. The case study may be viewed as a comparison of current Japanese deterministic feasibility analysis with a probabilistic one, using the same underlying project model. Risk management strategies are presented, and their impacts on overall project risks are measured. Results from applying the model to a sample project show that it is very difficult for a highway operator alone to reduce risks. It is suggested that it is very important that risk sharing be negotiated with the government and some guarantee of support be received."],"dc:format":["9271985","application/pdf"],"dc:identifier":["http://hdl.handle.net/2429/5335","http://circle.library.ubc.ca/bitstream/2429/5335/1/ubc_1994-0445.pdf"],"dc:language":["eng"],"dc:publisher":["University of British Columbia"],"dc:rights":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."],"dc:title":["Economic risk quantification of toll highway projects"],"dc:type":["Text"],"thesis:degree_discipline":["Civil Engineering"],"thesis:degree_level":["master's"],"thesis:degree_name":["Master of Applied Science - MASc"],"thesis:institution_name":["University of British Columbia"]},"updated_at":"2026-11-19T14:25:37Z"}