{"id":{"repo_id":"ubc","oai_identifier":"oai:circle.library.ubc.ca:2429/5865"},"canonical_url":"https://search.ndltd.org/etd/ubc/oai:circle.library.ubc.ca:2429/5865","repository":{"repo_id":"ubc","name":"University of British Columbia","base_url":"http://circle.library.ubc.ca/oai/request"},"display":{"title":"Production planning for value added lumber manufacturing","abstract":"Difficulties in effectively managing opportunities for value added lumber manufacturing facilities have led to a need to develop production planning systems for these facilities. Two linear programming based models were developed for this purpose. One model is designed for independent value facilities; the other is designed for integrated value added facilities. In demonstrating the use of the models, analyses were made of a study operation. The purpose of these analyses, was to explore the influences value added facility production policies have on sawmill production decisions for an integrated value added facility. The results suggest that value added facility production decisions can have significant influence on sawmill production decisions for an integrated valued added production operation.","abstract_html":"Difficulties in effectively managing opportunities for value added lumber manufacturing facilities have led to a need to develop production planning systems for these facilities. Two linear programming based models were developed for this purpose. One model is designed for independent value facilities; the other is designed for integrated value added facilities. In demonstrating the use of the models, analyses were made of a study operation. The purpose of these analyses, was to explore the influences value added facility production policies have on sawmill production decisions for an integrated value added facility. The results suggest that value added facility production decisions can have significant influence on sawmill production decisions for an integrated valued added production operation.","abstract_has_math":false,"creators":["Donald, William Stuart"],"institution":"University of British Columbia","degree_name":"Master of Science - MSc","degree_level":"master's","degree_discipline":"Forestry","degree_department":null,"school":null,"contributors":[],"advisors":[],"committee_chairs":[],"committee_members":[],"year":1996,"date_issued":"1996","date_published":"1996","updated_at":"2026-11-19T14:26:02Z","subjects":[],"languages":["eng"],"rights":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."],"rights_urls":[],"identifier_entries":[],"person_identifier_entries":[]},"links":{"outbound_url":"http://hdl.handle.net/2429/5865","outbound_label":"Handle","outbound_source":"dc:identifier","record_url":"http://hdl.handle.net/2429/5865","record_label":"Repository record","record_kind":"handle","record_source":"dc:identifier","download_url":"http://circle.library.ubc.ca/bitstream/2429/5865/1/ubc_1997-0060.pdf","download_label":"Download PDF","download_source":"dc:identifier","access_status":null,"embargo_until":null,"access_note":null},"source_record":{"url":"http://circle.library.ubc.ca/oai/request?verb=GetRecord&metadataPrefix=etdms&identifier=oai%3Acircle.library.ubc.ca%3A2429%2F5865","prefix":"etdms"},"metadata_groups":[{"id":"people","label":"People","entries":[{"key":"dc:creator","label":"Author","values":["Donald, William Stuart"]}]},{"id":"academic_context","label":"Academic Context","entries":[{"key":"dc:date","label":"Dc Date","values":["1996"]},{"key":"dc:publisher","label":"Institution","values":["University of British Columbia"]},{"key":"dc:type","label":"Dc Type","values":["Text"]},{"key":"thesis:degree_discipline","label":"Discipline","values":["Forestry"]},{"key":"thesis:degree_level","label":"Degree Level","values":["master's"]},{"key":"thesis:degree_name","label":"Degree Name","values":["Master of Science - MSc"]},{"key":"thesis:institution_name","label":"Thesis Institution Name","values":["University of British Columbia"]}]},{"id":"language_rights","label":"Language and Rights","entries":[{"key":"dc:language","label":"Dc Language","values":["eng"]},{"key":"dc:rights","label":"Dc Rights","values":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."]}]},{"id":"identifiers","label":"Identifiers","entries":[{"key":"dc:identifier","label":"Identifier","values":["http://hdl.handle.net/2429/5865","http://circle.library.ubc.ca/bitstream/2429/5865/1/ubc_1997-0060.pdf"]}]},{"id":"additional","label":"Additional Metadata","entries":[{"key":"dc:description","label":"Description","values":["Difficulties in effectively managing opportunities for value added lumber manufacturing facilities have led to a need to develop production planning systems for these facilities. Two linear programming based models were developed for this purpose. One model is designed for independent value facilities; the other is designed for integrated value added facilities. In demonstrating the use of the models, analyses were made of a study operation. The purpose of these analyses, was to explore the influences value added facility production policies have on sawmill production decisions for an integrated value added facility. The results suggest that value added facility production decisions can have significant influence on sawmill production decisions for an integrated valued added production operation."]},{"key":"dc:format","label":"Dc Format","values":["1676373","application/pdf"]},{"key":"dc:title","label":"Title","values":["Production planning for value added lumber manufacturing"]}]}],"canonical_facts":{"dc:creator":["Donald, William Stuart"],"dc:date":["1996"],"dc:description":["Difficulties in effectively managing opportunities for value added lumber manufacturing facilities have led to a need to develop production planning systems for these facilities. Two linear programming based models were developed for this purpose. One model is designed for independent value facilities; the other is designed for integrated value added facilities. In demonstrating the use of the models, analyses were made of a study operation. The purpose of these analyses, was to explore the influences value added facility production policies have on sawmill production decisions for an integrated value added facility. The results suggest that value added facility production decisions can have significant influence on sawmill production decisions for an integrated valued added production operation."],"dc:format":["1676373","application/pdf"],"dc:identifier":["http://hdl.handle.net/2429/5865","http://circle.library.ubc.ca/bitstream/2429/5865/1/ubc_1997-0060.pdf"],"dc:language":["eng"],"dc:publisher":["University of British Columbia"],"dc:rights":["For non-commercial purposes only, such as research, private study and education. Additional conditions apply, see Terms of Use https://open.library.ubc.ca/terms_of_use."],"dc:title":["Production planning for value added lumber manufacturing"],"dc:type":["Text"],"thesis:degree_discipline":["Forestry"],"thesis:degree_level":["master's"],"thesis:degree_name":["Master of Science - MSc"],"thesis:institution_name":["University of British Columbia"]},"updated_at":"2026-11-19T14:26:02Z"}